Forwards Results of Initial Valve Integrity Verification Procedures in Response to Item 5 of IE Bulletin 83-03, Check Valve Failures in Raw Water Cooling Sys of Diesel Generators. No Failures Identified
ML20082Q562
Person / Time
Site: Beaver Valley
Issue date: 11/29/1983
From: Carey J
DUQUESNE LIGHT CO.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
REF-SSINS-6820 IEB-83-03, IEB-83-3, NUDOCS 8312120252
Download: ML20082Q562 (3)


Text

,

d 4

4

~'@

  • A Telephone (412) 393-6000 Nuclear Division P.O. Box 4 Shippingport, PA 15077-0004 U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement Attn: Dr. Thomas E. f!urley, Regional Administrator Region I 631 Park Avenue King of Prussia, PA 19406

Reference:

Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 IE Bulletin 83-03 Centlemen:

Attaci..d are the results of the initial valve integrity verification procedures for Beaver Valley Power Station, Unit No. I as required by Item 5 of IE Bulletin 83-03, " Check Valve Failures in Raw Water Cooling Systems of Diesel Generators". No failures were identified by the verifica-tion procedures.

The manpower expended to perfom the valve integrity verification procedures is estimated to be 100 manhours.

If you have any questions concerning this response, please contact my office.

Very tr ly yours,

/

.J Carey Vice Preside t, Nuclear Attachment cc: f!r. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Commission

-c/o Document flanagement Branch Washington, DC 20555 Director, Safety Evaluation & Control Virginia Electric & Power Company F.0. Box 26666 One James River Plaza Richmond, VA 23261 gl 8312120252 831129 PDR ADOCK 05000334  !

O PDR I/

i

COMMONWEALTH OF PENNSYLVANIA)

) SS:

COUNTY OF BEAVER )

me, On this [M day of ga , /fefd , before

/7). -Prd/rets, a Notary Public in and for said Commonwealth and County, personally appeared J. J. Carey, who being duly sworn, deposed, and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge, information and belief.

&N- M SHEllA M. FATTORE, NOTARY PG8t!C sNIPPINGPORT 0080. SEAVER COUNTY HY C0HIS$10M EXPitt1stPT.16.1985 Mernbu, Pennsylvania Association of Notahs e

9

IE Bulletin 83-03 Initial Valve Integrity Verification Report Item 5 Licensees are requested to submit a report to the NRC within 90 days of completion of the results of the initial valve integrity verification procedure performed in accordance with (3)above. For those valves which are found to have undergone either partial or complete disassembly of valve internals, a description of the failure mode should be included.

Response The results of the initial valve integrity verification pro-cedures are summarized below. No failures were identified by our verification procedures.

Valve Initial In teg ri ty No. Verification Procedures Resul ts RW-57 Forward Flow: OST 1.30.2 Passed acceptance criteria.

Reverse Flow: OST 1.30.3 and 6 RW-58 Forward Flow: OST 1.30.3 Passed acceptance criteria.

Reverse Flow: OST 1.30.2 and 6 RW-59 Forward Flow: OST 1.30.6 Passed acceptance criteria.

Reverse Flow: OST 1.30.2 and 3 RW-107 Disassembled and inspected in Internals inspected and found conjunction with ISI Hydro on in good condition.

Buried River Water Lines per CMP l-75-186.

i

, RW-106 Disassembled and inspected in Internals inspected and found l conjunction with ISI Hydro on in good condition (performed Buried River Water Lines per during second refueling outage).

Cf;P l-75-186.