RO 83-29:drawing Reviews Identified Components Requiring Corrective Measures to Prevent Operation in Manner Less than Assumed in Accident Analysis.Tubing Installation Between Pressure Transmitter Seismically Unqualified
ML20082R692
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/28/1983
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To: Murely T, Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
MP-5555, RO-83-29, NUDOCS 8312130265
Download: ML20082R692 (1)


Text

General Offices

. ca c,,cu m:r o.a. ca P.o. BOX 270 r

msw w. macs.use,,s etactaic co HARTFORD CONNECTICUT 06141-0270 x.o a..... no*= co****

(203) 666-6911

,, o,

.. a co-esOpT*(48,8sLACLEma tednQv CO.PAssw November 28, 1983 Dr. Thmas E. Murley MP-5555 Regional Mministrator, Pegion I U. S. Nuclear Regulatory Catmission 631 Park Avenue King of Prussia, Pennsylvania 19406

Reference:

Facility Operating License Ib. DPR-65 Docket No. 50-336 Reportable Occu.Trence RO-50-336/83-29

Dear Dr. Murley:

This letter provides notification of Reportable Occurrence 83-29 pursuant to the requirements of Millstone Unit 2 Appendix A Technical Specifications, Section 6.9.1.8.1.

This report concerns the discovery, during drawing reviews, of the performance of cmponents that require corrective measures to prevent operation in a manner less conservative than assumed in the accident analysis in the Safety Analysis Report or Technical Specifications bases.

While performing as-built drawing verifications on the drawings for the containment wide range pressure installation, it was found,that the tubing installed between the pressure transmitters and their system connection points did not have sufficient supports.

Credit for a wide range containment pressure indication system that was fully seismically qualified should not have been taken since the added tubing may not have been sufficiently supported. The transmitters themselves were properly supported.

Since the new tubing installation did net meet the required generic seismic support guidelines it created the potential for failure, during a seismic event, of the two wide range containnent pressure indication systems and the two safety related narrow range containment pressure transmitters which share camon sensing lines with the new wide range transmitters. An analysis of the specific installation is being performed to determine if the lines would have failed during a seismic event. Further information will be provided in the 14 day report.

Very truly yours, Northeast Nuclear Engergy Co.

[a SW 0312130265 031128

/

PDRADOCKOS000h ard J. Mr6czka S

Station Superintendent Millstone Nuclear Power Station cc.

Director, Office of Management Information and Program Control, Washington, D.C.

(3) a U.S. Nuclear Regulatory Carmission, c/o Docunent Management Branch, oI Washington, D.C. 20555 hI 40