ML20082P565
| ML20082P565 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 11/22/1983 |
| From: | Gerrets T LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 42R1, W3K83-1830, NUDOCS 8312090071 | |
| Download: ML20082P565 (2) | |
Text
-_-_
l Louisiama POWER & LIG HT/Waterford 3 SES/P. O. Box B/Killona, LA 70066
$1L[ TIN SYS November 22, 1983 W3K83-1830
_ _Q-3-A35.07.42R1
[kb(
r j ;i:
Y. OJ :
Mr. John T. Collins
- 11 { g l JgT3 Regional Administrator, Region IV t
U. S. Nuclear Regulatory Commission (j,(;i____
611 Ryan Plaza Drive, Suite 1000
?
Arlington. Texas 76012
~~~^
i
REFERENCE:
LP&L Letter W3K83-1591 dated October 19, 1983
Dear Mr. Collins:
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 42R1 "HMA Auxiliary Relays" Interim Report The above referenced letter indicated submittal of a Final Report to the USNRC on November 22, 1983.
At the present time, the documentation review is scheduled to be completed by early December 1983.
A Final Report will be submitted to the USNRC on December 16, 1983.
Very truly yours, h
ggt. F. Cerrets Quality Assurance Manager TFG:CNh:SSTC cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8312090071 831122 PDR ADOCK 05000382 S
PDR 3-E41 ll0
g e.
Mr. John T. Collins November 22, 1983 W3K83-1830 Page 2 cc: Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.;
20555 Mr. E. L. Blake Shaw, Pittman, Potts, & Trowbridge 1800 M Street, N.W.-
-Washington, D.C.
20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130
.-