!IARRAT1VE
SUMMARY
OF MO!T111LY OPERATIl1G EXPERIDICE UNIT 1 AUGUST 1991 August 1 The - Unit was operating at appmximtely 60% output to permit repairs l to the "A"
Main Feodwater Pump. At 0040 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> the Unit's-output was raqxxl up at 3% per hour. At 0905 hours0.0105 days <br />0.251 hours <br />0.0015 weeks <br />3.443525e-4 months <br /> after reaching _75% output, the Unit began an approximately 12%
power reduction to pennit further repairs to the "A" Main Feedwater Pump.
. August 2-The Unit operated at approximately 63% output.
August 3 At 1410 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.36505e-4 months <br /> the Unit began power ascension at 3% per hour to 90% output. The Unit achieved 90% ouput at 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />.
August 4 At 0510 hours0.0059 days <br />0.142 hours <br />8.43254e-4 weeks <br />1.94055e-4 months <br /> the Unit began power ascension to 100% output.
August 5 The Unit achie"cd a nmlnal value of 100% output at 0145 hours0.00168 days <br />0.0403 hours <br />2.397487e-4 weeks <br />5.51725e-5 months <br />.-
-August 6 The Unit operated at a' nontinal value of 100% output, through August 31 i
l l.
91091603~26 910909 PDR ADOCK 05000334 R
I AVERAGE DAILY UNIT IGER LEVEL DOCITT 110.
50-334 UNIT IWPS Unit 1 DATE _Srpt. 9, 1991 COMPILTED BY D.T. Jones TELEPilO!E __L41?l 293-7612_
Molmi Aucnist 1991 DAY AVERAGE DAILY POWER I.EVEL DAY AVERAGE DAILY IGEP IIVEL (FMe-Net)
(!Ne-!1et) 1 475 17 804 2
488 18 813 3
517 29 825 4
'J.16 20 813 5
804 21 821 6
817 22 813 7
81L 23 804 8
813 24 808 9
808 25 808 10 817 26 813 11 813 27 808 12 813 28 804 13 813 29 813 14 813 30 783 15 804 31 808 16 813 INSTRUCTIONS:
On this format, list the average daily unit power level IWe-Net for each day in the reputtirig nonth. Campute to the nearest whole megawatt.
_E t
OPERATING DATA REPORT DOCKET NO.
50-334 REPORT DATE:
09/09/91 COMFLET"D BY: D.T. JONES TELEPHONE:
(412) 393-7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: AUGUST 1991
- 3. LICENSED THERMAL POWER (MWt):
2652
- 4. NAMEPLATE RATING (Gross MWe):
923 5 DESIGN ELECTRICAL RATING (Net MWe):
835 6, MAX. DEPENDABLE CAPACITY (Gross MWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
744.0 5831.0 134423.0
- 12. NO OF HRS. REACTOR WAS CRITICAL:
744.0 3157.1 83451.5
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS CENERATOR WAS ON LINE:
744.0 3026.6 81571.6
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY GEN. (MWH):
1900996.0 7440755,0 193729202.5 17.. GROSS ELECT. ENERGY GEN. (MWH):
614040.0 2394188.0 62226917.0
-18. NET ELECTRICAL ENERGY GEN. (MWH):
578000.0 2236170.0 58100370.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 51.9 62.8 E
20,- UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 51.9 62.8
-22. UNIT CAPACITY FACTOR (DER): PCT 93.0 45.9 54.4
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 15.4 16.3
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF.STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
F0P.ECAST ACHIEVED l
ISITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A l
[
COMMERCIAL OPERATION N/A N/A l
l
1 Docket No.
50-334 UNIT SHUTDOWNS Ak0 FOWER REDUCTIONS Unit Name 9tPS Unit #1 Date Sept. 9 1991 Ccmpleted By D.
T.
Jones REPORT MONTH AUCUST 1991 Telephone (612) 393-7612 Cause & Corrective Method of Licensee Duration Shutting Event System component Action to No.
Date Typel (Hours)
Reason 2 Down Reactor 3 Report #
Code 4 Code $
Prevent Recurrence 4
25 910801 F
0 8
4 N/A CH FUMPNX Unit's cutput maintained at 60% to permit repairs to the "A" main fetdwater pump.
26 910801 S
0 N
5 N/A RC FUELXX Unit operated at reduced output for fuel preconditioning.
27 910801 F
0 8
N/A CM FUMPXX Uni t 's out put reduced f rom 75% to 60% to permit repairs to the "A" main feedwater pump.
28 910803 S
0 N
5 N/A RC FUELXM Unit operated at reduced output for fuel preconditioning.
1 4
3 1
2 Fahibit 7-!nstructions for Me t h od:
l F-Forced Reason:
Preparation of Data Entry Sheets l
S-Scheduled A-E qu i pment Failure (Emplain) 1-Manual for Licensee Event Report (LER) Fite 2-Menual Scram 8-Maintenance or Test (nUREGG161).
3-Automatic Scram C-Refueling 4-Cont'd. fron Previous Month D-Regulatory Restriction 5
E-Operator Training & Licent Esam 5-Peduction Er5ibit H-Same Source.
9-Other F-Administrative G-Ope r a t i onal Error (Esplain)
M Other (Esotain)
r t
t NARRATIVE
SUMMARY
OF
}OTIHLY OPERATDiG EXPERIDiCE UNIT 2 AUGUST 1991 i
August 1
'Ihe Unit operated at a nominal value of 100% output.
i throtgh August 10 l
August 11 At 0310 hours0.00359 days <br />0.0861 hours <br />5.125661e-4 weeks <br />1.17955e-4 months <br /> the Unit's output was reduced to 88% to load follow.
i August 12 At 0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> the Unit's output was escalated to a nominal value of 100% output.
t August 13
'Ihe Unit operated at a naminal value of 100% output.
3 through Atrjust 28 August 29 At 1353 hours0.0157 days <br />0.376 hours <br />0.00224 weeks <br />5.148165e-4 months <br /> the Unit's output was reduced to'98% to irprove conditions in the hotwell. At 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br /> the Unit's output was escalated to a naminal value of 100%.
i t
Atgust 30 At 1306 hours0.0151 days <br />0.363 hours <br />0.00216 weeks <br />4.96933e-4 months <br /> the Unit's output was reduced to 97% to irprove conditions in the hotwell. At 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> the Unit's output was escalated to a nominal value of 100%.
August 31
'Ihe. Unit operated at a naminal value of 100% output, t
i
+
t I
+
6 iP r
t
AVERAGE 1RILY UtTIT FWER LEVEL DOChTT NO. -
50-412 UNIT-INFS Unit 2 DATE Sept. 9, 1991 CQ4PLETED BY D.T. Jones TELEFilONE (412) 393-7612 14]tTDI Auctust 1991 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (M4e-Net)
(Mie-Net) 1-798 17 797 2
785 18 800 3
788 19 803 4
802 20 807 5
800 21 807 6
802 22 802 7-798-23 800 8
802 24 801 e
9 801 25 798 10-802
-26 799 11 724 27 800 12
-775 28 797 13 802 29 789 14 800 30 788
~15 801 31 798 16 803 INSTIUCTIONS:
this format, list the average daily unit power level M9e-Net for each day in On the reputting month. Ocx:ps '.e to the nearest whole megawatt.
1.
I OPERATING DATA REPORT DOCKET N3.
50-412 REPORT 9 ATE:
09/09/91 COMPLETED BY: M.A. WINGER TELEP110NE:
(412) 393-7621 OPERATING STATb1
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: AUGUST 1991
- 3. LICENSED THERMAL POWER (MWt)-
'652
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
8/0
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
820
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, CIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MVe);
None 10, REASONS FOR RESTRICTIONS, IF ANY:
N/A TilIS MONTH YEAR TO DATE CUMULATIVE
- 11. Il0URS IN REPORTING PERIOD:
744.0 5831.0 33206.0
- 12. NO. OF llRS. REACTOR WAS CRITICAL:
744.0 5831.0 28178.3
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. 510URS GENERATOR WAS ON LINE:
744.0 5831.0 27992.8
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0,0
- 16. GROSS THERMAL ENERGY GEN. (MWil) :
1954146.0 15178235.0 68305851.4
- 17. GROSS ELECT, ENERGY GEN. (HWH):
625400,0 4861952.0 21898752.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
592872.0 4609703.0 20653027.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 84.3
- 20. UNIT AVATLABILITY FACTOR:(PERCENT) 100.0 100.0 84.3
- 21. UNIT CAPA::ITY FACTOR (MDC): PCT 97.2 96.4 75.0 22, UNIT CAPACITY FACTOR (DER): PCT 95.3 94.6 74.4
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 4.2
- 24. SHUTDOWNS SCllEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND JURATION OF EACll):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST AcilIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l
Docket ho.
50-4T2 Uuti SHUTDOWNS AkD FDVER REDUCTIONS Unit Nare BVPS Unst e2 Date Sept.
7.
1991 Completed By D.
T.
Jcxs REPORT MONTH $UGUST 1991 Telephone (412) 393-7612' Cause & Corrective 4
Methed of ticensee Duration Shutting Event System Component Action to No.
Date Typel (Hours)
Reason 2 Down Reactor 3 Report 8 Code 4 Code 5 Prevent Recurrence 9
910811 S
0 N
5 w/A 22 ZZZZZZ unit's output reduced frem 100% to 88% to load f ot tew.
[
1
)
i 4
3 1
2 Eshibit F-!nstructicns for Method:
T-forced Reason:
Preparation of Data Entry Sneers S-Scheduled A-Equipment f ailure (Esplain) 1-Manual for Licensee Event Report (LER) File 2-Manual Scrae B-Msintenance or Test (huREG0161).
3-Automatic Scram C-#efueling 4-Cont'd. f rom Previous Month D-Regulatory Restriction 5
5-Reduction E-Operator Training & Ltcense Exam EPhibit 4-Same Source.
9-Other F-Administrative G-Operational E rror (Euptein)
H-Other (Esotain) l I
,,..._...w