g Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 554011927 Telephone (612) 330-5500 1
April 27,1995 U S Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Missed NRC Commitment Reaardina insoection of CRDRL Nozzle Each Refuelina Outaae This letter is to inform you of a missed commitment regarding augmented in Service Inspection (ISI) on our Control Rod Drive Retum Line (CRDRL).
in a letter dated May 9,1983 from D M Musolf (NSP) to Director Office of Nuclear Reactor Regulation, titled "BWR Control Rod Drive Return Line Nozzle Cracking Post Modification Report for NUREG-0619", NSP committed to do inspections each outage on the CRDRL. Per this letter, we committed that ".... the welded connection joining the re-routed CRDRL to the Reactor Water Clean-up System will be inspected every refueling outage." During a current ongoing process of verifying all NRC commitments, it was noted that this connection had not been inspected during either the 93, or 94 i
refueling outages.
I in 1983, inspection of this connection was added to the ISI program as an augmented inspection. During refueling outages in 1984, 86,87,89, and 91, the connection was inspected as required with satisfactory results, in 1993, the third ten year ISI program was written from base document requirements and this commitment was inadvertently dropped from the program. As a result, the connection was not inspected during either the 1993 or 1994 refueling outages as required by our commitment.
1 Upon discovery of the missed commitment, the original letter was reviewed to verify the commitment was still valid, and a decision was made to perform the required inspection as soon as possible. Presently a reactor water cleanup system outage is 9soso20ss2 95o427
)
O ADOCKc5oog3 PDR Q
i
(
I scheduled for the week of May 15,1995. The required inspection will be completed l
during our next RWCU system outage.
l i
The Monticello NRR Project Manager and the Senior Resident inspector have both been notified of the situation.
A Nonconformance Report (NCR 95-068) has been issued to investigate the root cause and to propose corrective actions as necessary.
We do recognize the significance of commitments made to the NRC and intend to complete them as stated. We believe that our commitments are generally fulfilled as promised, this instance was not typical. We apologize for any inconvenience this oversight may have caused.
Please cc "act Sam Shirey (612-295-1449) if you have any questions related to our response te..le subject inspection report.
/)VfYlb h U
William J Hill Plant Manager i
Monticello Nuclear Plant c: Regional Adminictrator lil, NRC Senior Resident inspector, NRC NRR Project Manager, NRC State of Minnesota Attn.: Kris Sanda I
qqygy-
_g
J TRANSMITTAL MANIFEST NORTHERN STATES POWER COMPANY NUCLEAR LICENSING DEPARTMENT MONTICELLO NUCLEAR GENERATING PLANT Missed NRC Commitment J
Reaardina Insoection of CRDRL Nozzle Each Refuelina Outaae Correspondence Date: Apri; 27,1995 Monticello Intemal Site Distribution Special Instructions Kileen Hilsenhoff......USAR File.................Yes No_x_
i Steve Ludders..........NRC Commitment.....Yes_x_ No
.)
Lil2 Imholte............. Monti OC Sec..........Yes No_x_ - 11, No dist to OC members below if YES M:1 Opstad............... Monti SAC Sec..........Yes No_x_ - 5 j
Monticello intamal Site Distribution:
"Monti Document Control File Monti Site Lic File W J Hill, Plant MGR Steve Ray, SR Res insp, NRC Al Wojchouski Dern Carstens Monica Vik i
d NSP Intemal Distribution E L Watzl, VP Nuc Gen R O Anderson, Dir LMI, SAC Mike Wadley, Pl Communication Dept Yes No_x_
1 Extemal NSP Distribution
{ Regional Admin-lli,NRC% [858N160esk,Nfyf Kris Sanda, State of Minn J E Silberg T J Kim, NRR PM, NRC
- Advance Distribution made by Site Licensing Manifest Date: April 27,1995 J