MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 L-98-096, Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 2 L-98-068, Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 2 L-98-036, Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station1998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station ML20202F8191998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Beaver Valley Power Station,Units 1 & 2 ML20198L3981997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-072, Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 2 L-97-057, Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-040, Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 2 ML20216H6031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Beaver Valley Power Station ML20210K5821997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Bvps,Units 1 & 2 ML20140D7261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for BVPS ML20141B3501997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Beaver Valley Power Station,Units 1 & 2 ML20137T1441997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Beaver Valley Power Station Units 1 & 2 ML20136G4651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Beaver Valley Power Station,Unit 1 & 2 ML20134K1521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Beaver Valley Power Station,Units 1 & 2 ML20133F4831996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Beaver Valley Power Station Unit 1 & 2 ML20132B1001996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Beaver Valley Power Station Unit 1 & 2 ML20134H4921996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Beaver Valley Power Station,Units 1 & 2 ML20128N1911996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Beaver Valley Power Station Unit 1 & 2 ML20117M2091996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Beaver Valley Power Station Units 1 & 2 ML20117B2481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Beaver Valley Power Station ML20115D4061996-06-30030 June 1996 Monthly Operating Repts for June 1996 for BVPS ML20117M1791996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Beaver Valley Power Station,Units 1 & 2 ML20111B2441996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Beaver Valley Power Station ML20101R0621996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Beaver Valley Power Station ML20100R2841996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Beaver Valley Power Station ML20097D4541996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Beaver Valley Power Station ML20096B2531995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Beaver Valley Power Station ML20095D8651995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Beaver Valley Power Station ML20094H3631995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Beaver Valley Power Station ML20092F4251995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Beaver Valley Power Station ML20087F1331995-07-31031 July 1995 Monthly Operating Repts for Jul 1995 for Beaver Valley Power Station ML20086G1601995-06-30030 June 1995 Monthly Operating Repts for June 1995 for Beaver Valley Power Station Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With1999-09-0202 September 1999 LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with ML20209D9531999-06-27027 June 1999 Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999 Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With ML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite1999-04-0505 April 1999 Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with ML20196K7981999-03-25025 March 1999 Rev 4 to COLR, for Cycle 8 L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced1999-02-0505 February 1999 Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced ML20196F7011999-01-31031 January 1999 BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20210G7041999-01-22022 January 1999 BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 ML20207E5861998-12-31031 December 1998 Annual Rept 1998 for Toledo Edison ML20207E5601998-12-31031 December 1998 Annual Rept 1998 for Pennpower ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20207E5901998-12-31031 December 1998 Dqe 1998 Annual Rept to Shareholders ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with ML20207E5521998-12-31031 December 1998 Annual Rept 1998 for Ohio Edison ML20207E5761998-12-31031 December 1998 Annual Rept 1998 for Illuminating Co ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with ML20206G0291998-10-31031 October 1998 BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20198F7611998-10-0606 October 1998 Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure1998-09-21021 September 1998 Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product1998-07-29029 July 1998 Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 1999-09-30
[Table view] |
Text
, . . -..
!IARRAT1VE
SUMMARY
OF MO!T111LY OPERATIl1G EXPERIDICE UNIT 1 AUGUST 1991 August 1 The - Unit was operating at appmximtely 60% output to permit repairs l to the "A" Main Feodwater Pump. At 0040 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> the Unit's- output was raqxxl up at 3% per hour. At 0905 hours0.0105 days <br />0.251 hours <br />0.0015 weeks <br />3.443525e-4 months <br /> after reaching _75% output, the Unit began an approximately 12%
power reduction to pennit further repairs to the "A" Main Feedwater Pump.
. August 2- The Unit operated at approximately 63% output.
August 3 At 1410 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.36505e-4 months <br /> the Unit began power ascension at 3% per hour to 90% output. The Unit achieved 90% ouput at 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />.
August 4 At 0510 hours0.0059 days <br />0.142 hours <br />8.43254e-4 weeks <br />1.94055e-4 months <br /> the Unit began power ascension to 100% output.
August 5 The Unit achie"cd a nmlnal value of 100% output at 0145 hours0.00168 days <br />0.0403 hours <br />2.397487e-4 weeks <br />5.51725e-5 months <br />.-
-August 6 The Unit operated at a' nontinal value of 100% output, through August 31 i
l l.
91091603~26 910909 PDR ADOCK 05000334 R PDR
I AVERAGE DAILY UNIT IGER LEVEL DOCITT 110. 50-334 UNIT IWPS Unit 1 DATE _Srpt. 9, 1991 COMPILTED BY D.T. Jones TELEPilO!E __L41?l 293-7612_
Molmi Aucnist 1991 DAY AVERAGE DAILY POWER I.EVEL DAY AVERAGE DAILY IGEP IIVEL (FMe-Net) (!Ne-!1et) 1 475 17 804 2 488 18 813 3 517 29 825 4 'J.16 20 813 5 804 21 821 6 817 22 813 7 81L _ _ _
23 804 8 813 24 808 9 808 25 808 10 817 26 813 11 813 27 808 12 813 28 804 13 813 29 813 14 813 30 783 15 804 31 808 16 813 INSTRUCTIONS:
On this format, list the average daily unit power level IWe-Net for each day in the reputtirig nonth. Campute to the nearest whole megawatt.
_E t
OPERATING DATA REPORT DOCKET NO. 50-334 REPORT DATE: 09/09/91 COMFLET"D BY: D.T. JONES TELEPHONE: (412) 393-7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: AUGUST 1991
- 3. LICENSED THERMAL POWER (MWt): 2652
- 4. NAMEPLATE RATING (Gross MWe): 923 5 DESIGN ELECTRICAL RATING (Net MWe): 835 6, MAX. DEPENDABLE CAPACITY (Gross MWe): 860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS: ,
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A _,_,
THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 744.0 5831.0 134423.0
- 12. NO OF HRS. REACTOR WAS CRITICAL: 744.0 3157.1 83451.5 '
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 4482.8
- 14. HOURS CENERATOR WAS ON LINE: 744.0 3026.6 81571.6 ;
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY GEN. (MWH): 1900996.0 7440755,0 193729202.5 17.. GROSS ELECT. ENERGY GEN. (MWH): 614040.0 2394188.0 62226917.0
, -18. NET ELECTRICAL ENERGY GEN. (MWH): 578000.0 2236170.0 58100370.0 E
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 51.9 62.8 20,- UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 51.9 62.8
- 21. UNIT CAPACIIY FACTOR (MDC): PCT 95.9 47.3 56.1
-22. UNIT CAPACITY FACTOR (DER): PCT 93.0 45.9 54.4
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 15.4 16.3
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF.STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
F0P.ECAST ACHIEVED l ISITIAL CRITICALITY N/A N/A
! INITIAL ELECTRICITY N/A N/A l COMMERCIAL OPERATION N/A N/A -
[
l l
- 1 Docket No. 50-334 UNIT SHUTDOWNS Ak0 FOWER REDUCTIONS Unit Name 9tPS Unit #1 Date Sept. 9 1991 Ccmpleted By D. T. Jones Telephone (612) 393-7612 REPORT MONTH AUCUST 1991 Licensee Cause & Corrective Method of Action to Shutting Event System component Duration Code 4 Code $ Prevent Recurrence (Hours) Reason 2 Down Reactor 3 Report #
No. Date Typel 4 4 N/A CH FUMPNX Unit's cutput maintained at 60% to 8
25 910801 F 0 permit repairs to the "A" main fetdwater pump.
5 N/A RC FUELXX Unit operated at reduced output for 26 910801 S 0 N fuel preconditioning.
N/A CM FUMPXX Uni t 's out put reduced f rom 75% to 0 8 $
27 910801 F 60% to permit repairs to the "A" main feedwater pump.
5 N/A RC FUELXM Unit operated at reduced output for 28 910803 S 0 N fuel preconditioning.
1 4
3 1 2 Me t h od: Fahibit 7-!nstructions for l F-Forced Reason:
1-Manual Preparation of Data Entry Sheets S-Scheduled A- E qu i pment Failure (Emplain) for Licensee Event Report (LER) Fite l
8-Maintenance or Test 2-Menual Scram 3-Automatic Scram (nUREGG161).
C-Refueling D-Regulatory Restriction 4-Cont'd. fron Previous Month 5-Peduction 5 E-Operator Training & Licent Esam Er5ibit H-Same Source.
F-Administrative 9-Other G-Ope r a t i onal Error (Esplain)
M Other (Esotain)
r
.. .. t t
NARRATIVE
SUMMARY
OF -
}OTIHLY OPERATDiG EXPERIDiCE UNIT 2 !
AUGUST 1991 i
August 1 'Ihe Unit operated at a nominal value of 100% output. i throtgh ,
August 10 l August 11 At 0310 hours0.00359 days <br />0.0861 hours <br />5.125661e-4 weeks <br />1.17955e-4 months <br /> the Unit's output was reduced to 88% to load ,
follow. i August 12 At 0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> the Unit's output was escalated to a nominal value of 100% output. t August 13 'Ihe Unit operated at a naminal value of 100% output. 3 through Atrjust 28 -
August 29 At 1353 hours0.0157 days <br />0.376 hours <br />0.00224 weeks <br />5.148165e-4 months <br /> the Unit's output was reduced to'98% to irprove conditions in the hotwell. At 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br /> the Unit's output was t
escalated to a naminal value of 100%. i Atgust 30 At 1306 hours0.0151 days <br />0.363 hours <br />0.00216 weeks <br />4.96933e-4 months <br /> the Unit's output was reduced to 97% to irprove conditions in the hotwell. At 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> the Unit's output was escalated to a nominal value of 100%. _
August 31 'Ihe. Unit operated at a naminal value of 100% output, t
i +
t I
+
6 iP r
t
AVERAGE 1RILY UtTIT FWER LEVEL DOChTT NO. - 50-412 UNIT- INFS Unit 2 DATE Sept. 9, 1991 CQ4PLETED BY D.T. Jones TELEFilONE (412) 393-7612 14]tTDI Auctust 1991 __
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (M4e-Net) (Mie-Net) 1- 798 17 797 _
2 785 18 800 3 788 19 803 4 802 20 807 5 800 21 807 6 802 22 802 7- 798- 23 800 8 802 24 801 e
9 801 25 798 10- 802 -26 799 11 724 27 800 12 -775 28 797 13 802 29 789 14 800 30 788
~15 801 31 798 16 803 INSTIUCTIONS:
On this format, list the average daily unit power level M9e-Net for each day in the reputting month. Ocx:ps '.e to the nearest whole megawatt.
1.
I OPERATING DATA REPORT DOCKET N3. 50-412 REPORT 9 ATE: 09/09/91 COMPLETED BY: M.A. WINGER TELEP110NE: (412) 393-7621 OPERATING STATb1
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: AUGUST 1991
- 3. LICENSED THERMAL POWER (MWt)- '652
- 4. NAMEPLATE RATING (Gross MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net MWe): 836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 8/0
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 820
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, CIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MVe); None 10, REASONS FOR RESTRICTIONS, IF ANY: N/A TilIS MONTH YEAR TO DATE CUMULATIVE
- 11. Il0URS IN REPORTING PERIOD: 744.0 5831.0 33206.0
- 12. NO. OF llRS. REACTOR WAS CRITICAL: 744.0 5831.0 28178.3
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. 510URS GENERATOR WAS ON LINE: 744.0 5831.0 27992.8
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0,0
- 16. GROSS THERMAL ENERGY GEN. (MWil) : 1954146.0 15178235.0 68305851.4
- 17. GROSS ELECT, ENERGY GEN. (HWH): 625400,0 4861952.0 21898752.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH): 592872.0 4609703.0 20653027.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 84.3
- 20. UNIT AVATLABILITY FACTOR:(PERCENT) 100.0 100.0 84.3
- 21. UNIT CAPA::ITY FACTOR (MDC): PCT 97.2 96.4 75.0 22, UNIT CAPACITY FACTOR (DER): PCT 95.3 94.6 74.4
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 4.2
- 24. SHUTDOWNS SCllEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND JURATION OF EACll):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST AcilIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l
Docket ho. 50-4T2 Uuti SHUTDOWNS AkD FDVER REDUCTIONS Unit Nare BVPS Unst e2 .
Date Sept. 7. 1991 Completed By D. T. Jcxs Telephone (412) 393-7612' REPORT MONTH $UGUST 1991 4
Methed of ticensee Cause & Corrective System Component Action to Duration Shutting Event Report 8 Code 4 Code 5 Prevent Recurrence No. Date Typel (Hours) Reason 2 Down Reactor 3 22 ZZZZZZ unit's output reduced frem 100% to 0 N 5 w/A 9 910811 S
[
88% to load f ot tew.
1
)
i 4
3 1 2 Method: Eshibit F-!nstructicns for T-forced Reason:
1-Manual Preparation of Data Entry Sneers S-Scheduled A-Equipment f ailure (Esplain) for Licensee Event Report (LER) File B-Msintenance or Test 2-Manual Scrae 3-Automatic Scram (huREG0161).
C-#efueling D-Regulatory Restriction 4-Cont'd. f rom Previous Month 5-Reduction 5 E-Operator Training & Ltcense Exam EPhibit 4-Same Source.
9-Other F-Administrative G-Operational E rror (Euptein)
H-Other (Esotain) l I