Director,L0ffice of Resource Management.
' Monthly Operating' Report Page 2 November'14, 1983
. ATTACHMENT I
- AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50/395 UNIT V.
C.
SUMMER I DATE 11/14/83 COMPLETED BY G.
A.
Loignon TELEPHONE (803) 345-5209
' MONTH OCTOBER 1983 DAY' AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
894 17 816
~.
894 18.
-853 2
3..
893 19 893 4.
894 20.
319
'5.
- 892 21.
100 22.
224 6.
892' 7
893 23 43 8.
885 24.
654
=9 893 25.
892
- 10..
892 26.
893
- 11. _
893 27 894 12.1
-893 28.
895
'13
'860 29 894
-14.:
824 30.
894
.15. -
821 31.
893 16.
819
[DkkDO O
DR R
______x
..i LDirector,40ffice of Resource Management
' Monthly-Operating: Report
- Page 3' November 14,'1983 ATTACHMENT II
-OPERATING' DATA REPORT DOCKET NO.
50/395 UNIT V.
C. SUMMER I DATE 11/14/63 COMPLETED BY G.
A.
Loignon TELEPHONE (603) 345-5209 OPERATING STATUS 1.-Reporting Period:
OCTOBER 1983 Gross Hours in Reporting Period:
745 L2.JCurrently Authorized Power Level (MWt):
2775 Max.; Depend. Capacity (MWe-Net):
N/A Design: Electrical Rating (MWe-Net):
900 13.-Power-Level to.which restricted (If Any)(MWe-Net):
N/A L4. Reasons for Restrictions (If Any):
THIS MONTH YR TO DATE CUMULATIVE 5.cNumber:of' Hours-Reactor'Was Critical 711.4 5532.1 6838.9
- 16. Reactor Reserve Shutdown Hours 0
0
-0
_7.
Hours. Generator'on Line 689 4 5375.8 6137 1
- 8. Unit:ReservelShutdown Hours 0
0 0
9 10ross' Thermal _EnergyL0enerated (MWH)
-1,610,240 11,506,707 12,302,580 10.fGross: Electrical. Energy Generated (MWH).
581,251 3,566,471 3,779,667 607,880 3,781,572 3,997,789
- 11. Net Electrical: Energy Generated (MWH)
C12.-Reactor. Service Factor N/A N/A N/A
'13.1 Reactor Availability Factor N/A N/A N/A
- 14. Unit ~ Service Factor N/A N/A N/A
- 15. Unit' Availability Factor N/A N/A N/A L16. Unit Capacity Factor (Using MDC)
N/A N/A N/A
! 117 9 Unit'. Capacity Factor 1(Using. Design MWe)
N/A N/A N/A 18.; Unit Forced Outage Rate-N/A N/A N/A J19. Shutdowns' Scheduled Over Next.6 Months (Type, Date, and Duration of Each):
~
-Steam Generator Eddy Current, November 23, 1983 (approximately 15 days).
J20.:IfLShut Down at End of Report Period,' Estimated Date of Startup:
N/A
~21 1 Units in-Test Status (Prior to Commerical Operation):
~
FORECAST ACHIEVED Initial Criticality 10-20-82 10-22-82 Initia1' Electricity 11-17-82 11-16-82 Commercial Operation 01-01-84
,e-
.s
-u
.m r-e 4
y-
n
[
y l r (Dirsetor,3'ffi,ce_of~ Resource Management 0
M:nthly: Operating Report
- Pcge _ 4.-
Nov;mber :14, 1983/
' ATTACHMENT III-
-UNIT SHUTDOWNS AND POWER REDUCTIONS-DOCKET NO.'
50/395 UNIT V.
C.
SUMMER I DATE 11/14/63
. COMPLETED BY-G.
A.
Loignon<
TELEPHONE (803) 345-5209 (1)
METHOD OF (2)
TYPE-SHUTTING DOWN
.F: FORCED DURATION THE. REACTOR OR
-CORRECTIVE ACTIONS /
NO.
-DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER COMMENTS
';ML 831020 F
26.1-A 2
- 20) Faulty wire shorted
tripping Circ. Water Pumps.
21' 831022 F-2 9.' 6 '
A 2-
- 21) Leak in Turbine EHC-System.
ev
-v-
,)_i
' Director,-Office of Resource Management
- Monthly Operating Report:
-Page 5 November'14, 1983 ATTACHMENT IV
' NARRATIVE
SUMMARY
10F OPERATING EXPERIENCE-
! Virgil C.l Summer: Nuclear Station, Unit.No. 1, continued power Joperationiduring the month.of October 1983 L0n' October 20, 1983, at'0905 hours0.0105 days <br />0.251 hours <br />0.0015 weeks <br />3.443525e-4 months <br />, the Plant was manually tripped-from approximately-90% power following the loss.of.all
-Circulating Water Pumps._ The pumps had tripped. automatically.
when'one of the flood protection level switches-was accidently.
shorted'by plant _ personnel.
The-2/3. logic for flood protection wasLcompleted bytthis short since-the' supply breaker.for the s
redundant switches.was incorrectly.:in the "0FF" position.
The cause is attributed to' personnel error. ~ Plant performance during
- the eventJwas asfexpected.with no' events of~ safety significance.
On= October.22,-1983,:atL1053 hours,-the plant'was manually L
tripped from approximately 77% power..The trip was initiated whenithe; Shift Supervisor determined that an oil leak in the EHC System piping was high enough to preclude. running the plant back in a controlled. manner.
Plant response to the transient was normal
_and the source offthe= leak subsequently repaired.
~
90n October.31,-1983, operation was continuing at approximately 100%
power.
~
k
j',
l ur.
SOUTH CAROLINA ELECTRIC & GAS COMPANY post oppics 7e4 -
COLUMelA. SOUTH CAROLINA 29218 '
~O. W. DixON. JR.
Vice PossiosNT NucLEAm OrspAT:Jms November 14, 1983 LDirector,-Office.of Resource Management U. S. Nuclear _ Regulatory Commission
.MNBB 7602 Washington, DC 20555 ATTN:
Mr. Learned it. Barry
SUBJECT:
Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Monthly Operating Report
Dear.Mr. Barry:
Please find enclosed the-October 1983 Monthly Operating' Report for.
.the Virgil C. Summer' Nuclear Station Unit No. 1 as required by Technical Specification 6.9.1.10.
If-there are-any questions, please call us at your convenience.-
Ver trul yours,_
N O. W.
ixo,
r.
N GAL:0WD:mac Attachment cc:
V.10. Summer C. A.
Price E.-C.
Roberts-A. R. Koon E. H. Crews' O. L. Ligon (NSRC)
T. C. Nichols, Jr./0. W. Dixon, Jr.
G. J. Braddick H. N.!Cyrus D. J.
Richards H. R. Denton-NRC Res. Inspector J. P. O'Reilly-J. B.
Knotts, Jr.
" Group. Managers INPO Records Center O. S. Bradham NPCF-R. B._Clary File (Lic./Eng.)