Submits Results of Actions Taken to Comply W/Requirements of IE Bulletin 83-06, Nonconforming Matls Supplied by Tube-Line Corp. No Matls from Tube-Line Corp Supplied to Facility
ML20082T778
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 12/08/1983
From: James Smith
LONG ISLAND LIGHTING CO.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
REF-SSINS-6820 IEB-83-06, IEB-83-6, SNRC-987, NUDOCS 8312160128
Download: ML20082T778 (5)


Text

, .O gg LONG ISLAND LIGHTING COM PANY wam m SHOREHAM NUCLEAR POWER STATION P.O. BOX 618, NORTH COUNTRY ROAD e WADING RIVER. N.Y.11792 Direct Dial Number December 8, 1983 SNRC-987 Dr. Thomas E. Murley Regional Administrator U.S. Nuclear Regulatory Commission - Region I 631 Park Avenue King of Prussia, PA 19406 IE Bulletin No. 83-06: Nonconforming Materials Supplied By Tube-Line Corporation Facilities Shoreham Nuclear Power Station - Unit 1

Dear Dr. Murley:

LILCO hereby submits the results of the actions we took to comply with the requirements of IE Bulletin 83-06. These actions are prescribed on pages 4, 5, and 6 of the subject bulletin and our response corresponds item by item to these as follows:

1. We reviewed the lists of purchasing and receiving companies given in Attachments 2 and 3 of IE Bulletin 83-06 to determine if any Tube-Line supplied ASME Code materials were furnished to Shoreham. We then contacted all vendors on these lists that supplied Category I piping / equipment to Shoreham. In addition to the vendors on these lists, the following vendors were contacted prior to the issuance of the subject bulletin as a result of the work we directed to address the concerns of IE Information Notice No. 83-07.
1) Reactor Controls
2) General Electric Company (NED)
3) Transamerica DeLaval
4) Rockwell International All of the vendors we contacted stated that no materials from Tube-Line Corporation were supplied to Shoreham with their products.

8312160128 831200 PDR ADOCK 05000322 G PDR

{

llt

SNRC-987 December 8, 1983 Page 2 As mentioned, prior to the issuance of the subject bulletin LILCO initiated a review / survey of suppliers of Category I piping / equipment to address the concerns expressed in IE Information Notice No. 83-07. During the course of this review it was found that one Purchase Order (No. 11786) was placed with Tube-Line, however, the order was not for safety-related (Category I) materials.

In fact, the P.O. was for seventy-five data slides and one welding manual. These were used as classroom instructional aides.

2. Since the results of our review show that we did not install any ASME Ccdc materials supplied directly or indirectly by Tube-Line in safety-related systems the requirements of this item do not apply to shoreham.
3. The requirements of this item do not apply to Shoreham.
4. The contents of this letter should satisfy the requirements of the written report sought by this item.

As stated in item 1, no Tube-Line supplied materials have been furnished for use in safety-related systems at Shoreham.

The general concerns expressed in the subject bulletin were transmitted by the Office of Inspection and Enforcement on March 7, 1983 in IE Information Notice No. 83-07. LILCO began a review and investigation to determine if any of our major suppliers of Category I equipment / piping supplied piping materials to Shoreham that originated from Tube-Line. The results of our efforts are contained in item 1 of this letter.

In order to help you evaluate the cost of implementing the requirements of this bulletin we offer the following information:

a) Our estimate of the time it took to perform the requested inspections and evaluations needed to address the concerns of both IE Information Notice No. 83-07 and IE Bulletin No. 83-06 is fifty-five (55) engineering hours.

b) No radiation exposure doses were incurred.

c) Our estimate of the time spent to prepare this written response is eight (8) engineering hours.

s SNRC-987 December 8, 1983 Page 3 Should you or any members of your staff have any questions regarding our response to this bulletin please do not hesitate to call my office.

Very truly yours, J. L. Smith Manager, Special Projects Shoreham Nuclear Power Station GJG/ss S4 cc: C. Petrone All Parties Listed in Attachment 1

i ATTACIIMENT 1

.\

Lawrence Brenner, Esq. Herbert H. Brown, Esq. <

! Administrative Judge Lawrence Coe Lanpher, Esq.

Atomic . Safety -and Licensing Karla J. Letsche, Esq.

Board Panel Kirkpatrick, Lockhart, Hill l< U.S. Nuclear Regulatory Christopher & Phillips

~l Commission 8th Floor ij Washington, D.C. 20555 1900 M. Street, N.W.

^! Washington, D.C. 20036 4

Dr. Peter A. Morris Administrative Judge Mr. Marc W. Goldsmith ll Atomic Safety and Licensing Energy Research Group Board Panel 4001 Totten Pond Road U.S. Nuclear Regulatory Waltham, Massachusetts 02154 Commission Washington, D.C. 20555 MI!B Technical Associates 1723 Hamilton Avenue Dr. George A. Ferguson Suite K School of Engineering San Jose, California 95125 Howard University s irg ol .' 20b59 Stephen B. Latham, Esq.

1 Twomey, Latham & Shea

!;! , 33 West Second Street

.i Bernard M. Bordenick, Esq. P.O. Box 398

( David A. Repka, Esq. Riverhead, New York 11901

-I U.S. Nuclear Regulatory j ~

Commission -

" Washington, 20555 q D.C. Ralph Shapiro, Esq.

4 .

Cammer and Shapiro, P.C.

d 9 East 40th Street Mr. James Dougherty New York, New York 10016

l!
3045 Porter Street

^'

!! Washington, D.C. 20008 j)! Matthew J. Kelly, Esq.

State of New York jj Department of Public Service Three Empire State Plaza

- Albany, New York 12223 i5 u

9 e

+, - . . , . . , - - - - g,, . . . - - - - - - - - . , - y.. --.. v- - --.

,p.,-, ,n , , ~ , - . , - , . . , . , , , , , , , , , - , , , - - , - - , - -.

I AFFIDAVIT STATE OF NEW YORK)

ss.:

COUNTY OF SUFFOLK)

JEFFREY L. SMITH, being duly sworn, deposes and says that I am the Manager of Special Projects for Long Island Lighting Company, the owner of the Shoreham Nuclear Power Station. I have read the response to I.E. Bulletin 83-06 prepared under my direction. The facts set forth in said response are based upon reports and information provided to me by the employees, agents, and representatives of Long Island Lighting Company responsible for the activities described in said I.E. Bulletin and in said response. I- +

believe the facts set forth in said response are true, i.

4 Q RFy L.' SMITH J

Sworn to before me this 71 day of h h ,1983 0?&