Monthly Operating Repts for Aug 1991 for Point Beach Nuclear Plant,Units 1 & 2
ML20082Q808
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/31/1991
From: Fay C, Peterson D
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-91-094, CON-NRC-91-94 VPNPD-91-304, NUDOCS 9109130073
Download: ML20082Q808 (9)


Text

- __ ~ . _ ._ ... . . _ .- _ . . _ . ._ _ .__ ._ ..

Wisconsin i Electnc PONER COMPANY .

on w M,cm.pn po sono 4s mouue wi 53201 (41 m ?12345  !

I VPNPD-91-304  ;.

NI<C-91-09 4 [

i September 10, 1991 i

f i

U. S. NUCLEAR REGULATORY COMMISSION  ;

Document Control Desk  !

Mail Station F1-137.  ;

-Washington, D. C. 20555 j Gentlemen: [

t DOCKETS 50-266 AND 50-3Q1 '!

MONTilLY OPERATING REPORTS 7

' POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2  ;

Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of August 1991.

I very-truly yours, I

.df?

s

& I C. . ay Vice President  :

Nuclear Power l

Attachments Copies to L. L. Smith, PSCW -'

NRC Regional Administrator, Region III +

NRC Resident Inspector 9109130073 910331 PDR

.g ADOCK 05000266 PDR A subsk!by ofXinvasur Dirw nowatha

{[{ 'k), :

OPERATING DATA REFORT DOCEET NO. 50--301 .

DATE September 9, 1991 COMPLETED BY ' D. C. Peterson TEL3PHOut 414/755-2321. Ext. 361 OPERATING STATUS g

1. UNIT NAMES POINT BEhCR NUr* mar PIANT UNIT 2 . NOTES .
2. REPORTING PERICO: ADGUST 1991 . .
3. LIerumrm THERMAL POWER (NWT): 1518.5 . .
4. NAMEFIATE RATING (GROSS ISIE): 523.8 . .
5. DESIGN ELECTRICAL RATING'(MET Mile)s 497. . .
6. MAEIMUM DEFENDh3LE CAPACITT (GROSS MwB): . 509. . .
7. MhEIMUM DEPENDABLE ChPACITT (MET MWE): 4P5. . .. . .. ... . . . . . .... . . ... .
8. IF CHANGES 00 CUR IN CAPACITT RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE IAST PEPORT, GIVE REASONS:

NOT APPLICABLE

9. POWER IEVEL TO WHICH AESTRICTED, IF ANY (NET 3eIE): IIOT APPLICARLE
10. REASCIIS FOR RESTRICTIONS, (IF A30Y): NOT APPLIch5LE TEIS MOBITH YR TO DICE CUMUIATIVE
11. BOURS IN REPORTIIIG PERIOD 744 5,831 167,280
12. NUEIBER OF HOURS REACTOR WAS CRITICAL 744.0 5,831.0 146,915.5
13. REACTOR meernvE $NUTDOIGI IIDORs 0.0 0.0 216.7
14. MOCRS GENERATOR OII LINE 744.0 5,831.0 144,750.4
15. UNIT RESERVE SNUTDOISI HOURS 0.0 0.0 302.2
16. GROSS THERNAL EMERGY GENERATED (ISIE) 1,118,002 8,808,609 206,973,018
17. GROSS IIRCTRICIA E3IERGY DENERATED (lefH) 375,460 3,012,820 70,310,080 '
18. MET EECTRIchL ENERGY neuemaTED (leNE) 358,483 2,882,089 67,014,155
19. UNIT SERVICE PhCTOR 100.0 100.0 86.5
20. DIIIT AVAIIABILITT FACTOR 200.0 100.0 86.7  !
21. UNIT CAPACITT FACTOR (USING MDC NET) 99.3 101.9 81.9
22. UNIT CAPACITT FACTOR (USIIIG DER IIET) 96.9 99.5 80.6
23. UNIT FORCED OUTAGE RATE O.O O.0 1.1
24. SHUTDOISta treRENLED OVER NEET 6 MOIITES (TYPE, DATE, AIID DURATICII OF EACH) 42-day Befueling and Maintenance shutdown to start September 27, 1991.
25. IF SHUTDOWN AT END OF REPORT FERICO, ESTIMhTED DATE OF STAgt1T/Ps IIOT SHUTDOWN

. ., DATA REPORTED AND FACTORS CAICUIATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 '

4 e *

y. w- y _-

t, POINT BEACH NUCLEAR P1 ANT DOCKET NO. EM AVEEAGE DAILY LDGT POtF2 MYII, UhTT NAME Pe b A Unit 2 AUGUST 1991 DATE h

  • 9.1991 MONTH COMPLETED BY L T. KirA*=

l TEEPHONE 414 n iS'rt?Y l

A'.*ERAGE , AVERAGE AVERAGE DAE.Y DAILY DAILY POWER LEVEL POWERREVEL POWERIEVEL MWe NET MWe NET DAY MWe NET J2&X DAY 4t2 21 48ts 1 E U 6 22 41t5 2 4R6 12 M 23 484 l 3 4RS U ._

6 24 484 4 320 14 _

4fts 25 490 5 e 15 16 485 26 e 6 4t2 490 27 499 l 7 -:lt2 17 49c 2 e9 8 __ 4s4 m l

487 29 #9 9 4a0 19 3L -- A

.. reeaxa.

M O W v n ke y

4

POINT BEACH NUCLEAR PLANT Dodus No. -  ; sort Unit Namne Pa mA Unia2 UNH SHUIDOWNS AND POWER BEDUCHONS Dase Sepaumber 9.1991 Conspkzed By D. C. Pm REPORT MONDI AUGUST - 1991 Telephone No. 414/715-ZI2L Est 361 Mestod er senareg N2 D ne Tyrc' Dwan.m c- ,

Ranson8 Do.m F = - Eucet

- -a Synaam coae*

Wrw$ Ca e sad Carec6e Action T. ri r ----

I 1 9 Ends s 13 a s em En crrmax se hanwx* (sr.),. i a a,.n aes w o mi i ,

t

'P Forced

. 'P ensan- ' Method: hhr G - kaar=rma=,

S: 4Mird A",, - Faihare (captab) 1 - Manant for preparaman of B M======rm or Testing 2 - Ma===3 Scram data caery sheces C - Refimebag 3 - Awa==hr Scrasa IER file (NUREG4161)

D-P-;'^5 Restremaa 4 emm et E - Operaser Tr%. A EWvices Shutdown Ueemaing Emmen 5 - FM toad F- AA.=i.orabee 6 - Other (explain) hihir I- Some Souses G - C-/-- ' Error (capiain)

H - Other (captain)

- n= ,

ge%%3 e

)

t

DOCKET NO.: 50.301 UNIT NAME: Point Beach Nuclear Plant DATE: September 9, 1991 COMPLETED BY: D. C. Peterson TELEPHONE: (414)755-2321, Extension 361 Unit 2 operated at approximately 482 MWe net throughout this report period with one significant load reduction. The load reduction was caused by a gas leak in a switchyard circuit breaker. Repair of the circuit breaker necessitated alignment of Unit 2 with only one outgoing line. Power was reduced to less than 50 percent during the repair in accordance with Technical Specification 15.3.7.b.1.a.

Safety-related maintenance included the following: repaired a contact in Train A T,y to loops A/B main steam isolation logic relay.

~ . . . - _ . _ ._. . - _ - - - - _ _ - _ - - . - . - - - - _ - - - _ - - - - - - _ _ _ _ . - - _ _ - - - . - - - - - - _ _

OPIGtATIIeG DATA REPORT DOCKET NO. 50-266 .

DATE . September 9.1991 COMPLETED BT D. C. Peterson TELEPHONE 414/755-2321, Ext. 361 OPERATING STATDS

1. UNIT NAME: POINT BEACH NUCLEAR PIANT UNIT 1 . NOTES .
2. REPORTING PERIOD: AUGUST 1991 . .
3. LICENSED THERNAL PONER (MNT): 1518.5 .
4. NAMEPLATE RATIleG (GROSS 388E): 523.8 . .
5. DESIGN ELECTRICAL RATIl6G (NET MNE): 497. . .
6. hAXIMUM DEPESIDASLE CAPACITT (GROSS MWE): 509. . .
7. MAXIMUM DEPENDABLE CAPACITY (HET M4fE)s .485. . . . .. .. .. . . . .. ...... ....
8. IF CIUu1GES OCCUR IN CAPACITT RATIIOGS (ITEMS NUMBER 3 TtutOUGH 7) SINCE LAST REPORT GIW REA800fS Nor APPLICABLE
9. POWER LEVEL TO WRICE RESTRICTED, IF ANT (NET MWE): NOT APPLICABLE
10. ItEAsonS FOR RESTRICTIcers, (IF ANT): L*0T AFFLICARLE suis M0erts TR to DATE CuscnATIVE
11. BOURS IN REPORTDfG PERICO 744 5,831 182,495
12. ammKm OF HOURS REACTOR ttAS CRITICAL 744.0 4,773.6 150,541.2
13. REACTOR RESERVE SHUTDotel BOURS 0.0 0.0 652.7 744.0 4,698.6 147,602.2
14. BOURS GENERATOR Cet LINE
15. UNIT RESERVE SHUTDOWN BOURS 0.0 0.0 837.9
16. GROSS T1tERMAL ENEatGY GElfERATED (MWH) 1,128,204 7,050,4C2 206,457,097
17. GROSS EIJtCTRICAL ElfERGY GENERATED (MWH) 376,320 2,393,260 69,695,640
18. IfET EIACTRICAL E3GDtGT GE3tERATED (MWH)' 359,519 2,284,196 66,405,236
19. UNIT SERVICE FACTOR 100.0 80.6 80.9 l
20. UNIT AVAILABILITY FACTOR 100.0 80.6 81.3 99.6 80.8 74.6 i
21. UNIT CAPACITY FACTOR (USIlfG MDC NET)
22. UNIT CAPACITY FAC'ICR (USIIIG DER NET) 97.2 78.8 73.2
23. UNIT POftCID OUTAGE RATE O.0 ' O.S 1.7
24. SECTDOtotS SCHEDUIAD OVER NEXT 6 M00fTBS (TYPE, DATE, AMD DURATI(Mt OF EACH):

d 3003IE

25. IF SHUTD005 AT EIID OF REPostT FERICO, ESTIMATED DATE W STARTUP 300T SHUTDOWN DATA REPORTED AND PACTORS CALCUIATED AS RBQUESTED IN NRC IATTER DATED SEPTEDGBER 22, 1977 k

4

. ~. .

PODir BEACH NUCLEAR PLAIN DOCKETNO. 50-2 6 A'13tAGE DAILY UNIT POWER IE1EL UNTT NAMF, Pasar Beach. Umst 1 MOWiH AUGUST - 1991 DATE Sesacmaher 9.1991 COMPLETED BY D_ C Fer-

"IELEPHONE 414/755 m AVERAGE AVERAGE , AVERAGE DAILY DAILY DAILY POWER 1.EVEL POWER IEVEL POWER LEVEL DAY MWe NET E MWe NET DAY MWe NET 1 e 11 e 21 4E2 2 484 12 479 22 e 3 4f1 13 477 -

23 4R1 4 4RI 14 e 24 481 5 481 15 4R2 25 4a5 6 479 16 481 26 493 7 479 17 492 27 494 8 481 18 4K1 25 494 9 479 19 484 29 495 10 _y 20 m - 30 495 31 4R3 rw=m.

(GW) .

s

& O

. [ t l

,l w

1 1

y -

t 1 n 99 i

U 1 m ,

-r2 t

h 9 e '

z -

6 h- 5 r5 M

6 2 r= C /4 -

0 5

WS D .

1 4

sn ec

)

1 6

1 A s 4 s c

y o. u mf C- r u

oe . BN rc  ?

n o

S h

d u Nma e t

eN l t

eA p d iohU t

s n y(

e m

m a

re N I

ditem t n - rc S -

onaoi DUDCT a

em G t

nS e I m

o aR i r

C h fdIrtI o a h i ,

h a x F

F S ,

N ,.

O H ,

f C ,

V L 1 9 o A DE 9 I

1 n

n F R a R R TS m A E U mra o f h d )n EW OG uc ai UA . aSns r nu ol a .

C P c eioLy n U . Sr r=vd i u N Dh -

aam a m l i e e e r r r (c

e uz H

C t E D

nn=u d ad e

g A h N 5 n a

MMMAhaa*sP= r PO E W O i s

W1234 56 B

T O M s y -

N.

D T T O U R s

=

P H O P =

S E r..

f f R s

N es U t e

a

)

a t

c n Wj g i

h g

s w.

a w n a o (c si m u& (e mD t

tr ee rT igm a w hr t r

s az r 8

i ao ei nE=Eir Rragu! m a )n m l m

e t yTia ntn p n rae ax s

te F Nr a n

m a

p l rnrar et o e m r e

e m

=

r i

eM un gef q ar'wi#(h e p e

doO A

t mi w eE -

u.- R- -R O - , -

D 'RABCDE F0H -

2 p ,

y ,

T .

e e M Jh D w w n .

4 n O n

FL a -

w m '

ES  :

mM r 9

e y

4 t DOCKET NO. 50-266

' UNIT NAME: Point Beach Unit 1-DATE: .

September 9, 1991 COMPLETED BY: D. C. Peterson TELEPHONE: (414)755-2321,-Ext. 361 Unit 1 operated at approximately 483 MWe net throughout this report period with no significant load reductions.

A reportable event in accordance with 10 CFR 50.73 (UER 91-010-00) was discovered on August 16, 1991, when it was determined that hydrogen monitors in both units powered from the

. white instrument bus had been operating with default calibration parameters for greater than 30 days. It was determined that the shift to the default calibration parameters occurred when the white instrument bus lost power on June 29, 1991. The monitors were immediately recalibrated and returned to service. This was a violation of Technical Specification Table 15.3.5-1, Item 10.

Safety-related maintenance included the following: replaced

, emergency diesel generator starting air bank solenoids, charged three individual station battery cells, replaced emergency diesel generator coolers, replaced high voltage power supply for nuclear power detector 1 N-43.

-