ML20082M552

From kanterella
Jump to navigation Jump to search
Fourth Interim Rept Re Significant Const Deficiency 71 Concerning Inadequate Review of Ciwas for Reportability. Initially Reported on 830816.Review of Historical Documentation in Progress.Final Rept by 831222
ML20082M552
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/18/1983
From: Gerrets T
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, 71, W3K83-1791, NUDOCS 8312060182
Download: ML20082M552 (2)


Text

___

O l

Louisiama P OWE R & L1G H T /Waterford 3 SES/P. O. Box B/Killona, LA 70066 MIDDLE SOUTH UTluTIES SYSTEM November 18, 1983 W3K83-1791 Q-3-A35.07.71

~q 7 -

! g. ~

r' h

Mr. John T. Collins Regional Administrator, Region IV M

U. S. Nuclear Regulatory Commission 3'

kN,,

611 Ryan' Plaza Drive, Suite 1000 i

Arlington, Texas 76012

REFERENCE:

LP&L Letter W3I83-0285 dated August 16, 1983

Dear Mr. Collins:

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 71

" Inadequate Review of ClWAs for Reportability" Fourth Interim Report The above referenced letter idicated submittal of a Final Report to the USNRC on November 18, 1983.

The mechanism by which CIWAs will be reviewed for reportability on a permanent basis consists of copies of CIWAs being transmitted to Operations Quality Assurance the working day following their initiation. CIWAs are then screened for reportability and if determined to be potentially reportable a formal evaluation is made and the deficiency reported if within the guidelines of 10 CFR 50.55(e).

At the present time, documentation for the historical review of plant CIWAs is being reviewed to ensure that all CIWAs requiring review for reportability received same. A final report will therefore be submitted to the USNRC by December 22, 1983.

Very truly yours, mm T. F. Cerrets Quality Assurance Manager TFG:CNH:SSTG cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.

20555 8312060182 831118

/.b-PDR ADOCK 05000382 J

S PDR

)

w.

s.. -

Mr. J. T. Collins November 18, 1983 W3K83-1791 Page 2 cc: Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Mr. E. L. Blake Shaw, Pittman, Potts, & Trowbridge 4

1800 M Street, N.W.

Washington, D.C.

20036 Mr. W. M. Stevenson j

Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 I

I i

1 e

f i

't I

i k

I.

4 w.s.ycr,..-,,

_....y,,-,

,s,,, _..,.,

r.,--,

. _ -, --..., -,...-.,,,. - -,..- -,,,-- --, -, --.,,,,