Monthly Operating Rept for Aug 1991 for Monticello Nuclear Generating Plant
ML20082Q367
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 08/31/1991
From: Parker T, Paustian H
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9109120122
Download: ML20082Q367 (5)


Text

0 Northem States Power Company 414 Nicollet Mall Minneapolis. Minnesota 55401 1927 Telephone (612) 330-5500 I

September 6, 1991 Monticello Technical Specifications

%ction 6.7.A,3

..US Nuclear Regulatory Commission Attnt. Document Control Desk Washington, DC 20555 MON'IICELLO NUCLEAR CEN2. FATING PIANT Docket No. 50-263 Licenne No. DPR 22 Monthly Operating Report 6H&ust 1991 l

l Attached is the Monthly Operating Report for August 1991 for the Monticello Nuclear Generat ng Plant.

41 Tlomas M Parker-Manager i

Nuclear Support Service i

TMP/mkl h

C:

Director, Office of Resaurce Management 1

66 onal Administrator III, NRC NPR Project Manager, NRC i

NRC Resident Inspector MPCA

)

Attn: J V Ferman Attachment l

]

t 4

t E-9109120122 910831 i

PDR ADDCK 05000263 j}v R

PDR y

v

OPERATING DATA REPORT DOCKET NO.

50-262 DATE 9-2-91 COMPLETED BY H.

H.

Paustian TELEPHONE 612/295-5151 1 Phi. TING STATUS lNotes

]

Monticello

)

]

1. Unit Name :
2. Report!ng pe'riod:

AUGUST

]

]

3. Licensed Thermal Power (MWt):

1670

)

)

4. Nameplate Rating (Gross MWe):

569

]

]

5. Design Electrical Rating (Net MWe):

545.4

)

)

6. Maximum Dependable Capacity (Gross MWe): __564

)

)

7. Maximum Dependable Capacity (Net MWe):

536 1

)

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Las't Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):

N/r

10. Reasons For Restrictions, If Any:

N/A THIS MONTH YR.-TO-DATE CUMULATIVE

11. Hours In Reporting Period 744 5831 176808
12. Number Of Hours Reactor was Critical 710.9 4146.6 140489.4
13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
14. Hours Generator On-Line 701.2 4068.4 137818.9
15. Unit Reserve Sbutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1163686 6335732 210658666
17. Gross Electrical Energy Generated (MWH) 387931 2115003 71243563
18. Net Electrical Energy Generated (MWH) 368819 2013091 68120338
19. Unit Service Factor 94.2%

69.8%

77.9%

20. Unit Availability Factor 94.2%

69.8%

77.9%

21. Unit Capacity Factor (Using MDC Net) 92.5%

64.4%

71.9%

22. Unit Capacity Factor (Using DER Net) 90.9) 63.3%

70.6%

23. Unit Forced Outage Rate 5.85 5.2%

4.0%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
__None
25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A
26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-263 DATE 9-2-91 COMPLETED BY-H.

H.

Paustian TELEPHONE 612/295-5151 MONTH AUGUST 8-1-91 to Power operation.

8-31-91 8-25-91 Scram caused by loss of transformer supplying offsite power during thunderstorm.

8-27-91 to Generator on-line.

Power operation.

8 31-91 Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.

AVERAGE Dh1LY UNIT POWER LEVEL

^

DOCKET NO.

50-263 UNIT Monticello-DATE 9-2-91 COMPLETED BY H.

H. Paustian TELEPHONE 612/295-5151 MONTH OF AUGUST DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1

529, 17 530.

2

530, 18
512, 3

536.

19 528.

4

527, 20 531.

5 532.

21 529.

6

532, 22 529.

7

531, 23 531.

8

537, 24 533.

9 535.

25

124, 10
524, 26

-8.

27

434, 11 535. _

12

529, 28 525.

13 529.

29 528.

14 531.

30 518.

15 522.

31 536.

16 529.

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each Jay in the reporting month.

Compute to the nearest whole megawatt, i

l

DXKET rio. 50-263 __

INIT SIRTTDOWS ARID POVER PJ1PJCTI0t15 WIT FIAME MontIceuo DATE -V)-02-91 612/ $5NY-LEP1 REPORT Mormi _ August Cause & Corrective Duration Reason Method LER System Comp.

Ty(pe (hours)

(2) of

!Jo.

Code Code Action to tio.

Date 1)

Shutdovn (4). (5)

Prevent Recurrence (3)

}

Reactor scram occurred when insulator on 115KV 7

08-25-91 F

42.8 A

3 91-019 E

INS If.ne supplying station Reserve Transformer failed.

Pover loss to PES MG sets caused several RPS trips.

3 4

I 2

Method:

Draft IEEE Standard F: Forced Reason:

1-Manual 805-1984(P805-DS)

S: Scheduled A-Equipment Failure (Explain) 2-Manual Scram B-Maintenance or Test 3-Automatic Scram 5

C-Refueling 4-Other (Explain)

IEEE Standard 803A-1933 D-Regulator Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) w--_-