ML20082Q005

From kanterella
Jump to navigation Jump to search
Amend 18 to License DPR-22,increasing Allowable Deviation in Trip Setpoint of Temp Switches in Main Steamline Tunnel from 2 to 10 F
ML20082Q005
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 11/28/1983
From: Vassallo D
Office of Nuclear Reactor Regulation
To:
Northern States Power Co
Shared Package
ML20082Q010 List:
References
DPR-22-A-018 NUDOCS 8312090276
Download: ML20082Q005 (4)


Text

..

.*diTED STATES WT E 1.0. RE3ULATCRY COT.R11S?!CN

~

' a $W.GTCN. %.:. ;C555 NORTHERN STATES 90WER C0" PAN _Y DOCKET NO. 50-263 MONTICELLO NUCLEAR GENERATING PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.18 License No. DPR-22 1.

The'ifoclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Northern, States Power Company

-(the licensee) dated September 24,1982,.as. suppl emented February 7,1983, complies with the standards and require-ments of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's rules and regulations set forth in 10 CFR ~ Chapter I; B.

The facility will' operate in conformity with the application, the provisions of the Act, and the rules and regulations g

of the Commission; l

C.

There.is reasonable assurance (i) that the activities authorized by this amendment can be conducted Qi'tTout endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's requirements; l'

D.

The issuance of this amendment will not be inimical to the common l

defense and. security or to th'e health and safety 'of the public; and E.

The issuance of this amendment is in accordance with 10 CFR f

. 'Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical

~ Specifications as indicated in the attachment to this license amend-ment, and paragraph 2.C.2 of Facility Operating License No. DPR-22 is hereby amended to read as follows:

~~

2.

Technical Specifications The Technical Specifications contained in Appendix A as revised

~

through Amendment No. 18 are hereby. incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

~

8312090276 831128 PDR ADOCK 05000263.

P PDR

~

3.

This license amendment is effectiva as of the date of the issuance.

FOR'THE N CLEAR REGULATORY COMMISSION Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing

Attachment:

Changes to the' Technical-Specifications Date of Issu:ance: November 28, 1983

  1. we ##

4 6

m n

6 e

h

ATTACHMENT TO LICENSE AMENDMENT NO.18 FACILITY OPERATING LICENSE NO. DPR-22 DOCKET NO. 50-263 P.eplace the foll.' wing pages of the Technical Specifications with the o

enclosed pages.

The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.'

Remove Insert 70 70 9

t we#

4 i

e 2

i e

O

Table 3.2.7 Trip Manctions And Deviations Trip h nation Deviation j

IIeactor hilding Ventilation Isolation and,.

Ventilation Plerase

.2 Mr/Hr Standby Oss Treatment Byates Inittetton ihalation Honitore Dpecification 3 2.E.3 and % ble 3.2.Il Hefu ding Floor IIcstation Honitore

  • $ Mr/llr

.[m fleactor Water level 6 inchee Illah Drywell Pressure 4 1. poi Primary conteirament Isolation nanotions Im Im Water level

-3 inches

~

hble 3 2.1 Nigh Flow in Hain Steam Idne 42 %

+1d*F liigh %sup. in Hein Steam.

Idne Turumi Im Pressure in Main Steam

-10 pet.

Um Ifigh Drywall Pressure il pal 4

Iow Ilesctor Wter level 6 inchee IIPCI liigh Steam now 47,500 lb/lu.

IIPCI Steam 11ne Ares Kish 42 F hop.

[

RCIC liigli Stsaan now 42250lb/hr ItCIO Steam I.ine Ares *lligli %sp 42*F

~

i 70-3.2 MSES Amendment No. 18

.