MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
- __ ~ . _ ._ ... . . _ .- _ . . _ . ._ _ .__ ._ ..
Wisconsin i Electnc PONER COMPANY .
on w M,cm.pn po sono 4s mouue wi 53201 (41 m ?12345 !
I VPNPD-91-304 ;.
NI<C-91-09 4 [
i September 10, 1991 i
f i
U. S. NUCLEAR REGULATORY COMMISSION ;
Document Control Desk !
Mail Station F1-137. ;
-Washington, D. C. 20555 j Gentlemen: [
t DOCKETS 50-266 AND 50-3Q1 '!
MONTilLY OPERATING REPORTS 7
' POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 ;
Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of August 1991.
I very-truly yours, I
.df?
s
& I C. . ay Vice President :
Nuclear Power l
Attachments Copies to L. L. Smith, PSCW -'
NRC Regional Administrator, Region III +
NRC Resident Inspector 9109130073 910331 PDR
.g ADOCK 05000266 PDR A subsk!by ofXinvasur Dirw nowatha
{[{ 'k), :
OPERATING DATA REFORT DOCEET NO. 50--301 .
DATE September 9, 1991 COMPLETED BY ' D. C. Peterson TEL3PHOut 414/755-2321. Ext. 361 OPERATING STATUS g
- 1. UNIT NAMES POINT BEhCR NUr* mar PIANT UNIT 2 . NOTES .
- 2. REPORTING PERICO: ADGUST 1991 . .
- 3. LIerumrm THERMAL POWER (NWT): 1518.5 . .
- 4. NAMEFIATE RATING (GROSS ISIE): 523.8 . .
- 5. DESIGN ELECTRICAL RATING'(MET Mile)s 497. . .
- 6. MAEIMUM DEFENDh3LE CAPACITT (GROSS MwB): . 509. . .
- 7. MhEIMUM DEPENDABLE ChPACITT (MET MWE): 4P5. . .. . .. ... . . . . . .... . . ... .
- 8. IF CHANGES 00 CUR IN CAPACITT RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE IAST PEPORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER IEVEL TO WHICH AESTRICTED, IF ANY (NET 3eIE): IIOT APPLICARLE
- 10. REASCIIS FOR RESTRICTIONS, (IF A30Y): NOT APPLIch5LE TEIS MOBITH YR TO DICE CUMUIATIVE
- 11. BOURS IN REPORTIIIG PERIOD 744 5,831 167,280
- 12. NUEIBER OF HOURS REACTOR WAS CRITICAL 744.0 5,831.0 146,915.5
- 13. REACTOR meernvE $NUTDOIGI IIDORs 0.0 0.0 216.7
- 14. MOCRS GENERATOR OII LINE 744.0 5,831.0 144,750.4
- 15. UNIT RESERVE SNUTDOISI HOURS 0.0 0.0 302.2
- 16. GROSS THERNAL EMERGY GENERATED (ISIE) 1,118,002 8,808,609 206,973,018
- 17. GROSS IIRCTRICIA E3IERGY DENERATED (lefH) 375,460 3,012,820 70,310,080 '
- 18. MET EECTRIchL ENERGY neuemaTED (leNE) 358,483 2,882,089 67,014,155
- 19. UNIT SERVICE PhCTOR 100.0 100.0 86.5
- 20. DIIIT AVAIIABILITT FACTOR 200.0 100.0 86.7 !
- 21. UNIT CAPACITT FACTOR (USING MDC NET) 99.3 101.9 81.9
- 22. UNIT CAPACITT FACTOR (USIIIG DER IIET) 96.9 99.5 80.6
- 23. UNIT FORCED OUTAGE RATE O.O O.0 1.1
- 24. SHUTDOISta treRENLED OVER NEET 6 MOIITES (TYPE, DATE, AIID DURATICII OF EACH) 42-day Befueling and Maintenance shutdown to start September 27, 1991.
- 25. IF SHUTDOWN AT END OF REPORT FERICO, ESTIMhTED DATE OF STAgt1T/Ps IIOT SHUTDOWN
. ., DATA REPORTED AND FACTORS CAICUIATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 '
4 e *
- y. w- y _-
t, POINT BEACH NUCLEAR P1 ANT DOCKET NO. EM AVEEAGE DAILY LDGT POtF2 MYII, UhTT NAME Pe b A Unit 2 AUGUST 1991 DATE h
- 9.1991 MONTH COMPLETED BY L T. KirA*=
l TEEPHONE 414 n iS'rt?Y l
A'.*ERAGE , AVERAGE AVERAGE DAE.Y DAILY DAILY POWER LEVEL POWERREVEL POWERIEVEL MWe NET MWe NET DAY MWe NET J2&X DAY 4t2 21 48ts 1 E U 6 22 41t5 2 4R6 12 M 23 484 l 3 4RS U ._
6 24 484 4 320 14 _
4fts 25 490 5 e 15 16 485 26 e 6 4t2 490 27 499 l 7 -:lt2 17 49c 2 e9 8 __ 4s4 m l
487 29 #9 9 4a0 19 3L -- A
.. reeaxa.
M O W v n ke y
4
POINT BEACH NUCLEAR PLANT Dodus No. - ; sort Unit Namne Pa mA Unia2 UNH SHUIDOWNS AND POWER BEDUCHONS Dase Sepaumber 9.1991 Conspkzed By D. C. Pm REPORT MONDI AUGUST - 1991 Telephone No. 414/715-ZI2L Est 361 Mestod er senareg N2 D ne Tyrc' Dwan.m c- ,
Ranson8 Do.m F = - Eucet
- -a Synaam coae*
Wrw$ Ca e sad Carec6e Action T. ri r ----
I 1 9 Ends s 13 a s em En crrmax se hanwx* (sr.),. i a a,.n aes w o mi i ,
t
'P Forced
. 'P ensan- ' Method: hhr G - kaar=rma=,
S: 4Mird A",, - Faihare (captab) 1 - Manant for preparaman of B M======rm or Testing 2 - Ma===3 Scram data caery sheces C - Refimebag 3 - Awa==hr Scrasa IER file (NUREG4161)
D-P-;'^5 Restremaa 4 emm et E - Operaser Tr%. A EWvices Shutdown Ueemaing Emmen 5 - FM toad F- AA.=i.orabee 6 - Other (explain) hihir I- Some Souses G - C-/-- ' Error (capiain)
H - Other (captain)
- n= ,
ge%%3 e
)
t
DOCKET NO.: 50.301 UNIT NAME: Point Beach Nuclear Plant DATE: September 9, 1991 COMPLETED BY: D. C. Peterson TELEPHONE: (414)755-2321, Extension 361 Unit 2 operated at approximately 482 MWe net throughout this report period with one significant load reduction. The load reduction was caused by a gas leak in a switchyard circuit breaker. Repair of the circuit breaker necessitated alignment of Unit 2 with only one outgoing line. Power was reduced to less than 50 percent during the repair in accordance with Technical Specification 15.3.7.b.1.a.
Safety-related maintenance included the following: repaired a contact in Train A T,y to loops A/B main steam isolation logic relay.
~ . . . - _ . _ ._. . - _ - - - - _ _ - _ - - . - . - - - - _ - - - _ - - - - - - _ _ _ _ . - - _ _ - - - . - - - - - - _ _
OPIGtATIIeG DATA REPORT DOCKET NO. 50-266 .
DATE . September 9.1991 COMPLETED BT D. C. Peterson TELEPHONE 414/755-2321, Ext. 361 OPERATING STATDS
- 1. UNIT NAME: POINT BEACH NUCLEAR PIANT UNIT 1 . NOTES .
- 2. REPORTING PERIOD: AUGUST 1991 . .
- 3. LICENSED THERNAL PONER (MNT): 1518.5 .
- 4. NAMEPLATE RATIleG (GROSS 388E): 523.8 . .
- 5. DESIGN ELECTRICAL RATIl6G (NET MNE): 497. . .
- 6. hAXIMUM DEPESIDASLE CAPACITT (GROSS MWE): 509. . .
- 7. MAXIMUM DEPENDABLE CAPACITY (HET M4fE)s .485. . . . .. .. .. . . . .. ...... ....
- 8. IF CIUu1GES OCCUR IN CAPACITT RATIIOGS (ITEMS NUMBER 3 TtutOUGH 7) SINCE LAST REPORT GIW REA800fS Nor APPLICABLE
- 9. POWER LEVEL TO WRICE RESTRICTED, IF ANT (NET MWE): NOT APPLICABLE
- 10. ItEAsonS FOR RESTRICTIcers, (IF ANT): L*0T AFFLICARLE suis M0erts TR to DATE CuscnATIVE
- 11. BOURS IN REPORTDfG PERICO 744 5,831 182,495
- 12. ammKm OF HOURS REACTOR ttAS CRITICAL 744.0 4,773.6 150,541.2
- 13. REACTOR RESERVE SHUTDotel BOURS 0.0 0.0 652.7 744.0 4,698.6 147,602.2
- 14. BOURS GENERATOR Cet LINE
- 15. UNIT RESERVE SHUTDOWN BOURS 0.0 0.0 837.9
- 16. GROSS T1tERMAL ENEatGY GElfERATED (MWH) 1,128,204 7,050,4C2 206,457,097
- 17. GROSS EIJtCTRICAL ElfERGY GENERATED (MWH) 376,320 2,393,260 69,695,640
- 18. IfET EIACTRICAL E3GDtGT GE3tERATED (MWH)' 359,519 2,284,196 66,405,236
- 19. UNIT SERVICE FACTOR 100.0 80.6 80.9 l
- 20. UNIT AVAILABILITY FACTOR 100.0 80.6 81.3 99.6 80.8 74.6 i
- 21. UNIT CAPACITY FACTOR (USIlfG MDC NET)
- 22. UNIT CAPACITY FAC'ICR (USIIIG DER NET) 97.2 78.8 73.2
- 23. UNIT POftCID OUTAGE RATE O.0 ' O.S 1.7
- 24. SECTDOtotS SCHEDUIAD OVER NEXT 6 M00fTBS (TYPE, DATE, AMD DURATI(Mt OF EACH):
d 3003IE
- 25. IF SHUTD005 AT EIID OF REPostT FERICO, ESTIMATED DATE W STARTUP 300T SHUTDOWN DATA REPORTED AND PACTORS CALCUIATED AS RBQUESTED IN NRC IATTER DATED SEPTEDGBER 22, 1977 k
4
. ~. .
PODir BEACH NUCLEAR PLAIN DOCKETNO. 50-2 6 A'13tAGE DAILY UNIT POWER IE1EL UNTT NAMF, Pasar Beach. Umst 1 MOWiH AUGUST - 1991 DATE Sesacmaher 9.1991 COMPLETED BY D_ C Fer-
"IELEPHONE 414/755 m AVERAGE AVERAGE , AVERAGE DAILY DAILY DAILY POWER 1.EVEL POWER IEVEL POWER LEVEL DAY MWe NET E MWe NET DAY MWe NET 1 e 11 e 21 4E2 2 484 12 479 22 e 3 4f1 13 477 -
23 4R1 4 4RI 14 e 24 481 5 481 15 4R2 25 4a5 6 479 16 481 26 493 7 479 17 492 27 494 8 481 18 4K1 25 494 9 479 19 484 29 495 10 _y 20 m - 30 495 31 4R3 rw=m.
(GW) .
s
& O
. [ t l
,l w
1 1
y -
t 1 n 99 i
U 1 m ,
-r2 t
h 9 e '
- z -
6 h- 5 r5 M
6 2 r= C /4 -
0 5
WS D .
1 4
sn ec
)
1 6
1 A s 4 s c
y o. u mf C- r u
oe . BN rc ?
n o
S h
d u Nma e t
eN l t
eA p d iohU t
s n y(
e m
m a
re N I
ditem t n - rc S -
onaoi DUDCT a
em G t
nS e I m
o aR i r
C h fdIrtI o a h i ,
h a x F
F S ,
N ,.
O H ,
f C ,
V L 1 9 o A DE 9 I
1 n
n F R a R R TS m A E U mra o f h d )n EW OG uc ai UA . aSns r nu ol a .
C P c eioLy n U . Sr r=vd i u N Dh -
aam a m l i e e e r r r (c
e uz H
C t E D
nn=u d ad e
g A h N 5 n a
MMMAhaa*sP= r PO E W O i s
W1234 56 B
T O M s y -
N.
D T T O U R s
=
P H O P =
S E r..
f f R s
N es U t e
a
)
a t
c n Wj g i
h g
s w.
a w n a o (c si m u& (e mD t
tr ee rT igm a w hr t r
s az r 8
i ao ei nE=Eir Rragu! m a )n m l m
e t yTia ntn p n rae ax s
te F Nr a n
m a
p l rnrar et o e m r e
e m
=
r i
eM un gef q ar'wi#(h e p e
doO A
t mi w eE -
u.- R- -R O - , -
D 'RABCDE F0H -
2 p ,
y ,
T .
e e M Jh D w w n .
4 n O n
FL a -
w m '
ES :
mM r 9
e y
4 t DOCKET NO. 50-266
' UNIT NAME: Point Beach Unit 1-DATE: .
September 9, 1991 COMPLETED BY: D. C. Peterson TELEPHONE: (414)755-2321,-Ext. 361 Unit 1 operated at approximately 483 MWe net throughout this report period with no significant load reductions.
A reportable event in accordance with 10 CFR 50.73 (UER 91-010-00) was discovered on August 16, 1991, when it was determined that hydrogen monitors in both units powered from the
. white instrument bus had been operating with default calibration parameters for greater than 30 days. It was determined that the shift to the default calibration parameters occurred when the white instrument bus lost power on June 29, 1991. The monitors were immediately recalibrated and returned to service. This was a violation of Technical Specification Table 15.3.5-1, Item 10.
Safety-related maintenance included the following: replaced
, emergency diesel generator starting air bank solenoids, charged three individual station battery cells, replaced emergency diesel generator coolers, replaced high voltage power supply for nuclear power detector 1 N-43.
-