Text
-
_~.
e' Entrp 5"' * * * < or* ' aea a. '"c-Operations 7;
R P. Darkhurst ATTACllMENT CONTAINS PHitSONAI,INFoltMATION W3 F1-91-0173 A -1. 05 QA September 16, 1991 U.S. Nuclear llegulatory Commission ATTN: Document control Desk Washington, D.C. 20555
Subject:
Waterfold 3 SES Doel;et No. 50-382 1,1 cense No. NPF-38 Emergency Plan Gentlemen:
Enclosed is a copy of Ituvision 15 of the Waterford 3 Emergency Plan which is submitted in aceoedance with 10CFil50.51(q). Itevision 15 supersedes Itevision 11 Change 1 which was filed with the NitC via Entergy Operations, Inc. letter W3 F 1 0120 dated June 11, 1991. This submittal is provided under affidavit per requirements of 10CFil50.
The changes to the Waterford 3 Emergency l'lan made by llevision 15 do not decrease the effectiveness cf the plan. Furthermore, the plan, as changed, continues to meet the standardc of 10CFil50.17(b) and the requirements of Appendix E to 10CFit50. Attached is a suunnary of itevision 15.
Please note that page 1-D of the Emergency Plan contains n radio frequency which is considered personal information. The single page with the personal information is attached; it is requested that this luformation be withheht from the public pursuant to 10CF]t2.790. The enclosure contains no personal information and may be considered a public copy.
[f I
,e L' -
9109190166 9109,o m (4,. 9cl/,v c n,.
16
\\
von avven wo r
evn i
I
/V6/C
/
/ /h
ATTACllMENT CONTAINS l'EllSONAl, IN1?OltMATION W31'l-91-0173 Emergency l>lan l'ago 2 September 16, 1991 l' lease contact I?.J. Englebracht, Emergency I'lanning & Administration Manager at (501) 739-G007 should you have any questions concerning the revised Emergency I' inn.
Very truly yours, hmiA ill'Il/TWd asf t
Enclosure / Attachments (w/ Enclosure & Attachments) cc:
It.D. Martin, NitC llegion IV (2 copies)
NHC ltesident inspectors Office (w/o Enclosure & Attachments) cc:
D.II. Spitzberg, NitC llegion IV S.E. Turk, NitC-NIllt 11.11, McGehee N.S. Iteynolds l
)
UNITED STATES OF Ah1EltlCA NUCLEAlt itEGULAToltY COhth11SSION In the matter of
)
)
1:ntergy Operations, incorporated
)
Docket No. 50-382 Waterford 3 Steam Electric Station
)
AFFIDAVIT lt.I'. llackhurst, being duly sworn, hereby deposes and says that he is Vic e President Operations - Waterford 3 of Entergy Operations, Incorporated; that he is duly aatharized to sign and file with the Nuclear llegulatory Commission the attaclied Itevision 15 to the Waterford 3 Emergency Plan; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the hest of his knowledge, information and belief.
\\
h i vWdi It.P. llarkhurst Vlee President Operations - Waterford 3 STATE OF LOUISIANA
)
) ss PAlt1S11 OF ST. Cll AllLES
)
Subscribed and sworn to before me, a Notary Public in and for the Parish and Stato above named this
/6?"' day of "M PTe/dd'c
,1991.
Notary Public hly Commission expires 2 /<0 ony
l PAGE 1 WATERFORD 3 SES EMERGENCY PLAN REVISION 15
SUMMARY
OF REVISION geetion 1. 0 - GlosPJKX 1.1.10 Title change from Corporate Command Center Director to Corporate Command Center Emergency Director.
Also deleted the acronym for this position since it is rarely used.
1.1.13 Added acronym for Duty Plant Manager.
1.1.23 Added responsibilities for offsite protective action recommendations and offsite notifications to be consistent with definition in 1.1.18, Emergency coordinator.
These are included in the responsibilities that are transferred f rom the EC to the EOF Director.
1.1.27 Changed Emergency Action Levels to Initiating Conditions to be consistent with Emergency Plan Implementing Procedure terminology.
1.1.57 Deleted reference to access control via the Hain Gate.
Access controls to t'ne Plant Centrolled Area have been removed.
1.1.70 Title change from operations Superintendent Nuclear to operations Superintendent.
Section 2.0 - Aonlicabilltv and Score Figure 2-2 Deleted Killona Elementary School.
The School has been closed.
Figure 2-3 Updated to reflect changes to the site.
- The Main Gate / Visitor Control center has been deleted.
- We no longer have a First Aid Duilding.
The First Aid activities are now performed in the Personnel Assurance Building, which was previously designated as Warehouse 1A.
- This figure also indicates the plant entranceo resulting from the deletion of the Main Gate / Visitor Control Center, geetion 3.0 - Emercene'v Plannina Procram Summary No significant changes here made in this section.
gpetion 4,0 - classification of Emerceneles 4.1.1 In the third paragraph, the first sentence was changed to reflect that we have provided the initiating conditions in Table 4-1 rather than a summary of the initiating conditions.
4.1.2 In the fourth paragraph, the first centence was changed to reflect that we have provided the initiating conditions in Table 4-1 rather than a summary of the initiating conditions.
PACE 2 l
WATERFORD 3 SES EMERGENCY PLAN RIVISION 15
SUMMARY
OF REVISION Section 4.0 - classificatien of Emerceneigs (cont'd1 4.1.3 In the third paragraph, the third sentence was changed to reflect that we have provided the initiating conditions in Table 4-1 rather than a summary of the initiating conditions.
4.1.4 In the fourth paragraph, the first sentence was changed to reflect that we have provided the initiating conditions in Table 4-1 rather than a summary of the initiating conditions.
Table 4-1 The previous revision of the Emergancy Plan included t. summary of initiating conditions.
We have r=<ised this table to list the complete set of initiating conditions for each classification directly from the approved Emergency Plan Implementing Procedures.
It should be noted that we have not changed any of the initiating conditions, only decided to reflect the actual initiating conditions in the Emergency Plan rather than summarizing them.
The initiating conditions provided have been approved by the NRC.
Table 4-5 Item 1 - Added Pressurizer Level.
Item 4 - Added Axial Shape Index and Azimuthal Tilt.
Item 7 - Corrected the " Range" for 1, 2, 3,
4, 5, & 7 to indicate that they are normally read on Panel CP-14 rather than from a computer point.
Item 8 - Added Diversified Reactor Trip Actuation and Diversified Emergency Feedwater Actuation.
Section 5.0 - oroanizattenal_ggntrol of rmeroencies 5.1.1.2 Paragraph I was changed to reflect changes in the plant organtsation.
The functions previously performed by the Engineering & Construction Department are now performed by two new departments:
Engineering, and Plant Hodification and Construction.
Paragraph 2 was changed to reflect that materials management purchasing and contracts functions are also part of the Site Support Organization.
Paragraph 3 was changed to reflect that the Safety Review Group and the Policy and Directives Group are also part of the Nuclear Safety Organization.
5.1.2.2f In the second sentence of the first paragraph, LP&L was changed to Entergy Operations, Inc. to reflect consolidation.
PAGE 3 WATERFORD 3 SES EMERGENCY PLAN REVISION 15
SUMMARY
OF REVISION igg}1pn 5.0 - Orcentrational control of teeroencies (Cent'd) 5.1.2.2)
The first paragraph was changed to clarify thtt the TSC Lead Communicator is responsible for coordinating communications with pffsite agencies.
The previous revision also included communications with the EOF and CCC.
Communications with these Entergy emergency facilities do not have to be coordinated through the Lead Communicator.
We also clarified the fact that only communications with offsite agencies need to have prior approval from the Emergency Coordinator.
5.1.2.2k The first paragraph was changed to clarify that the primary responsibility of the TSC Communicators is to transmit and receive information from offsite agencies.
5.1.2.3.lc4 Deleted 'NRC" from this paragraph.
Notification Message Forms are not normally provided to the NRC.
When the EOF is activated, communications with the NRC are continually maintained by the ENS Communicator.
5.1.2.3 Inl Changed offsite to Non-Entergy to clarify that prior approval is not needed for communications between Entergy organir.ations.
5.1.2.3.lol Added *Waterford 1&2, INPO, etc." to help clarify the term "offsite agencies".
5.1.2.3.lp3 This paragraph was changed to reflect that the Offsite Technical Advisor is also responsible for coordinating technical information with the Corporate Command Center.
5.3.2 This section was rewritten to clarify the role of the Stato agencies in support of the Waterford 3 SES in an emergency situation.
Figure 5-1A Thie table was changed to reflect changes in the Waterford 3 organization.
Figure 5-2 Notes E & F were added for clarification.
Figure 5-3 This figure was changed to reflect that the Administration /
Logistics coordinator and the Operations / Engineering Coordinator are no longer required for activation of the EOF.
The Operations / Engineering Coordinator Assistant and the Radiological Assessment Coordinator Assistant position blocks have been moved to more clearly indicate that these positions are designated to assist the operations / Engineering Coordinator and the Radiological Assessment Coordinator in their duties.
Table 5-2 Page 2 of 2 was changed to reflect that LOEP has a secondary responsibility for Liability & Claims.
Table 5,
This table was changed to update / correct facility responsibilities.
)
4 i
PAGE 4 i
WATERFORD 3 $ES EMERGENCY PLAN
~;
REVISION 15
SUMMARY
OF REVISION teetion 6.0 - croaniratienal centrel of tmeroenelen (cont'd) i
{
Table b-4 This table was updated to reflect that, in the event of a Control Room evacuation with a fire, the STA assumes the i
primary responsibility for emergency communications.
I Table 5-7 This table was changed to reflect that the Administration /
j Logistics coordinator has a support responsibility for r
development of emergency procedures.
t i
Table 5-9 This table was chanced to reflect a title change for the CCC Emergency Director and to update responsibilities.
e Section 6.0 - Emeroenev Peecense Measures
~~~
k i
i 6.2.2.2e i
_This paragraph was changed to correct terminology.
The Duty i
~~~
Plant Manager does not assume the responsibilities of Emergency Coordinatet until he relieves the SS.
In the context of this paragraph, Duty Plant Manager, rather than the Emergency Coordinator, is the correct terminology.
6.2.2.4a Itemn 1 & 2 were changed to clarify the_ interface with St. Charles Parish for emergency notifications.
6.2.2.5a Items 1 & 2 were changed to clarify the interface with St. John the Baptist Parish for emergency notifications.
1 6.2.2.6c Items 1 & 2 worr changed to reflect government department title I
- changes, j
6.2.2.6e & f
" Fixed Fact 11ty Response Team" and FTRT" were changed to " Field Monitoring Team" and "FMT" respectively.
This reflects the-updated LRPD terminology.-
6.6.3.1.
In the first paragraph "1,000 dpm" han been changed to "100 ept/ probe area above background" to more accurately reflect the methodology used by Health Physics.
Figure 6-1 This table has beest updated to reflect that the Technical spokesperson contacts the Entergy operations _ Corporate Communicator and the ENC Director. contacts the ENC Staff.
Figure 6-3 This-table has been changed to reflect the correct terminology
'for the alternate contacts in St. Charles Parish and St. John-the Baptist Parish.
p
I PAGE 5 WATERPORD 3 SES EMERGENCY PLAN i
REVISION 15
SUMMARY
OF REVISION Spetien 7.0 - Emeroency Peenonne racilities/Ecuinment 7.3.3 Paragraph I was changed to reflect the new address of the LRPD headquarters.
Paragraph 2 was changed to reflect the change in terminology for the LRPD radiological field monitoring teamn.
7.4.3 Paragraph 5 was changed to update the title for the National Dureau of Standards to the National Institute of Standards and Technology.
7.4.lla This section was updated to reflect that the emergency exhaust from the Condenser Vacuum Pumps Exhaust also goes through the plant stack.
It also reflects the deletion of the single-stage monitor on the Condenser Vacuum Pumps Exhaust.
This point is now monitored by a three-stage isokinetic monitor.
7.5.2.1 &
The paragraphs on the Operational Hotline (OHL) and the 7.5.2.2 Industrial Hotline (IHL) were interchanged to more clearly indicate that the OHL is the primary method of notification.
The NOTE was removed from the IHL section einee it was redundant with the text.
A statement was added to the end of the last paragraph of the OHL section to indicate that the IHL can be used as a backup means of notifying St. Charles Parish.
7.5.2.6 This paragraph was revised to reflect that a hotline circuit is also available in the OSC.
Figure 7-5 The " Operation Control Area" has been removed from this figure since it was confusing and did not add to the content of the drawing.
Figure 7-9a Added sample points DLQ1 and BLDl.
Figure 7-9 This figure was changed to reflect that Highway 310 has been opened between Highway 49 and Highway 61.
Table 7-1 Updated the scale and tanits for COND 9TG POOL LVL and Containment Pressure (Wide Hange).
Also changed " Narrow Range" to "CIAS, CSAS" for the Containment Pressure Instrumentation.
Table 7-6 Deleted the Go (L1) Detector which is no longer used in the Counting Room.
Section 8,0 - Maintenance of Emercenev Preparedness 8.1.1.4 In the first paragraph, the terminology " parish EOC Directors" was updated to " parish Emergency Directors".
_ _ _ _ _._ _ _ - _ _. - - - - - _ - - - - - - - - - - - - - ~ - - ^ - - - - - - - - ' - - - - - - - ^ " - - - - - - - - ' ' - - ~ ~ ^ ~
PAGE 6 WATERFORD 3 SES EMERGENCY PLAN REVISION 15
SUMMARY
OF REVISION Section 9.0 - Recevery No changes were made to this section.
Aprendix A - Mutual Assistance Pl.1D No changes were made to this Appendix.
hopendix B - Evacuatien Time Study No changes were made to this Appendix.
Aeoendix C - Letters of Acreement The annual confirmation letters were updated for Office of the Sheriff, St. Charles Parishi Hahnville Volunteer Fire Departmenti Union Pacific Railroad company; and Combu:* ion Encinat:1..,.
Appendix D - Louisiana Peacetime Padioleoical Pesconee_.P.lan No changes were made to this Appendix.
boveng x E - Louisiana Peacgtime Padiolocical PesDonne Plan Attachment
?,
No changes wars made to this Appendix.
Appendix P - Memo of Undgretandino I,
No enanges were made to this Appendix.
SEPfad.ix G - Emercenev Pesponse Eculement on page G-4, the 0-1R Dosimeters have been changed to 0-1.5R Dosimeters.
hypendix H - Procedure Cross Peference No changes were made to this Appendix.
broendix I Emeroency Medical AssietAnte Procram l
5.2.2 The words "and a regional burn conter" have been deleted from the end of the first paragraph.
West Jefferson Medical Center no longer maintains a regional burn center.
PAGE 7 WATERFORD 3 SES ERERCENCY PLAN REVISION 15
SUMMARY
OF REVIS!Oli hPM D. dix 1 - Fmercenev Medical Aseistanco Progtgm (Cont'd)
Att. 0.2 The annual confirmation letter frr West Jefferson Medical Center has been updated.
Anngnq[x _ J - HURPS OM4 cross Ref erent e No changus were made to this Appendix.
hgpsndix F. - Algrt /Not d.igAMon Syst em No changes were made to this Appendix.
-