ML20082M891
| ML20082M891 | |
| Person / Time | |
|---|---|
| Site: | Washington State University |
| Issue date: | 11/15/1983 |
| From: | Wilson W WASHINGTON STATE UNIV., PULLMAN, WA |
| To: | Scarano R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML20082M883 | List: |
| References | |
| NUDOCS 8312060321 | |
| Download: ML20082M891 (1) | |
Text
i WASHINGTO TATE UNIVERSITY PULLMAN, WASHINGTON 99164 1300 NUCLEAR RADIATION CENTER November 15, 1983 m&
Mr. Ross A. Scaranc, Director G
g-Division of Radiological Safety y
y@
and Safeguards Programs g
gg N
.g U.S. Nuclear Regulatory Commission 3
-n Region V
'n 1450 Maria Lane, Suite 210
' f.9 Walnut Creek, California 94596 g
Dear Mr. Scarano:
In accordance with the agreement reached during a recent conference telephone call between members of your staff, myself, and Reactor Licensing, W.S,U, proposes to rectify the problem relating to the CMi calibration by requesting a change in the W.S.U. facility technical specifications. Specifically, a change to section 4.33 on Radiation Monitoring Systems Surveillance require-ments to specify a " channel check" for the CM1 rather than a full calibration is being requested. The change will more correctly describe the surveillance activities being carried out on the CAM system which licensing agrees are adequata.
Sincerely,
'h W. E. Wilson Associate Director WEW:cfm k KOCK 05000027 O321 831130 0
.