" VERMONT YANKEE NUCLEAR POWER. CORPORATION Ferry Road, Brattleboro, vT 05301-7002 I
3 g
ENGINEERING OFFICE O v 580 MAIN STREET
' BOLTON, MA 01740
. (508)779-6711 April 17,1995 BVY 95-43 l
l United States Nuclear Regulatory Commission ATTN:
Document Control Washington, D.C. 20555
References:
(1)
License No. DPR-28 (Docket No. 50-271)
I (2)
Letter, VYNPC to USNRC, " Response to NRC Generic Letter 94-i 02 Regarding Stability Interim Corrective Actions and Plans for Implementation of BWROG Long Term Stability Solution Option 1-D at Vermont Yankee, BVY 94-91, September 9,1995 (3)
Letter, VYNPC to USNRC, " Submittal of Vermont Yankee Nuclear Power Station Application of BWROG Thermal Hydraulic Stability Long Term Solution Option 1-D", BVY 93-72, July 7,1993
Subject:
Clarification to Vermont Yankee Response to NRC Generic Letter 94-02, implementation Plans for BWROG Long Term Stability Solution Option 1-D Vermont Yankee's response to Generic Letter 94-02 regarding resolution of the stability issue was provided in Reference 2. The purpose of this letter is to provide j
supplemental information consistent with information presented at our meeting with the NRC staff on February 8,1995.
Reference 2 stated that Vermont Yankee would start Cycle 18 operation.(late April j
1995) using a stability power flow exclusion region updated for Cycle 18 fuel and core j
loading characteristics. As presented in the February 8,1995 meeting, Vermont Yankee will start up with an exclusion region generated for Cycle 15 (Reference 3) and I
an addition of 5% power / flow buffer region. The 5% power / flow buffer region will be j
treated as an exclusion boundary until the stability monitor / predictor is operational.
The monitor / predictor is expected to be fully operational by January 31,1996.
]
This approach is based on a schedule consistent with the availability of the exclusion region calculational procedure. Therefore, in the interim, Vermont Yankee will operate with the exclusion region generated for Cycle 15, including the 5% buffer region. The Cycle 15 exclusion region is applicable for Cycle 18 because the fuel types have not
\\
95o424o298 95o417 i
g
{D DR ADOCK o5oo 1
9
~
VERMONT YANKEE NUCLEAR POWER CORPORATION
,U.S. Nucinr R::guintory Commission April 17,1995 Phge 2 changed and each cycle has similar core loading patterns. It is our intent to update the plant specific exclusion region when the calculational procedure becomes available.
We trust that the information in this letter provides clarification of our plans for implementation of BWROG Option 1-D as a means to long term resolution of the stability issues. Should you have any questions, please contact us.
Sincerely, Vermont Yankee Nuclear Power Corp.
D.A. Reid Vice President, Operations cc:
USNRC Region 1 Administrator s
- 4',7 USNRC Resident inspector, VYNPS s
USNRC Project Manager, VYNPS g ) ',,
G'Dd f;/
y4
["
NOTARY ( "
STATE OF VERMONT q
f WINDHAM COUNTY N
%,4 ll Then personally appeared before me, Donald A. Reid, who, being duly sworn, hh G
4 state that he is Vicp President, Operations, of Vermont Yankee Nuclear Power Corporation, that he is duly authorized tobectie.ar)d Me the foregoing document in the name and on the behalf of Vermont Yankee Nuclear Power Corporation, and th'at this'atern6nJs therein are t
true to the best of his knowledge and belief.
/
wb~
safiy A. Sardstrum, Notary Public My Commission expires February 10,1999 l