Text
i 1-Entr;y OperItlon2,In3.
j ENTERGY ro w sc Port Gibsort t.G 39150 Tel 601437 2900 1
C. R. Hutchinson veo Rescent opeatens Grarc Gaf Near Qaron ApH1 18, 1995 U.S. Nuclear Regulatory Commission Mail Station Pl-37 Washington, D.C.
20555 Attention:
Document Control Desk
Subject:
Grand Gulf Nuclear Station Docket No. 50-416 License No. NPF-29 Appendix J Exemption GNRO-95/00056 Gentlemen:
By this letter we are providing our understanding, concerning the differences between the Grand Gulf proposal and the staff's position on several issues associated with our request for an exemption to the requirements of Appendix J, of 10CFR50. While we do not agree with the Staff's position, we will agree to these changes in order to receive a timely response to our request. As you are aware, GGNS started our refueling outage on April 15 of this year with a scheduled outage duration of 39 days.
Timely issuance of our exemption is therefore, critical to the successful completion of our outage.
Our understanding of the resolution required by the staff for each of the staf f's stated concerns are discussed below.
1.
Two successful tests must be passed before extending the Type A test interval to 10 years.
2.
The surveillance interval for containment general inspection will continue to be required at the frequency of 3 in ten years, approximately equally spaced.
3.
With the exception of electrical penetrations, Type B and C test intervals will not exceed 5 years.
4.
Two successful tests will be required prior to extending the test interval for any Type B or C test.
]
b b f. 7 7 0
9504240153 950418 PDR ADOCK 05000416 if P
PDR I
L
I b
April 18, 1995 GNRO-95/00056 Page 2 of 3 5.
The exemption does not appiv t-MSIVs, Feedwater check valves, or containment vent and purge v4.lves.
6.
If an airlock fails a test, two consecutive successful tests will be performed prior to extending the test interval. The 30 day test is a test of seals only.
We understand that these NRC staff positions may be modified by the proposed changes to 10CFR50, Appendix J.
If, during rulemaking, any of these positions are not reflee:ed in the final rule, we intend to adopt the position established by the rule.
We would appreciate your praw'r ser>ntion and response to facilitate completion of our refueling octric a-2 scheduled.
As always, if we can be of any further assistance, } d e.
- a se be.
Yours truly, CRH/WBB/mte cc:
Mr. Jeff Tedrow Mr. H.
W.
Keiser Mr.
R.
B. McGehee Mr. N.
S. Reynolds Mr.
H.
L. Thomas Mr. Stewart D. Ebneter Regional Administrator U.S.
Nuclear Regulatory Commission Region II 101 Marietta St.,
N.W.,
Suite 2900 Atlanta, Georgia 30323 Mr.
P.
W.
O'Connor, Project Manager Office of Nuclear Reactor Regulation U.S.
Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C.
20555