ML20082P471

From kanterella
Jump to navigation Jump to search
Rev 2 to 1012.003, Solid Radwaste Mgt Process Control Program for Arkansas Nuclear One,Units 1 & 2
ML20082P471
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 06/12/1991
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20082P460 List:
References
1012.003, NUDOCS 9109100340
Download: ML20082P471 (8)


Text

- - - . ._- _ . - _ - . .

. o . - - a f h erat ons ERGY OPERATIONS INCORPORATED ARKANSAS NUCl. EAR ONE PROC / WORK PLAN REV.

TITLE SOLID W MANAGEMENT PROCESS

  • CONTROL PROGRAM FOR ANO UNITS 1 & 2 NO. 1012.003 2 P.

SAFETY.RELATED DT

, gg YES NO C g Page 1 of 1 Page Rev Chg Pago Rev Chg { Page Rev Chg Pago Rev Chg 1 2 >

2 2 l FOR INFORMATION ONLY 4 2 .

5 2 6 2 7 2 9

l i

1

!!P2288s 3!88831a FO R INFORMATION ONLY R PDR Approval Authority: Approval Date: c, 2/f /'

Q</.;q/ ,.e,7 Required Effoetivo Date:'

FOR/ TITLE [ NEV.

LIST CF AFFECTED PAGES FORM NO. 1000.006 A 3

O  !

~

'. ' KJQCsWORK PLAN NO.

'gw E nt ergr ARKANSAS NUCLEAR ONE ins, nn3 ggg g SERIES TITLE: PROCEDURL' WORK PLAN TITLE: P GE:

1 of 7 HP KCLID RW MANAGEMENT PROCESS egg'NGE: 2 ADMfH l'nMTDof. rnndDiM FnD 1Mn ffMitt i t 9 l

l 1. 0 ruaroSr FOR INFORMATION ONLY l

The purpose of this procedure is to delineste the Solid Radioactive Waste  ;

Hanagement Process Control Program for Arkansas Nuclear One Units 1 and 2. '

)

('2.0 SCOPE 2.1 The scope of this procedure'is to describe the policies to be followed  ;

for the safe handling and disposal of solid radioactive waste. '

2.2 This procedure contains requiremente for assessing conformance with the- -

Unit's 1-& 2 Technical Specifications Limiting Conditions for Operations (LCO).

2.3 This. procedure satisfies the requirements of the following Technical-Specification surveillances: Unit 1 - 4.29.4 and Unit 2 - 4.11.4. '

3.0 REFERENCES

3.1 References used in developing this procedure 3.1.1 Title 10 of the Code of Federal Regulations ,

3.1,2 NUREG-0472 and 0473 3.1.3 Units.1 Technical Specifications - 3.25.4, 4.29.4, 6.5.2.7.J '

and 6.5.2.8.J. l 1

3.1.4 . Unit 2 Technical Specification - 3/4.11.4 3.2 References used-to implement this procedure 3.2.1 1603 series procedures', " Radioactive Waste Control-

3.3 Related ANO procedures:-

Hone 3.4 Regulatory correspondence containing MRC commitments which are implemented-in this procedure include:

~

None 4.0 DEFINITIONS None FOR INFORMATION ONLY

-5 *.,-.Ms.v.=-wir_p' ,..=_,.c%y. *, - y-r,', gm., ....E. W

_ ,_ y __.._ _ _ . .

s * *

' ' Pr.Op..WOHK PLAN NO.

ARKANSAS NUCLEAR ONE

'gw Entergy in n nns i

g ggg SERIES TITLE: PROCEDURE. WORK PLAN TITLE: PAGE:

2 of 7

Y HP OLID RW NANAGEMENT }HOCESS ggggg', 2 ADMIN CONTROL PROGRAM FOR ANO UNITS 1 4 ?

R i 5.0 EESPONSIBILITIES NFORMATION ONty 5.1 The Manager of Radiation Protection /Radwaste has overall responsibility for Solid Radioactive Waste activities. ,

I f

5.2 The Hanager of Radiation Protection /Radwaste is responsible for the '

implementation of this procedure.

5.3 The Manager of Radiation Protection /Radwaste is responsible for developing  !

procedures to implement the requirements of this procedure. '

l6.0 INSTRllCTIONS 6.1 Procedures s'a11 h be developed, approved and implemented covering the activities and requirements of 1012.003, Attachment A, " Process Control Program." .-

7.0 ATIAQltiENTS AND E0Pji.i 7.1 ATTACHMENTS 7.1.1 Attachments A, " Process Control Program" 7.2 FORMS 7.2.1 None

?

t f

f 0

f

~

L

,- ..~ . - . . - . - - . . - ... ~. . - .. -- .. . . . _ _ , , . - , ,.

t 0 e f

PROCAVORA PLAN NO.

ARKANSAS NUCLEAR ONE  :

gw Entergy 1012.003 gg SERIES TITLO PHOCEDURE WORK PLAN TITLC PAGE: 3 of 7 HP SOLID RW HANAGEMENT PROCESS REV-2 ADMIN CHANGE CONTROL PROGRAM FOR ANO UNITS 1 & 2 ATTACHMENT _A PROCESS CONTROL PROGRAM

/

GEERAL POLICY STATEt1ENT Entergy Operations' policy on Solid Radioactive Waste is to conscientiously apply  ;

emphasis and attention to those activities involved in the Solid Radioactive Waste .

Management program at Arkansas Nuclear One to maintain a high level of arsurance that radioactive waste products are properly processed, packaged, and shipped in ,

such a manner as to meet or exceed applicable federal and state regulations and '

Radioactive Waste Burial Site License Criteria. -

l I. PURPOSE ,

, l The purpose of the Process Control Program (PCP,) is to define the necessary .

program guidance used at Arkansas Nuclear One to ensure that Solid Radioactive  !

Waste-Management activities result in solid waste products meeting the t criteria contained in the Code of Federal Regulations, State Regulations and r Radioactive Waste Burial Site License Criteria for Solid Radioactive Waste shipment and disposal.

?

II. WET WAS1E -

r A. Liquid Wet Waste  !

Liquid wet wastes at Arkansas Nuclear One are processed by the Radioactive Waste Management program to .i condition meeting Jhipping and disposal criteria on Free Stat ung Water (FSW). Specific instruc-

tions on processing and reau! Nd FSW limits are contained in plant approved procedures.and/*;r qualified vendor procedures approved by Arkansas Nuclear One.

B. CDDL1 1ners, Shineina Casks and Packacina -

i Solid Radioactive Waste is processed, packaged, and shipped in -

accordance with Arkansas Nuclear One approved procedures and/or l qualified vender procedures which have been approved by Arkansas  ;

Nuclear One. These procedures provide specific instructions which ensure the containers,~ shipping casks and packaging methods comply with applicable Code of Federal Regulations, State Regulations and Radioactive Waste Burial Site criteria.  !

l FOR INFORMATION ONLY

o 8 e

' PnOCrWOH4 e LAN NO.

a ARKANSAS NUCLEAR ONE E Entefgy PROCEWRWORMAh WE; m2m SERhS HRE: PAGE: 4 og 7 OEcrations HP SOLID RW MANAGEMENT Proct.SS R EV.

2 ADMIN CHANGE:

CONTROL PR00 RAM FOR ANO UNITS 1 & 2 C. Shionina and Digposat FOR INFORMATION ONLY Solid Radioactive Waste is prepared, loaded and sh2pped to a Feder-J and/or State Licensed Radioactive Waste Disposal Facility (Burial Site) in accordance with Arkansas Nuclear One approved procedures and/or qualified vendor procedures which have been approved by Arkansas Nuclear One. These procedures provide specific instructions which ensure the shipments meet the intended Burial Site License Requirements as well as applicable federal and state regulations. '

D. Laboratory Mixina of Samoles Qualified vendor procedures approved by Arkansan Nuclear one provide written instructions on sample processing and handling to determine process parameters prior to actual solidification.

Included in these procedures is a description of the laboratory mixing method used for these samples. ,

E. 191Mification Process Qualified vendors utilized by Arkansas Nuclear One for radioactive ,

waste solidification are required to provide a Proce:s Control i Program and written procedures approved by the vent and subse- l quently approved by Arkansas Nuclear One prior to use. Included '

in these documents are:

1. A description of the Solidification Process
2. Type of Solidification agent used .
3. Process control parameters
4. Parameter boundary conditions

, 5. Proper waste form properties 1

6. Specific instructions to ensure the systems are operated within established process parameters F. S_gaplin2_Procram for_ Solidification l

Vendors utilized by Arkansas Nuclear One for radioactive waste solidification are required to include in their approved procedures requirements to sample at least every tenth batch to ensure solidi-fication and to provide actions to be taken if a sample fails to verify solidification. These procedures are approved by Arkansas l Nuclear One prior to use.

G. Free Standina Water (FSW)

F0ft INFORMATION ONLY  ;

I Vendorr, utilized by Arkansas Nuclear One to process wet wastes are required to include in their approved procedures provisions to verify that the FSW Criteria in federal'and state regulations and Burial Site License criteria are met for the specific type of waste being processed. These procedures are approved by Arkansas

!!uclear One prior to use.

~ , -

o a .

l!

Pt.OC, WORK PL.AN NO. !I gw Entergy ARKANSAS NUCLEAR ONE '

l

. inte ans 'l g4g SERIES TITLE: PROCEDURE WORK PLAN TITLE: GE: $ og 7 l HP LOLID RW HANAGEMENT FROCESS 2 CHANGE: I A M i tj fMTn nf. PRMR AM FnR Afin f fff f TS 1 & 9 t i

H. Corrective Actions for Free Standinc Water fFSW Oggn Vendors utilized by Arkanses Nuclear One to process wet wautts are required to includ' 1 their approved procedures provisions Og y -

for correcting ptocesse varte in which free standing water in .

excess of FSW Criteria is detected. These procedures are' approved  !

by Arkansas Nuclear One prior to use. i

1. Exothermic Processes f Vendors utilized by Arkansas Nuclear One for radioactive waste  ;

solidification are required to include in their approved proce- l dures specific process control parameters for exothormic solidi-fication methods that must be met before capping the container. I These procedures are ' roved by Arkansas Nuclear One prior to use, r

III. OILY WASTE A. 011y wastes _at Arkansas Nuclear One are processed in accordance with approved plant procedures. These plant procedures specify the proper methods to treat oily waste to comply with the [

criteria in the Code of Federal Regulations, State Regulations l and applicable Burial Site License Requirements. '

t IV. SKETCHES AND DRAWINGS i Ark msas Nuclee- One utilizes vendors for wet waste processing. Vendors j are required by Arkansas Nuclear One to provide TopicaJ Reports or

~

equivalent documents sufficient to allow the necessary approvals of (

their process to the Nuclear Regulatory Commission and Arkansas Nuclear one prior to use of their processing system at Arkansas Nuclear one.

Sketches and drawings of the processing systems currently used at -,

Arkansas Nuclear One are contained in Topical Reports previously ii submitted to the Nuclear Regulatory Commission.  :

v. SvECru. CASES FOR INFORMATION ONLY 'I i i Based on previous industry experience, Arkansas Nuclear One foresets the potentiel for situations arising that may be beyond existing plant  ;

capabilities. Anticipating this possibility, provisions are made  !

herein to accommodate such situations in a timely manner by using  ;

special techniques or processes. These special cases would be con- .

trol)ed as follows: i i

A. Implementing procedures would be developed. comparable to those [

used for normal plant solid waste activities based on the t guidance of this PCP and incorporating the applicable pro-  ;

visions for process control and testing.

~+.-,-ow -~.-.-.,---,.,.,,,--e- -m a ,mc ,-. - - - - r -er-,,,myw,v=- ,,,

o a PH0,c. WOHK PLAN NQ4 ARKANSAS NUCLEAR ONE g2.2Entergy tot u na sonics TITLE: PnOCcDUREWORK PLAN TITLE: PAGE:

Opefat tons NEV; 6 of 7 HP 00 TID RW MANAGEMENT PROCESS CHANGE:

2 ilt ADMIN CONTRot PROGRAM FOR ANO t/ NITS 1 & 2 ]

D. The implementing procedures would be subjected to reviews by  !

the Plant Safety Committee (PSC).

J C. A recommendation would be made to the Arkansas Nuclear One Manager of Radiation Prottetton/Radwaste for approval of the I work to be performed by the procedure and his approval granted.

D. Use of this provision and supporting information included in  ;

LF s next. ,lolid Radioactive Waste report described in Section i_

VIID. .

v1. Av.RA FOR INFORMATION ONLY Solid Radioactive Waste Management activities at Arkansas Nuclear One are conducted in accordance with the plant ALARA Manual and ALARA implementing procedures.

VII. ADMINISTRATIVE CONTR0tS A. R11ppnsibilities The Arkansas Nuclear One Manager of Radiation Protection /Radwaste has overall responsibility for Solid Radioactive Waste activities at Arkansas Nuclear One. The specific plant personnel responsible for the various activities involved in processing, packaging and shipment.

of radioactive waste material are identified by job functions in plant administrative procedures.

B. Quality ALEurAatt Reviews of Solid Radioactive Waste activities at Arkansas Nuclear One are performed at least once per 24 months by Arkansas Nuclear one Quality Assurance. The results of these reviews are evaluated by Arkansas Nuclear one and Entergy Operations management..

C. Records Solid Radioactive Waste shipment :ecords are developed, reviewed and filed in accordance with Arkansas Nuclear One station procedures.

Specific retention periode for these records are addrersed in the i plant administrative procedures.

FOR INFORMATION ONLY

,d_.._,, ,a_.%.., _._. , , , , , _p..,.. , ,....m, ._...m.y,...w%r .

'm

'~d: Entenyt ARKANSAS NUCLEAR ONE mitce3 PROCEDURE. WORK PLAN 111LE: PAGE:

Opefat ons SERIES TITLE:

7 of 7 HP iOLID RW MANAGEMENT PROCESS C ANGE: 2 ADMIN CONTROL PROGR AM rnR AtIn tfutt. 1 7. 9

o. . ,u FOR INFORMATION ONI.Y Information on Arkansas Nuclear One Solid Radioactive Waste shipped offsite is reported semi-annually to the Nuclear Regdlatory Commis-
  • sion. Information reported includes:

k

1. Container volume
2. Total curie quantity and method of determination (measurement ,

or estimate) [

3. Principal radionuclides and method of determination (measur~e- I ment or estimate)
4. Type of waste (e.g. spent resin, DAW, etc.)
5. Type of container (e.g. LSA, Type A, Type B, Large Quantity)
6. Solidification agent (e.g. cement, envirostone)  !
7. Supporting documentation of changes to the Process Control i

( Program, and special cases. - I l E. trumm .

Procedures are written, approved, and implemented covering the activities and requirements addressed in this Process Control Program.

F. Changes to the Process Control Prograa Changes to the Process Control Program are made as follows:

1. The change is properly described in the proposed revision a

and submitted to the Arkansas Nuclear One Plant safety Committee (PSC) and Safety Review Committee (SRC) for review.

Sufficient information is provided with the proposed revision to support the rationale for the change.

2. Upon completion of the review, if the PSC and SRC determines that the change does not reduce the overall conformance of the Solid Radioactive Waste program to existing criteria for solid waste, the PSC and SRC documents that the change has been reviewed and recommends approval.
3. The change becomes effective upon approval by the Arkansas Nuclear One Manager of Radiation Protection /Radwaste.
4. The change to the Process Control Program and the supporting documentation are included in the next Solid Radioactive Waste report to the Nuclear Regulatory Commission described in Section VIID above.

FOR INFORMATION ONLY l

- _ _ _ - _ - _ _ _ - - - -