tw g
0PSEG Public Service Electric and Gas Company P.O. Box 236 Hancocks Bndge, New Jersey 08038 Nuclear Department November 17, 1983 Dr. Thomas Murley Regional Administrator U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406
Dear Dr. Murley:
IE BULLETIN 83-06 NONCONFORMING MATERIALS SUPPLIED BY TUBE-LINE CORPORATION NO. 1 AND 2 UNITS SALEM GENERATING STATION DOCKET NOS. 50-272 AND 50-311 PSE&G has performed the following actions in response to the referenced Bulletin.
Item 1 Review the list of purchasing and receiving companies given in Attachments 2 and 3 and determine if any Tube-Line (T-L) supplied materials have been furnished for your facility.
Response
We have reviewed the list of purchasing and receiving companies given in Attachments 2 and 3 to the Bulletin.
Additionally, we physically checked the mill test reports of vendors of pipe fittings and components to determine the vendor's source.
We have found that the following principal suppliers have provided material furnished by Tube-Line Corporation:
Louis P.
- Canuso, Inc., Capitol Pipe and Steel Company, and Empire Valve and Fitting Company.
Item 2A Provide a list of the T-L supplied materials and identify the systems in which these materials are/will be installed.
Response
A listing of the materials furnished by the above suppliers and the systems in which they are installed is provided in Attach-ment 1.
PDR ADOCK 05000272 h\\\\
831205049s 831117 G
PDR The Energy Peopie iI wwnn
Dr. Thomas Murley, Regional Administrator U.S.
Nuclear Regulatory Commission 11/17/83 Item 2B Implement a program which provides assurance that received materials comply with ASME Code Section III and applicable procurement specification requirements, or which demon-strates that such materials are suitable for intended service.
This program should include specific verifica-tion that received austenitic stainless steels are in a non-sensitized condition.
Response
The materials received through Capitol Pipe and Steel Co. and Louis P.
Canuso Inc. (see Attachment 1) were readily rejected and returned to the vendor for nonconformance.
An engineering evaluation was conducted to verify the integ-rity and suitability of those fittings that are installed in safety-related systems.
(See Attachment 2)
To assure that austenitic stainless steel is procured in the non-sensitized condition, we are currently revising our piping specification to include ASTM 262, Practice A - Oxalic Acid Etch Test.
This test is for detecting susceptibility to intergranular attack in stainless steel.
Item 2C Replace fittings and flanges with materials which have been manufactured in full compliance with ASME Code Section III and the applicable procurement specification requirements.
Response
The PSE&G Engineering Evaluation (Attachment 2) concluded that the material integrity of the subject fittings is well assured.
The certified material test report showed chemical and physical properties within ASTM specification.
Addition-ally, 100% Radiography (RT) and 100% Magnetic Particle Testing (MT) combined with the tensile testing met Nuclear Class 1 material testing requirements.
Item 3 For ASME Code materials furnished by T-L which are 7
installed in safety-related systems in operating plants, the following actions are requested:
a, b, c.
Response
l This action is addressed in 2a, 2b, 2c and Attachment 1 and 2.
l l
1
.,,,,.n e---
r--,
+..m,_,
s e,
,y a-
I Dr. Thomas Murley, Regional' Administrator U.S.
Nuclear Regulatory Commission 3-11/17/83 i
Should you have any questions, please do not hesitate to contact us.
Sincerely, i
E. A.
Lide n Manager - Nuclear Licensing and Regulation Attachment l-CC:
Mr. Donald C.
Fischer Licensing Project Manager Mr. James Linville Senior Resident Inspector U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 i
4 4
is f
i t
i
+
.e-
-,y
.p_.-w..
,,.-,.wwwww-..-,e ga
_.u-ep_.....
-...,-,.,,,,,,..-..--m,.
mm,,-r
,.-,,,,c.y.,-,,.,,,-----._w,y,,--npme,-e.--
,e-w,.,,.
,,.~..y,-
v o'
ATTACliMENT 1 SUPPLIER ITEM DESCRIPTION PURCHASE SYSTEM IS INSTALLED LOCATION OF DISPOSITION REMARKS ORDER NO.
SAFETY RELATED INSTALLATION Capitol Pipe & Steel 2-8* TEE, SCH.40, ASTM A2 34 WPB P2-009018 NA NO NA DR 9 31-02-8 3-155 (10/3/8 TO BE METURNED *
- SE not required since Co. Tube-Line 7-6* TEE SCH 40 P2-009018 NA NO NA TO THE VENunR DISPOSITIONED 10/6/83 this was insta11ed on 1-6* TEE, SCN. 40,(Heat 9 EYPH)
P2-009018 NO YES**
NON SR SYSTEM Non-Safety related system.
(Louis P. Canuso 1-8* X 90* Elbrze ASTM 217979 NA NO NA SEE Rejected and returned to DRG QA-82-091 SCRAPPED vendor Inc.)
A403 TP316L Tube-Li ne 2-10* X 45* Elixn# ASTM A403 217979 NA NO NA TP316L (Capitol Pipe &
82-3/4" Flanges P2-002704 NA NO NA RETURNED TO VENDOR FOR SE Not REQUIRED Steel Co. )
12 1* Flanges P2-003077 NA NO NA NONCONFORMANCE Tube-Line 12-1 1/2" Flanges P2-OO2798 NA NO NA SE not required Non-Safety (Louis P. Canuso 4-4* Caps, Sch. 40, 883865 Inc.)
ASTM A403 WP 304 NO YES NON SR SYSTEM NO ACTION related system Tube-Li ne (Empire Valve 6 1-3* I 90* Ethow ASME 219668 NO m VES NON SR SYSTEM NO ACTION
- SE not required.
Installed on NSR System Fitting Co.)
54420 WPLC, Tube-Lfne Heat Code EOQ 1-3" X 90* Elbow 219668 YES t YES CHILLED WATER MATERI AL ADEQUACY EM AMINED AND VERIFIED. t See Attached Saf ety NO FURTHER ACTION REQUIRED Evaluations ASME SA420 WPLG j
Heat Code EOQ 1
l (Louis P. Canso 2-4* X 3" Reducing TECH. SCH.40 891743 YES YES CHILLED WATER See Attached Safety Evaluation.
Inc) Tube-Line B.W. ASTM A234 WPB 4-3* I 90* Elbow SCH 40 B.W.
891743 YES YES CHILLED WATER AS1M A2 34WPB 1-3* X 45' Elbow, SCH 40 B.W.
891743 YES YES CHILLED WATER ASTM A2 34 WP 2-3* I 2 1/2" COAC. Red. M.W.
891743 YES YES CHILLED WATER ASTM A234 WPB 1-3* M 90* Elbow, Sch. 40 p.W.
891743 NA NO CHILLED WATER USED FOR DESTRUCTIVE TESTING ASTM A2 34 WPd e
A'i l A C H M E N T 2 Page 1 of 2 Date Oct. 19, 1983 Pubhc Service Electnc and Gas Company P O. Box 236 Hancocks Bndge New Jersey 08038 Nuclear Department TITLE: SAFETY EVALUATION OF NONCONFORMING MATERIALS SUPPLIED BY TUBE-LINE SALEM GENERATING STATION UNIT NO. 2 1.0 PURPOSE The purpose of this Safety Evaluation is to document the review of NRC IE Bulletin No. 83-06 on nonconforming materials supplied by Tube-Line and confirm the adequancy of affected components for intended service.
2.0 SCOPE This Safety Evaluation applies to pipe fittings supplied by Tube-Line which are installed in the Chilled Water Piping System, SGS Unit No.
2.
3.0 REFERENCES
a)
NRC IE Bulletin No. 83-06 (attached) b)
Nondestructive Examination Reports (attached) c)
Radiographic Examination Reports (attached) d)
Certified Material Test Report HN-894 (attached) e)
Certified Material Test Report 34414 P-1 (attached) f)
PSE&G Research Corporation RTLR Ns. 67585 (attached) 4.0 DISCUSSION Responding to NRC IE Bulletin No. 83-06 (Ref. 3.a), our investigation revealed that the following fittings were supplied by Tube-Line.
a) 2 each 4"x3" Reducing Tee, Sch.40, B.W.,
ASTM A234 WPB b) 5 each 3"x90*
L.R.
Elbow, Sch.40, B.W.,
ASTM A234 WPB c) 1 each 3"x45' Elbow, Sch.40, B.W.,
ASTM A234 WPB d) 2 each 3"x2-1/2" Concentric Reducer, B.W.,
ASTM A234 WPB e) 1 each 3"x90*
L.R.
Elbow, Sch.40, B.W.,
ASTM A420 WPL6 All the above fittings, except one (1) 3"x90* elbow (Item 4.b above), were installed on safety-related piping components of the Chilled Water System.
To verify the material integrity and suitability of these fittings for the intended service, 100% Radiography (RT) and 100% Magnetic Particle Testing (MT) were performed on three 3" x 90* elbow (Item 4.b), two 3" x 2-1/2" concentric reducer (Item 4.d) and one 3" x 90' elbow (Item 4.e).
E5/7
' 9 E0 9 f'N -
EDD-7 FORM 1 REV O 10 SEPT 81 s E v 12
Pcgo 2 of 2 Doto:
Oct. 19, 1983 Both RT and MT found these fittings acceptable with no inherent defects (Ref's. 3.b and 3.c).
The Certified Material Test Reports (Ref's. 3.d and 3.e) showed chemical and physical properties acceptable to ASTM specification.
Additionally, one 3"x90* elbow that has not been installed was sent to PSE&G Energy Lab for testing (Ref. 3.f) and the tensile requirements were found to exceed those in the material specification, ASME/ ASTM A234 WPB.
5.0 CONCLUSION
AND RECOMMENDATION Based on the above discussion and written report of tests performed, the material integrity of the subject fittings is well assured.
The total ~of seven fittings examined are considered good representatives of the eleven (11) fittings supplied by Tube-Line.
The installed ten (10) fittings will not, in any way, degrade the Chilled Water piping system, which is a Nuclear Class 3 system.
The non-destructive examinations performed (RT and MT) combined with the tensile testing at the Energy Lab, in fact, exceed Nuclear Class 1 requirements.
We recommend that all ten fittings remain in the system.
DCN:cbp ES/7 hf bawrc l0.to 6*b Origin tor Verifier r
Piping, Materials & Stress Group Head Manager - Plant Engineering E DD-7 FORM 1 REV 0 10 SEPT 81
I STATE OF NEW JERSEY
)
)
SS.
COUNTY OF SALEM
)
RICHARD A. UDERITZ, being duly sworn according to law deposes 3
and says:
I am a Vice President of Public Service Electric and Gas Company, and as such, I find.the matters set forth in our response dated November 17, 1983, to IE BULLETIN 83-06
" Nonconforming Materials Supplied by Tube-Line Corporation" are true to the best of my knowledge, information and belief.
2 RICHARD A. UDERITZ 9 Subscribed and sworn to before me this lB" day of Movtynen 1983 ll l