Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20209G0661999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20205N0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20207M6421999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20203A2651999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20199E6591998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20198B2561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20195C9681998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20154H6001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20236M5981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20248M3121998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20247F3631998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20216D5941998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20216D9811998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20202G4211998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20198L6191997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20203F6391997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20198T4151997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Jm Farley Nuclear Plant ML20211N7221997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20216J3151997-08-31031 August 1997 Monthly Operating Repts for August 1997 for Jfnp ML20210K5981997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20141H3191997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Joseph M Farley Nuclear Plant Units 1 & 2 ML20148K6081997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Joseph M Farley Nuclear Plant ML20141E3121997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20137T1841997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20136G4731997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Jm Farley Plant Units 1 & 2 ML20138K5881997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20133F4791996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20132C0631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20134K7141996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20128Q1161996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Jm Farley Nuclear Plant,Units 1 & 2 ML20117M1291996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20116J6421996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20115D6821996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20117M2721996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20111D1401996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Jm Farley Plant Units 1 & 2 ML20101R6271996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Jm Farley Nuclear Plant ML20106H0791996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Jm Farley Nuclear Plant ML20097D5651996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Jm Farley Nuclear Plant ML20096C0921995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Jm Farley Nuclear Plant Units 1 & 2 ML20095E9451995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Joseph M Farley Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217P0761999-10-0606 October 1999 Non-proprietary, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20210T2161999-08-0606 August 1999 Draft SE Supporting Proposed Conversion of Current TS to ITS for Plant ML20211B2011999-08-0404 August 1999 Informs Commission About Results of NRC Staff Review of Kaowool Fire Barriers at Farley Nuclear Plant,Units 1 & 2 & Staff Plans to Address Technical Issues with Kaowool & FP-60 Barriers ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20196J3791999-06-30030 June 1999 Safety Evaluation of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs. Rept Acceptable ML20209G0661999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with ML20206G7471999-05-0404 May 1999 Safety Evaluation Accepting Corrective Actions Taken by SNC to Ensure That Valves Perform Intended Safety Functions & Concluding That SNC Adequately Addressed Requested Actions in GL 95-07 L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C9461999-04-30030 April 1999 1:Final Cycle 16 Freespan ODSCC Operational Assessment L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20205N0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20204D7271999-03-15015 March 1999 ISI Refueling 15,Interval 2,Period 3,Outage 3 for Jm Farley Nuclear Generating Plant,Unit 1 ML20207M6421999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20203A2651999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20199D8611999-01-12012 January 1999 SER Accepting Relief Request for Inservice Insp Program for Plant,Units 1 & 2 ML20199E6591998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C8081998-12-31031 December 1998 Alabama Power 1998 Annual Rept ML20198K4091998-12-18018 December 1998 COLR for Jm Farley,Unit 1 Cycle 16 ML20198B2561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20195E2281998-11-16016 November 1998 Safety Evaluation Authorizing Relief Request for Second 10-year ISI Program Relief Request 56 for Plant,Unit 1 ML20195C9681998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20155E0271998-10-29029 October 1998 SER Approving & Denying in Part Inservice Testing Program Relief Requests for Plant.Relief Requests Q1P16-RR-V-3 & Q2P16-RR-V Denied Since Requests Do Not Meet Size Requirement of GL 89-04 ML20154B6121998-10-0101 October 1998 Safety Evaluation Granting Second 10-year ISI Requests for Relief RR-13 & RR-49 Through RR-55 for Jm Farley NPP Unit 1 ML20151V8341998-09-30030 September 1998 Non-proprietary Rev 2 to NSA-SSO-96-525, Jm Farley Nuclear Plant Safety Analysis IR Neutron Flux Reactor Trip Setpoint Change ML20154H6001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20154H0121998-09-30030 September 1998 Submittal-Only Screening Review of Farley Nuclear Plant IPEEE (Seismic Portion) ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237C5471998-08-20020 August 1998 Suppl to SE Re Amends 137 & 129 to Licenses NPF-2 & NPF-8, Respectively.Se Being Supplemented to Incorporate Clarifications/Changes & Revise Commitment for Insp of SG U-bends in Rows 1 & 2 for Unit 2 Only ML20236Y1121998-07-31031 July 1998 Voltage-Based Repair Criteria 90-Day Rept ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20237A2181998-07-24024 July 1998 Jm Farley Unit 2 ISI Rept Interval 2,Period 3 Outage 1, Refueling Outage 12 ML20236U6141998-07-23023 July 1998 Safety Evaluation Authorizing Use of Alternative Alloy 690 Welds (Inco 52 & 152) as Substitute for Other Weld Metal ML20236R8671998-07-0909 July 1998 Safety Evaluation Concluding That Southern Nuclear Operating Co USI A-46 Implementation Program Has Met Purpose & Intent of Criteria in GIP-2 & Staff SSER-2 on GIP-2 for Resolution of USI A-46 ML20236M5981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20154H0461998-06-30030 June 1998 Technical Evaluation Rept on Review of Farley Nuclear Plant IPEEE Submittal on High Winds,Flood & Other External Events (Hfo) ML20248M3121998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20247F3631998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20217D2591998-04-21021 April 1998 Safety Evaluation Accepting Licensee Proposed Alternative Re Augmented Exam of Reactor Vessel Shell Welds for Plant ML20247E8851998-03-31031 March 1998 FNP Unit 2 Cycle 13 Colr ML20217H3191998-03-31031 March 1998 Safety Evaluation Accepting Proposed Changes to Plant Matl Surveillance Programs ML20216D5941998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20217D4081998-03-24024 March 1998 Safety Evaluation Accepting Proposed Changes to Maintain Calibration Info Required by ANSI N45.2.4-1972 ML20216H6731998-03-17017 March 1998 SER Accepting Quality Assurance Program Description Change for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20216J6851998-03-16016 March 1998 Revised Pages 58 & 59 to Fnp,Units 1 & 2,Power Uprate Project BOP Licensing Rept ML20216D9811998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Jm Farley Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
._. _ _ _ _ ._ ---_
.- A:ainrna Pbwe Canpany
=
,. 40 in<enew Cewer Psww
, , Post ONe Bax !?95 D-rrtwgham A'atama 3W1
, Teteptun:' 205 868 $00t, n
J. D, Woodard /\l[lfX]llK} POWCf Vcc Prenntens-N x;tox F m Prova septaber 12, 1991 I'e m""'"w!w'
- Docket No. 50-348 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Joseph M. Farley Nuclear Plant Unit 1 Monthly Ooeratina Data Report Attached is the August 1991 Monthly Operating Recort for Joseph M. Farley Nuclear Plant Unit 1, as required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted,
.h r \~
(J.x
. Woodard AEJ:edb3014 Attachments cc: Mr. S. D. Ebneter Mr. S. T. Hoffman Mr. G. F. Maxwell l
l 1
9109160302 910931
! R PDR
//
4 g ,
.~ .--
-JOSEPil-M. FARLEY NUCLEAR PLANT
. J . UNIT 1-NARRATIVE SUP91ARY OF OPERATIONS August 1991
?There-were two _ reactor _ trips and one major power reduction during the month of
- August.-
At 0001 on August 2, the reactor tripped due to personnel error. A systems operator opened the breaker supplying power to the 120. volt regulated panel IE, which provides power to the IC reactor coolant pump (RCP) breaker position contact.- Loss of power to the breaker position contact caused the solid state protection t stem to generate-an RCP breaker reactor trip. .The IC RCP breaker did not ac, 211y open. ;
\
L The 3ersonnel involved have been counseled. Also, this event will be included !
L in tie next. cycle of licensed and nonlicensed operator retraining. A caution j
label which reads, " Opening this breaker may cause a reactor trip.", has been
- placed on the four associated breakers in' Unit I and Unit 2. The unit returned .
to power operation at 0815 on 8-03-91.
5
-At 1720 on August 19, a. lightning induced trip of the IB star _t-up transformer caused the loss of-18 and ~1C RCPs. The loss of RCPs at 100 percent power e caused the reactor to trip. The 1B start-up transformer has been inspected and !
tested. A_ damaged lightning-arrestor on phase 2 was discovered and replaced. l In addition, an engineering study is being conducted to attempt to prevent i
.further lightning induced trips at FNP.. The unit returned to power operation i at 0921 on 8-21-91.
A major power reduction. occurred on 8-5-91 when a broken condenser line from ;
number four-. turbine' gland _ caused a loss of vacuum, requiring a reduction in -j
- ; power.to 68 percent. The line was subsequently plugged, and the_ unit returned :
to 100 percent power on 8-5-91'.
The following major safety-related maintenance was performed during the month: j j, 1) .There was a .1-2A diesel generator outage for quarterly preventive maintenance tasks and various other maintenance. ;
- 2) A new thrust bearing was~ installed in the turbine driven auxiliary feedwater pump (TDAFWP)-after the thrust bearing-temperature went out !
of. specification high during the _ quarterly Surveillance Test. Procedure :
(FNP-0-STP-22.16). -The TDAFWP was declared inoperable on 8-22-91 at-l 0513 and returned to service on 8-23-91 at 0510. i o .
.3) ' Miscellaneous corrective and preventive maintenance was performed on !
the diesel generators.
_3,
-i a.
File:mm/licens/ arc-mont !
j
. OPERATING DATA REPORT DOCKET NO. 50-348 DATE September 5, IMT COMPLETED BY D. N. Herey TELEPil0NE (205)899-3156 OPERATING STATUS i Notes
.1. Unit Namet Joseph H. Parley - Unit 1 1) Cumulative data since
, 2. Reporting Periods. August 1991 12-1-77, date of
- 3. Licensed Thermal-Power (HVt): 2,652 commercial opetation.
- 4. Nameplate Rating (Gross MVe): 860
- 5. Design Electrical Rating (Net HVe): 829
- 6. Maximum Dependable Capacity (Gross MVe): 856.4
- 7. Haximum Dependable Capacity (Net Hve): 814.0
- 8. If Changes Occur in Capecity P.atings (ltems Number 3 Through 7) Since Last Report,
- Give Reasons
- N/A f
- 9. Power Level To Vhich Restricted, IF Any (Net HVe): N/A
- 10. Reasons For Restrictions, If Any N/A This Month Yr-to-Date Cumulative 2
- 11. Hours In Reporting Period 744 5831 120,527
- 12. Number Of Hours Reactor Vas Critical 690.7 ~ 4043.5 92,997.8
, '13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
-14. Hours Generator On-Line 671.8 3968.5 91,360.2 4' 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Cross Thermal Energy Generated (HVH) 1,725,229 10,129,439 233,763,420
- 17. Gross Electrical Energy Generated (HVH) 55^,762 ._3,258,130 75,308,468
- 18. Net-Electrical Energy Generated (HVH) 519,150 3,061,488 71,065,020
- 19. Unit Service Factor 90.3 68.1 75.U~
-20. Unit-Availability Factor 90.3 68.1 75.8
- 21. Unit-Capacity Factor (Using HDC Net) 85.7 64.5 78.7
- 22. Unit Capacity Factor (Using DER Net) 84.2 63.3 71.1
- 23. Unit Forced Outage Rate 9.7 3.3 7.3
- 24. Shutdowns Scheduled Over Next 6 Honths (Type, Date, and Duration of Each):
N/A
. 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
?6. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 Form 2/34 L ,
5 j
k
+.
DOCKET No. 50-348 UNIT 1 ;
DATE September 5, 1991 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 MONTH August DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POVER LEVEL (MVe-Net) (HVe-Net) l' 807 17 -606
-2 0 18 803 >
3 309 19 578 l 4- 803 20 0 5 709 21 140 6 805 22 611
- 7. 805 23 810 '
8 805- 24 810 9 805 25 806 .
10 804 26 807 11- 807' 27 805 i
12 806 -28 806 i
13 807 29 804 >
-_14 808 30 804 15 811 31 807 5 L -16 809- . .!
r INSTRUCTIONS ,'
1 1
- his format, list the average daily unit power level in HVe-Net for each day in un reporting month. Compute to the nearest whole megavatt. ,
e
DOCRET 30.53-348 UNIT SUITIl OWNS JCD POWE2 REDUCTIONS UNIT ENTE J. L FARLET - t(NIT 1 DATE Se,te.ne, s,in! -
COMPLETED BY D. N. MORET REPORT MONTH AUGUST TEI2 PHONE (2056099-5156 l CAOSE & CORRECTIVE l l l l l l l METHOD OF l LICENSEE l l l ACTION TO l l l DURATION l l SHUTTING l EVENT l SYSTEM l COMPONENT l l FRE7ENT RECURRENCE l l REPORT S l CODE
- l CODE l lNO. l DATE l TTPE l (HOURS) l REASON l DOWN REACTOR' 32.23 G 3 l 91-00s l JG l site lA systems operater opened a breaker supplying power l l 9108*2 F l l l l007 l lto 120 volt regulated panel IE, which provides l l l l l l l l l l l l l l power to the 1C reactor coolant pump (RCP) breaker l l l l l l l l l position contact. Loss of power to the breaker l l l l l l l l l
l l l l position contact caused solid state protection to l l l l l l l l l l l generate an RCP breaker reactor trip. The 1C RCP l l l l l l l l l breaker did not actually open. l l l l l l l l l I I I I I I 1 1 I I I Also, l l l l lThe perscanet involved have been counseled.
l l l l l l
l l l l lthis event will be included in the next cycle of l l l l l l l l l l licensed and nonlicensed operator retraining. l l l l l l l I I I I I I I l 1 1 I l l l lA caution label which reads, " Opening this breaker l l l l l l l
l l lmay cause a reactor trip *, has been placed on the l l l l l l l l lfour associated breakers in Unit 1 and Unit 2. l l l l l l l l l i
! I I I l i l 1 I I I I I I I I i l I I I i l i I I i i i 1 i I
I i l i I I I I I I l i i l l I I i l i i l I I I I I I I l i I I i
i I I i i l I I i i I I I I I I i l l I I i 1
! I I I I i i I i 1
Method: Exhibit G-Instructions F: Forced Reason:
1-Manual for Preparation of Data 5: Scheduled A-Equipment Failure (Explain) 2-Manual Scram. Entry Sheets for Licensee B-Maintenance or Test 3-Automatic Scram. Event Report (1.ER) File (NUREG-C-Refueling 4-Other (Explain) 0161)
D-Regulatory Restriction E-operator Training & License Examination Exhibit I -Same 3ource F-Administrative l G-operational Error (Explain)
H-Other (Emplain)
Page 1 i
b$ M
UNIT SHUTDOWNS AND POWER CEDUCTIONS DOCEET NO. 50-348 UNIT NAME J. M. FARLEY - WNIT 1 DATE September 5, 19D1 COMPLETED RY D. N. MORET s REPORT MONTN AUGUST TELEFRONE (2051899-51$6 _
l2.ICENSEE l l l CAUSE 6 CORRECTITE l l l l l l l METHOD OF ACTION TO l l l l l DURATION j l SHUTTING l EVENT l SYSTEM l COMPOWENT l l REPORT 5 l CODE
- l CODE l PREVENT RECURRENCE l lNO. l DATE l YYPE l (HOURS) l REASON l DOWN REACTOR F l 40.02 H 3 l 91-009 l EA l 2FMR lA lightning induced trip of the 18 start-up l l 008 l 910819 l l l l l l transformer caesed the loss of 18 6 1C Reactor l l l l l l l l l l l l Coolant Pumps (RCPs). The loss of RCPs at 100 l l l l l l l l l l l l percent power caused the reactor to trip. l l l l l l I I l 1 1 I I I I I I l l l l l lThe 15 start-up transformer has been inspected and l l l l l l l l l l l tested. A damaged lightning arrsstor on phase 2 l I l l l l l l l l l lvas discovered and replaced. An engineering study l l l l l l l l l l l lis being conducted to attempt to prevent further l l l l l l l l l l l1ightning induced trips at FNP. l l l l I I I l l l l l 1 1 l
F 7.22 A W/A l N/A l SH l COND lA broken condenser return line from number four l l 009 l 910805 l l l l l l l l l l turbine gland caused a loss of vacuum, requiring a l l l l l l l l l l l reduction in power to 68%. The line was l l l l l l l l l l l l subsequently p1 ragged; and the unit returned to l l l l I I i 1100s. I l 1 I I I I I l i I I I I I I I I I I I I I i I I I I I I I l i I 1 1 I I I I I I I I I I I I i 1 1 1 I I I I I I I l l l Reason: Method: Eahibit G-Instructions F: Forced A-Equipment Failure (Emplain) 1-Manual for Preparation of Data l S: Scheduled B-Maintenance or Test 2-Manual Scram. Ent ry Sheets for Licensee l
C-Refueling 3-Automatic Scram. Event Report (LER) File (RUREG-l D-Regulatory Restriction 4-Other (Esplain) 0161)
E-Operator Training & License Examination F-Administrative Exhibit I -Same Source G-Operational Error (Explain)
(9/77) H4ther (Explain)
Page 2 M Ebon M
. . ..