ML20082M703

From kanterella
Jump to navigation Jump to search
Informs of Finding of No Significant Antitrust Changes
ML20082M703
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/18/1995
From: Pembroke J
DUNCAN, WEINBERG, MILLER & PEMBROKE, P.C. (FORMERLY
To: Russell W
Office of Nuclear Reactor Regulation
References
CON-#296-16636 A, OLA, NUDOCS 9504240345
Download: ML20082M703 (3)


Text

-___-_.

/w CALLACE L.OUNCAN EDWAED WEINSERo LamM 1Ru LA&fd SUITE 800 ouNcAN.WriNecRa,matzR a PrusRon JAMESD.PEMBROME cacMuoND r. ALLAN 62o McCANDLES$ TOWERS 16 l S M S TR E ET, N . W. sees rntroom cincte ke L. L Wra WAS H I N GTO N, D. C. 2 OO36 SANTA ctAna,cAtironNiA esos.

Jerracy c.ocNztR (4oei ese-44o4 0 uDesuscH

[c,",7[,"pogt,p ,,,,3,,,,,37 ,

,, _,j TANJA M. SNONKWILER TELECO PY (202) 467-6379 270o stLLEVUC AVENUC

$YRACVSE,NEW YoRM 13tle Or CouwSEL (315) 476-4318 rCCDERICK L. M I L L E R. J R. THoM AS J. LYNCH CICH ARD M. PELZ T of c0UN$rl w AcOLD n. MccOues, JR.

April 18, 1995 t ADMITTED IN WASHINoTON ONLY VIA HAND DELIVERY, TELECOPY AND U.S. MAILS William T. Russell, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C. 20555 Re: River Bend Station, Unit 1; Docket No. 50-458; Finding of No Significant Antitrust Changes

Dear Mr. Russell:

I represent Cajun Electric Power Cooperative, Inc.

(" Cajun"), one of the licensees in the River Bend Station, in the above-captioned proceeding. By letter dated April 5, 1995, and published in the Federal Register on April 10, 1995 (60 Fed. Reg. 18151), you issued your Finding of No Significant Antitrust

! Changes and Time for Filing Requests for Reevaluation. At page three of that letter, you required that any interested person must file a request for reevaluation of such finding within ten days of the publication in the Federal Register, and you further limited such requests to ten pages.

The regulations of the Nuclear Regulatory Commission

("NRC") regarding requests for reevaluation are found at Section 1 2.101 (e) ( 2 ) of the NRC's regulations. 10 C.F.R. S 2.101(e)(2) l (1995). Those regulations provide that requests for reevaluation should be submitted within thirty days of publication of the notice and impose no page limitation.

Due to the significance of this case and, particularly in light of the fact that this case was returned to the NRC for further proceedings on an order issued on its own motion by the United States Court of Appeals for the District of Columbia Circuit, interested persons, including Cajun, should be able to exercise the full panoply of their procedural rights. Your April 5, 1995 Finding which shortens both Cajun's response time and the l 1 6h 0

I 95042A0345 950418 PDR ADDCK 05000458 h

g PDR

f i

permitted length of the requests for reevaluation improperly and illegally limits Cajun's rights in this case.

Cajun respectfully requests that you modify the procedural aspects of your Finding to conform to Section 2.101 (e) (2) of the NRC's regulations and allow Cajun to file its request for reevaluation thirty days after the Federal Register publication on April 10, 1995, and that no page limitation be l imposed.  ;

l Dated: April 10, 1995 Respectfully submitted, l

~

Jq$5s' D. Pembroke l DUNCAN, WEINBERG, MILLER l

& PEMBROKE, P.C.

1615 M Street, N.W.

Suite 800 Washington, DC 20036 (202) 467-6370  ;

Counsel for Cajun Electric Power Cooperative, Inc.

r

, CERTIFICATE OF SERVICE I hereby certify that I have this day served the foregoing document upon each person designated on the official service list in this proceeding by hand delivery, telecopy or U.S. Mail. Dated at Washington, D.C., this 18th day of April

  • 1995.

b Ja Ks D.' Pembroke b DUNCAN, WEINBERG, MILLER  ;

& PEMBROKE, P.C.

1615 M Street, N.W. ,

I Suite 800 Washington, DC 20036 (202) 467-6370 i

l r

f T

I