Text
_ _ _ _ _ _ _ _ _ _ - - _
,glVA
'Af M
T.i.pnon. (4 2) ass-sooo N."o*.'*eYf "
Shi.n.ningport, PA 15077-0004 December 7,1983 rector of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Division of Licensing Attn:
D. G. Eisenhut, Director Washington, DC 20555
Reference:
Beaver Valley Power Station, Unit No. I Docket No. 50-334, License No. DPR-66 Generic Letter 83-37 Response Gentlemen:
We have reviewed Generic Letter 83-37 and have determined that the following revisions to the Beaver Valley Power Station, Unit No.1 Technical Specifications are applicable:
1)
Revise Specification 3.3.3.7, Chlorine Detection Systems, to require two operable detectors.
2)
Revise Table 3.3-11 and 4.3-7, Accident Monitoring Instrumentation, to include the following instruments:
a)
Containment Wide Range Pressure b)
Containment Wide Range Water Level 3)
Incorporate a new Administrative Controls Section 6.8.4, to require a Post-accident Sampling Program be established, implemented and maintained.
4)
Revise Specification 3.6.4.1, Hydrogen Analyzers, for applicability to the wide range instruments.
We will forward the above changes in a request for Technical Speci-fication change following OSC and ORC review.
The generic letter also recommends that we submit a request for Technical Specification change to incorporate the Reactor Coolant Gaseous Vent System (RCGVS) Specification within 30 days.
We requested (letter dated August 25, 1983) and we understand that the NRC is presently in the process of granting an eighteen month schedular exemption to allow 8312130305 831207 PDR ADOCK 05000334 P
PDR l 0
s:
Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Generic Letter 83-37 Response.
Page Two an extension of the previous deadline for operability of the RCGVS.
Since the RCGVS will not be required until the end of the eighteen month exemption period we will delay submittal of the proposed Technical Specification change until operation of the system has been evaluated and corrected. This is currently scheduled for com-pletion ~during the fourth refueling outage.
Very truly yours, J.
arey Vice President, Nuclear cc:
W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077-U. S. Nuclear Regulatory Commission
.C/0 Document Management Branch Washington, DC 20555 Director, Safety Evaluation and Control Virginia Electric and Power Co.
P. O. Box 26666 One James River Plaza Richmond, VA 23261
_____________.______________J