'Af Telephone (412) 393-6000 Nuclear Division P.O. Box 4 SMppingport, PA 15077-0004 November 22, 1983 United States Nuclear Regulatory Commission Director of Nuclear Reactor Regulation Attn: Mr. Steven A. Varga Operating Reactors Branch No.1 Division of Licensing l'ashington, DC 20555
Reference:
Beaver Valley Power Station Unit No.1 Docket No. 50-334, License No. DPR-66 Reactor Containment Building Integrated Leak Rate Test Report Gentlemen:
Enclosed is the 1983 Reactor Containment Building Integrated Leak Rate Test report, submitted in accordance with 10 CFR 50 Appendix J.
This report provides a technical summary of the BVPS-1 Type B and C tests completed during the months of August and September of the 1983 refueling outage.
The test results justify our conclusion that since the combined leakage rate of all penetrations and valves subject to type B and C testing is below the Technical Specification limit of 0.6 La, that containment penetration leakage is acceptable.
Very tr ly yours,
. Carey Vice President, Nuclear Attactment cc: !!r. W. H. Troskosxi, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Commission c/o Document Management Branch Washington, DC 20555 Director, Safety Evaluation & Control Virginia Electric & Power Company P. O. Box 26666
\\q One James River Plaza Richmond, Virginia 23261
{\\
8312080039 031122 PDR ADOCK 05000334 P