ML20082P176
| ML20082P176 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/28/1983 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20082P181 | List: |
| References | |
| NUDOCS 8312080121 | |
| Download: ML20082P176 (1) | |
Text
..
e Milling Addrxs Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081
~w F. L Clayton, Jr.
Me3 g 4 h. g7 AlabamaPower Senior Vice President Flintridge Building o
the souttnen cextric s, stem November 28, 1983 9
0 Docket No. 364 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II 101 Marietta Street, N.W.
)
Suite 3100 At.ianta, Georgia 30303
Dear Sir:
Joseph M. Farley Nuclear Plant, Unit 2, Licensee Event Reports Nos.
LER 83-052/03L-0, LER 83-053/03L-0, LER 83-054/03L-0, LER 83-055/03L-0, LER 83-056/03L-0 and LER 83-057/03L-0 are forwarded with three (3) copies of each in accordance with FNP Technical Specification 6.9.1.13 to provide thirty (30) days written notification of the occurrences.
If you have any questions, please advise.
Yours very truly, I
g 9
F
.Nlayto J r.
FLCJ r/KWM:nac/F-6 Enclosures xc: Director, IE (30 copies)
Director, MIPC (3 copies) hDX05000348 21 3312pg S
r* IfICin! D bl'Y PDR j
Sa n
{
-J