Text
-$
<e utu, f,
t UNITED STATES q
a S
NUCLEAR REGULATORY COMMISSION f
WASHINGTON, D.C. SosaHoo1
%,.....,o ENTERGY OPERATIONS. INC.
SYSTEM ENERGY RESOURCES. INC.
SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION MISSISSIPPI POWER AND LIGHT COMPANY DOCKET NO. 50-416 GRAND GULF NUCLEAR STATION. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 121 License No. NPF-29 1.
The Nuclear Regulatory Commission (the Comission) has found that:
A.
The application for amendment by Entergy Operations, Inc. (the licensee) dated October 12, 1994, comslies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment w' ell not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
9504240249 950417 PDR ADOCK 05000416 P
- 2. Accordingly, the license is amended by changes to paragraph 2.C.(26) of.
Facility Operating License No. NPF-29 is hereby amended to read as follows:
(26) Turbine Disc Intearity (Section 10.2.1, SER, SSER #1)
(DELETED)
- 3. This license amendment is effective as of its date of issuance.
l FOR THE NUCLEAR REGULATORY COMMISSION Paul W. O'Connor, Senior Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
April 17, 1995 i
t
(
i
1 y
ATTACHMENT TO LICENSE AMENDMENT NO. 121 FACILITY OPERATING LICENSE NO. NPF-29 DOCKET NO. 50-416 Replace the following page of the License with the attached page to Facility Operating License No. NPF-29. The revised page is identified by amendment number and contains a vertical line indicating the area of change.
l REMOVE INSERT 10 10 I
t' 1
y+
1 l
(24) Interolant Communication Systems (Section 9.6.1.2, SER, SSER #2, O
SSER #4, SSER #5)
. Tests of the communication systems used to mitigate the consequences of an event and attain a safe plant shutdown shall be completed i
during preoperational and startup tests. An evaluation of the test results shall be provided for NRC review within 90 days after. test :
completion. Any system modifications found necessary as a result of NRC review shall be completed prior tc startup following the.first-refueling outage.
J (25) Reliability of Diesel-Generators (Sections 8.3.1, 9.6.3 through 9.6.7, SER, SSER #2, SSER #4, SSER #6)
(a) Prior to startup following the first refueling outage, a heavy duty turbocharger gear drive assembly shall be installed on all-EMD diesel-generators.
(26) Turbine Disc Intearity (Section 10.2.1, SER, SSER #1) l (DELETED) l (27) Circulatina Water System (Section 10.4.5, SER) l E01 shall not fill the Unit 2 circulating water system (including i
the natural draft cooling tower basin) until Unit I flooding concerns related to this system are resolved to the satisfaction'of the NRC staff.
i (28) Advisor to the Vice President I
MP&L shall have on its nuclear operations staff, one or more corporate management officials or advisors (who may be either permanent employees or contracted consultants) who have substantial-commercial nuclear power plant operating management experience and t
who will advise on all decisions affecting safe operation of the plant.
This requirement shall be in effect until the plant has accumulated at least 6 months at power levels above 90 percent of full power.
i i
I i
I 10 Amendment No. 55,114,121 l
\\
=.
-