Director,L0ffice of Resource Management.

' Monthly Operating' Report Page 2 November'14, 1983

. ATTACHMENT I

- AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE 11/14/83 COMPLETED BY G. A. Loignon TELEPHONE (803) 345-5209

' MONTH OCTOBER 1983 DAY' AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

1. 894 17 816

~.2 894 18. -853 3.. 893 19 893

4. 894 20. 319

'5 . :892 21. 100

6. 892' _
22. 224 7 893 __ _

23 43

8. , 885 24. 654

=9 893 25. 892

10. . 892 26. 893
11. _ 893 27 894 12.1 -893 28. 895

'13 '860 29 894

-14.: 824 30. 894

.15. - 821 31. 893

16. 819 O

[DkkDO DR R

______x

. .i LDirector,40ffice of Resource Management

' Monthly-Operating: Report

Page 3' November 14,'1983 ATTACHMENT II

-OPERATING' DATA REPORT DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE 11/14/63 COMPLETED BY G. A. Loignon TELEPHONE (603) 345-5209 OPERATING STATUS 1.-Reporting Period: OCTOBER 1983 Gross Hours in Reporting Period: 745 L2.JCurrently Authorized Power Level (MWt): 2775 Max.; Depend. Capacity (MWe-Net): N/A Design: Electrical Rating (MWe-Net): 900 13.-Power-Level to.which restricted (If Any)(MWe-Net): N/A L4. Reasons for Restrictions (If Any):

THIS MONTH YR TO DATE CUMULATIVE 5.cNumber:of' Hours-Reactor'Was Critical 711.4 5532.1 6838.9

16. Reactor Reserve Shutdown Hours 0 0 -0

_7. Hours. Generator'on Line 689 4 5375.8 6137 1

8. Unit:ReservelShutdown Hours 0 0 0 9 10ross' Thermal _EnergyL0enerated (MWH) -1,610,240 11,506,707 12,302,580 10.fGross: Electrical. Energy Generated (MWH) . 607,880 3,781,572 3,997,789
11. Net Electrical: Energy Generated (MWH) 581,251 3,566,471 3,779,667 C12.-Reactor. Service Factor N/A N/A N/A

'13.1 Reactor Availability Factor N/A N/A N/A

14. Unit ~ Service Factor N/A N/A N/A
15. Unit' Availability Factor N/A N/A N/A L16. Unit Capacity Factor (Using MDC) N/A N/A N/A

! 117 9 Unit'. Capacity Factor 1(Using. Design MWe) N/A N/A N/A 18.; Unit Forced Outage Rate- N/A N/A N/A

~

J19. Shutdowns' Scheduled Over Next.6 Months (Type, Date, and Duration of Each):

-Steam Generator Eddy Current, November 23, 1983 (approximately 15 days).

J20.:IfLShut Down at End of Report Period,' Estimated Date of Startup:

~

N/A

~21 1 Units in-Test Status (Prior to Commerical Operation):

FORECAST ACHIEVED Initial Criticality 10-20-82 10-22-82 Initia1' Electricity 11-17-82 11-16-82 Commercial Operation 01-01-84 r-e y-

,e- .s -u - -

.m 4

n

[

y _

lr (Dirsetor,3'ffi,ce_of~

0 Resource Management M:nthly: Operating Report

- Pcge _ 4 .-

Nov;mber :14, 1983/

'. ' ATTACHMENT III-

-UNIT SHUTDOWNS AND POWER REDUCTIONS-DOCKET NO.' 50/395 UNIT V. C. SUMMER I DATE 11/14/63

. COMPLETED BY- G. A. Loignon<

TELEPHONE (803) 345-5209 (1) METHOD OF (2)

TYPE- SHUTTING DOWN _

.F: FORCED DURATION THE. REACTOR OR -CORRECTIVE ACTIONS /

NO. -DATE S: SCHEDULED (HOURS) REASON REDUCING POWER COMMENTS

';ML 831020 F 26.1- A 2 20) Faulty wire shorted

tripping Circ. Water Pumps.

21' 831022 F- 2 9.' 6 ' A 2- 21) Leak in Turbine EHC-System.

, ev -v- -

,)_i .

' Director,-Office of Resource Management

Monthly Operating Report:

-Page 5 November'14, 1983 ATTACHMENT IV

' NARRATIVE

SUMMARY

10F OPERATING EXPERIENCE-

! Virgil C.l Summer: Nuclear Station, Unit.No. 1, continued power Joperationiduring the month.of October 1983 L0n' October 20, 1983, at'0905 hours0.0105 days <br />0.251 hours <br />0.0015 weeks <br />3.443525e-4 months <br />, the Plant was manually tripped-from approximately-90% power following the loss.of.all

-Circulating Water Pumps._ The pumps had tripped. automatically.

when'one of the flood protection level switches-was accidently.

shorted'by plant _ personnel. The-2/3. logic for flood protection s wasLcompleted bytthis short since-the' supply breaker.for the redundant switches.was incorrectly.:in the "0FF" position. The cause is attributed to' personnel error. ~ Plant performance during

the eventJwas asfexpected.with no' events of~ safety significance.

On= October.22,-1983,:atL1053 hours,-the plant'was manually L tripped from approximately 77% power. .The trip was initiated whenithe; Shift Supervisor determined that an oil leak in the EHC System piping was high enough to preclude. running the plant back in a controlled. manner. Plant response to the transient was normal

_and the source offthe= leak subsequently repaired.

~

90n October.31,-1983, operation was continuing at approximately 100%

power.

~

k

l j' , _,_

ur.

SOUTH CAROLINA ELECTRIC & GAS COMPANY post oppics 7e4 -

COLUMelA. SOUTH CAROLINA 29218 '

~O. W. DixON. JR.

Vice PossiosNT NucLEAm OrspAT:Jms November 14, 1983 LDirector,-Office.of Resource Management U. S. Nuclear _ Regulatory Commission

.MNBB 7602 Washington, DC 20555 ATTN: Mr. Learned it. Barry

SUBJECT:

Virgil C. Summer Nuclear Station Docket No. 50/395 -

Operating License No. NPF-12 Monthly Operating Report

Dear.Mr. Barry:

Please find enclosed the-October 1983 Monthly Operating' Report for.

.the Virgil C. Summer' Nuclear Station Unit No. 1 as required by Technical Specification 6.9.1.10.

If-there are-any questions, please call us at your convenience.-

Ver trul yours,_

NN O. W. ixo , r.

GAL:0WD:mac Attachment cc: V.10. Summer C. A. Price E.-C. Roberts- A. R. Koon E. H. Crews' O. L. Ligon (NSRC)

T. C. Nichols, Jr./0. W. Dixon, Jr. G. J. Braddick H. N.!Cyrus D. J. Richards H. R. Denton- NRC Res. Inspector J. P. O'Reilly- J. B. Knotts, Jr.

" Group. Managers INPO Records Center O. S. Bradham NPCF-R. B._Clary File (Lic./Eng.)

l \

- . . -