4 W*"

.~

~

. Log # TXX-91323

. .~~ File # 10010 C C 916 (TRH) 71/ELEC7RIC Ref. # 10CFR50.30 1

l September 6, 1991 Williara J. C.hllt. Jr.

becunvr8url'ren.orm V. S. Nuclear Regulatory Commission Attnt Document Control Desk Washington, DC 20555 StIDJ EL : : C0HANCHE PEAK STEAH ELECTRIC STATION (CPSES)

DOCKET NO. 50 445 TRANSHITTAL OF TECHNICAL RE0VIREMENTS HANUAL, REVISION 5 Gentlemen:

TV Electric herewith submits Revision 5 (enclosed) of the CPSES Technical Requirements Manual.

Enclosed are t he f ollowing documents:

Technical Requirements Manual - 1 signed (and sworn) original Revision 5 and 37 copies A page-by page description of the changes is attached, The group number assigns a level of significance for each change made to the Technical Requirements Manual consistent with IV Electric's letter TXX-88407 of June 1, 1988. Please insert the revised pages into ,vour controlled copy per the enclosed instruction.

Sincerely,

/ .

William J. Cahill, Jr.

CBC/vid Attachments Enclosure c - Mr. R. D. Hartin, Ragion IV he ,i de.nt lonpectors. CPSU f 3) 100053 e1o9120001 910906 PDR ADOCK 05000445 400 so,,s on ,si,,,, t.ii si n.ii . Tex.,7520: 30 M .

P PDR I) l

Attachment I to TXX 91323 Page 1 of 1 UNITED STATES OF AMERICA NUCLEAR REGULA10RY COMMISSION in the Matter of )

)

Texas utilities Electric Company ) Docket No. 50-445

)

(Comanche Peak Steam Electric )

Station, unit 1) >

AfflMyll William J. Cahill, Jr. being duly sworn, hereby deposes and says that he is Executive Vice President, Nuc1 car of TV Electric, that he is duly authorized to sign and file with the Nuclear Regulatory Commission this transmittal of Revision 5 of the Technical Requirements Manual: that he is f amiliar with the content thereof; and that the matters set forth therein are true ar.d correct to the best of his knowledge, inforaiation and belief.

  • 9 4Y /

_ William J, Cahil ', Jr.

)

Exe;utive Vice President, Nuclear STATE OF TEXA$ )

)

COUNTY OF DAll45 )

_, day of ee +o Subskribedandsworntobeforeme,aNotaryPublic,onthis_

, 1991.

u pL ,-

At tachment 2 to YX"-9132 3 CpSES TRH REVISION 5  !

, ParJe 1 of 2 DETAILED DESCRIPTION Page ) l i

i IRM Page I

(#1 amendeM Rpup Dt}gtlpi.ign i

33,4 3 See Page Nots): 3 3. 4 Revise Sectton 3.lb in accordance with Generic Letter 90 09 .

Revision: i lhe current visual e< amination frequency table is based only on the number of inoperable snubbers found during the previous visual inspection, irrespective of the size of the snubber population.

TRH Change Request Number: 1R 91003.1 SER/SSLR 1mpact: No 3*6 3 See page No(s):3-6 Delete re f erences to t he " Reject Line" wit h respect to the "37" sample plan in section 3.le(2).

Revision:

1his change is being made to climinate the "keject Line" f rom the 37 plan. Deleting the " Reject Line" will eliminate the possibility of rejecting a good snobber population without increasing the possibility of accepting a bad population. ASHL/ANS) OH 1981 Part 4 w'is revised to delete the " Reject Line" from the : tandat d.

1RM Change Request Number TR 91003.2 SLR/5SER linpact : No 36 3 See Page No(s):3 6 Delete references to the "55" sample plan in Section 3.!e(3).

Revision:

Because there is a choice of three sample plans, 10%.

37%, and 55%, with the 55% plan being the least desirable to use, the 551 plan is being deleted. The 55% plan would not be uaed at CPSES by choice, in addition, Ast1E/ ANSI OH 1987, Part 4. niso deletes the 55% plan, TRM Change Request Number: 1R 91003.3 SLp!SSER linpact: No 37 3 See Paoe No(s):3-7 Oclete ref er ence to sunhbets specifically reqntred not to displate under tontinuous load in sect ion 3,1f t 4 ) .

Revision:

This tyt.e of snubber is not used at CP5l5 and ihetefofe does not need t o he included in the 1 ktl .

ILH Change kequest Number: 1R-91003.4 SER/SSLR Impact: No

a , .- - -s ~ ..--. , u _ ,,&-

Attachment 2 to TXX-91323 CP5ES 1RH REVISION 5 l'a d 2 of 2 DETAILED DESCRIPfl0N Page 2 1RH Page (M Antttdtd) ftC9FP !!titr_iRtigrt figure 3.1 1 3 See Sheet No(s):3.9 Delete " Reject Line" from TRH Figure 3.1-1 Revision:

The " Reject Line" is being removed from the TRH to eliminate the possibility of rejecting a good snubber population without increasing the possibility of accepting a " bad" population of snu'ebers. Refer to t o T R 91003. 2 for related change to TRM 3 le(2).

TRH Change Request Number: TR-91003.5 SER/55ER linpact : No l

l l

l l

A(( M_SUPJ((} QQMG[p

%  % 323 TR n1 REV S W. G. Counsil 1901 H. D. bruner [21 J. Ellis (CASE) (FC)

M. D. Spence / 315T J. C. Hicks 1801 J. f. Streeter . E '=- m ew J. L. Vota (FC)

W. J. Cahill E22 (NODIL) 007A N. 5. Reynolds (fC)

F. Johnson (FC)

C. D. Hogg E01 R. D. Walker / 24ST J. W. Muffett (07D SD A f(

J. S. Marshall 4 P - C e4+h-W 4 A. H u s a i n ,' 4 M dhN)--t W R. A. Wooldridge 32BT R. D. Calder (29 Mywd 4ff 1, R. M. fillmore 3201 J. L. French RTI A. D. Scott 010 (f}LS._lR,1 RESPONS($

R. L. Ramsey 16DT J. J. Felley 000 *3--Atittnt-+04 H, R, B1evins 009 t6 --Am4-44.-044 H. C. Schmidt 245T P. B. Stevens 00(> t+--M y n e N ; ' ""-' 'fE)

J.F. McMahon 101 CCS - E06 D. Buschbaum 006 TXX File (Corp.) 245T 1XX fil( (Site) A09 D. L Use4hn-M%

W,%. ' '^ and A44 QT H( R

[ [ /._ O k M--S a k* e--A49 5 .' Palmer [24 1--*-+ioW-46 (ORC or Stipulation ReIated)

LETTER OfJ0' C-un un0E GXCEPT TRM c. uamaa m-nm c"L D~. n, ritttWO8 CDPY hl0L DE R.$ cyi , ygg gpy gogyp$

b Al~[/9(//t)7FM7 [

fis;d. 1 1 A f 1J i AfMi

^[' U,mg'2A5L_ ~

ENCL %OR E $ A(l'/ Jay)jfgf (FC) -

First Class Mail gg NODIL - Correspondence related to material / component acceptability. @

10ER - Correspondence which pertains to 10ER program (e.g., generic letters, NRC information notices, NRC bulletins, etc.) and CPSE5 Inspection Reports.

CASE - All filings and correspondence between the NRC staff and TV Electric.

ORC - All SDAR's, LER's. CPSES Inspection Reports and responses NRC Bulletins and responses and Generic Letters and responses, and description letters for changes to licensing bases documents.

ISEG - All 10ER material p l u ', i nspection reports for 10 Electric and other plants.

VENDOR Vendor dotuments pr :,TA-2n6 (Vendor Document Grour or VET 10 Coordinator)

August 15, 1991 I

l l

i

. I 1 ,

1 CPSLS/TRH t t

00HANCitt PLAK STEAM ELECTRIC STA110N 1ECHNICAL RE0VikEMENTS HANUAL (TRH) ,

I INSTRUCTION SilECT The following instructional information and check list is being furnished to help insert Revision 6 into the Comanche Peak Steam Electric Station TRM. A l

, description of this revision is provided in Attachment 2 of 1xx 91323. dated  ;

. September 6. 1991. l Discard the old sheets and insert the new sheets, as listed Lielow, Keep these -!

instruction sheets in the front of the Effective Page listing to serve as a .)

record of changes. _{

[

Remp_y.g lukcLt I itction 3 f

3 3 thru 3 1 3 3 thru 3 7 39 39 i i

I LiL L g L ELLctLiy d uet i

[

i EPL 2 EPL 2 i e

.l, i

I i

h h

I i

i

, i ILQ1M(AL_hlQUIREMENT 3.1 [

SNOBBEM TESTS /INSf[CTIONS  !

i TR3.1 Each snubber shall be demonstrated OPERABLE by performance of  !

the following augmented inservice inspet. tion program in lieu of the ,

requirements of Technical Specification 4.0.5. ,

a. inspection Tvoes As used in this specification, type of snubber shall mean snubbers  !

of the same design and manafacturer, irrespective of capacity.

l

b. Visual Inspections Snubbers are categorized as inaccessible or accessible during 1 reactor operation. Each of these groups (inaccessible and 5 accessible) may be inspected independently according to the ,

schedule determined by the table below. The visual inspection '

interval for each type of snubber shall be determined based upon i the criteria provided in the table and the first inspection interval determined using this criteria shall be based upon the ,

previous inspection interval as established by the requirements in effect before this revision.

NUMBER OF UNACCEPTABLE SNUBBERS 5  !

Population Column A Column B Column C 5 or Category Extend Interval Repeat Interval Reduce Intervel 5 (Notes 1 & 2) (NQtes 3 & 6) (Notes 4 & 6) (N2tes 5 & 6) 5 1 0 0 1 5 80 0 0 2 5  :

100 0 1 4 5 5

150 0 3 8 5 l 200 2 5 13 5 300 5 i; 25 5 '

5 400 8 18 36 5 500 12 2' 48 5 -

. 750 20 40 78 5  !

l 1000 or greater 29 56 109 5  ;

5  ;

Note 1; The next visual inspection inteeval for a snubber 5 population or category size shall bi determined based upon the previous inspection interval and tra iumber of unacceptable snubbers found during tc3t .nterval, i

COMANCHE PEAK - UNIT 1 3-3 REVISON 5 September 6,1991

_ - . _ _ ___ ._ _ _ __ .~. _ _ - ___._ _ _ __ __

i i L

TECHNICAL. REQUIREMENT 3.1 (continued) 5 l TESTS / INSPECTIONS (Continued) {

f Snubbers may be categorized, based upon their 5 -

accessibility during power operation, as accessible or l inaccessible. These categories may be examined separately or jointly. However, the licensee must make and document that decision before any inspection and shall use that decision as the basis upon which to determine the .

next inspection interval for that category. j Note 2: Interpolation between population or category sizes and the 5 l number of unacceptable snubbers is permissible. Use next {

lower integer for the value of the limit for Columns A, B,  !

or C if that integer includes a fractional value of l unacceptable snubbers as determined by interpolation.  ;

t Note 3: If the number of unacceptable snubbers is equal to or less 5 l than the nuniber in Column A, the next inspection interval i may be twice the previous interval but not greater than 48  :

months. [

Note 4: If the number of unacceptable snubbers is equal to or less 5  !

than the number in Column B, but greater than the number  !

in Column A, the next inspection interval shall be the  !

same as the previous interval.

Note 5: If the number of unacceptable snubbers is equal to or 5 greater than the number in Column C, the next inspection interval shall be two-thirds of the previous interval.

However, if the number of unacceptable snubbers is less than the number in Column C but greater than the number in Column B, the next interval shall be reduced proportionally be interpolation, than is, the previous interval shall be reduced by a factor that is one-third of the ratio of the difference between the number of unacceptable snubbers found during the previous ifiterval and the number in Column B to the difference in the numbers in Columns B and C.

Note 6: The provisions of Specification 4.0.2 are applicable for 5 all inspection intervals up to and including 48 months.

l l

l l C0HANCHE PEAK - UNIT 1 3-4 REVISION 5

September 6,1991 i ..

e I

t

+

I TECHNICAL _Ri@JREMENT_LJ_{ continued) f SNUBBERS [

TESTS / INSPECTIONS (Continued) l

c. y_isyn1 Inspection Acceptance Criteria i Visual inspections shall verify that: (1) there are no visible [

indications of damage or impaired OPERABILITY, (2) attachements to l the foundation or supporting structure are secure, and (3)  !

fasteners for attachment of the snubber to the component and to l the snubber anchorage are secure. Snubbers which appear  ;

inoperable as a result of visual inspections may be determined i OPERABLE for-the purpose of establishing the next visual inspection interval, provided that: (1) the cause of the rejection is clearly established and remedied for that particular r snubber and for other snubbers irrespective of type that may be generically susceptible; or (2) the affected snubber is ,

functionally tested in the as-found condition and determined  !

OPERABLE per Test / Inspection TR3.lf. All snubbers connected to an {

inoperable common hydraulic fluid reservoir shall be counted as [

inoperable snubbers, j

d. Transient Event inspection  !

An inspection shall be performed of all snubbers attached to  !

sections of systems that have experienced unexpected, potentially l damaging transients as determined from a review of operational data. A visual inspection of those systems shall be performed l within 6 months following such an event. In addition to  ;

satisfying the visual inspection acceptance criteria, freedom-of- i motion of mechanical snubbert. shall be verified using at least one l of the following: (1) manually induced snubber mo dment; or (2) evaluation of in-place snubber piston setting; or (3) stroking the i mechanical snubber through its full range of travel.

  • I h

I L

i COMANCHE PEAK - UNIT 1 3-5 September 6,1991 L

i .  ;

)

JECHNICAL R.10VIREMENT 3.1 (continued)

SNUBBERS TESTS / INSPECTIONS (Continuedl

e. Functional Tests During the first refueling e.hutdown and at least once per 18  !

months thereafter during shutdown, a representative sanple of  :

snubbers of each type shall be tested using one of the following ,

sample plans. The sample plan for each type shall be selected prior to the test period and cannot be changed during the test period. The NRC Regional Administrator shall be notified in  ;

writing of the sample plan selected for each snubber type prior to the test period or the sample plan used in the prior test period ,

shall be implemented:

  • I
1) At least 10% of the total of each type of snubber shall be l functionally tested either in-place or in a bench test. For  ;

each snubber of a type that does not meet the functional test  ;

acceptance criteria of Test / Inspection TR3.lf, an additional  :

10% of that type of snubber shall be functionally tested until no more failures are found or until all snubbers of that type have been functionally tested; or

2) A representative sample of each type of snubber shall be functionally tested in accordance with figure 3.1-1. "C" is the total number of snubbers of a type found not meeting the acceptance requirements of Test / Inspection TR3.lf. The cumulative number of snubbers of a type tested is denoted by "N". At the end of each day's testing, the new values of "N" and "C" (previous day's total plus current day's increments) shall be plotted on Figure 3.1-1. If at any time the point plotted falls in the " Accept" region, testing of snubbers of that type may be terminated. When the point plotted lies in 5 the " Continue Testing" region, additional snubbers of that type shall be tested until the point falls in the " Accept" region, or all the snubbers of that type have been tested.

COMANCHE PEAK - UNIT 1 3-6 REVISION 5 September 6,1991 l-

_ . _ - - - _m-. _ . _ _ . _ . - _ _ . _ . . _ _ _ _ _ . _ _ _ _ _ _ _._ __.-_ _ _.

t TECHNICAL REQUIREMENT 3.1 (can11nprd)  !

~

SNUBBERS TESTS / INSPECTIONS (Continued)_.

i

f. Functional Test Acceptance Criteria l

The snubber functional test shall verify that:

1) Activation (restrainir.g action) is achieved within the ,

specified range in both tension and compression; ,

2) Snubber bleed, or release rate where required, is present in  !

both tension and compression, within the specified range;  ;

3) for mechanical snubbers, the force required to initiate or [

maintain motion of the snubber is within the specified range  !

in both directions of travel, L 5 i Testing methods may be used to measure parameters indirectly or  !

parameters other than those specified if those results can be }

correlated to the specified parameters through established  ;

methods. [

g. Functional Test failure Analysis

[

t An engineering evaluation shall be nade of each failure to meet the functional test acceptance criteria to determine the cause of the failure - The results of this evaluation shall be used, if applicable, in selecting snubbers to be tested in an effort to determine the OPERABILITY of other snubbers irrespective of type  :

which may be subject to the same failure mode.  !

I r

f F

?

t CDMANCHE PEAK - UNIT 1 3-7 REVISION 5  :

September 6,1991

4 TECHNICAL REQUIREMENT 3.1 (continued) 10 9 -

8 7

6 -

C 5 -=

4 ---

3 CONTHE TEllTING g.v ACC EPT 4

1 rv 0

l 10 20 30 40 50 60 70 80 90 100 N

Figure 3.1 !

Sample Plan 2) for Snubber Functional Test REVISION 5 COMANCHE PEAK - UNIT 1 39 September 6,1991 l

p

r TECHNICAL REQUIREMENTS HANUAL [

t EFFECTIVE PAGE LISTING i Sec. 2 Original j 2-1 July 21, 1989  ;

2-2 July 20, 1990  !

2-3 July 21, 1989 l 2-4 July 21, 1989  !

2-5 Revision 2 l 2-6 July 21, 1989 2-7 July 21, 1989 l 2-8 July 21, 1989 L 2-9 July 21, 1989 f 2-10 July 21, 1989 l 2-11 July 21, 1989  !

2-12 Revision 3 2-13 Revision 4 l 2-14 November 12, 1990 . .i 2-15 November 12, 1990  !

2-16 November 12, 1990 l 2-17 November 12, 1990 l 2-18 November 12, 1990 >

2-19 November 12, 1990 l 2-20 November 12, 1990

~

2-21 November 12, 1990 2-22 November 12, 1990 i 2-23 November 12, 1990 i 2-24 November 12, 1990 2-25 Revision 4  !

2-26 November 12, 1990 Sec. 3 Original 3-1 July 21, 1989 3-2 July 21, 1989 3-3 Revision 5 3-4 Revision 5 3-5 September 6, 1991 3-6 Revision 5 3-7 Revision 5 3-8 July 21, 1989 3-9 Revision 5 3-10 July 21, 1989 3-11 July 21, 1989 3-12 Revision 3 3-13 Revision 2 I:

l l

EPL-2 September 6, 1991