r
.I VINGINIA ELECTHIC AND PownN COMPANY RicIIwoxo,VINGINIA 202 61 W. L. S1r5 WART Vice Paussoeur Nuca. MAN Ora EATIONS November 1, 1983 Mr. Janes P. O'Reilly Serial No: 618 Regional Administrator N0/WDC:aca Region II Docket Nos. 50-280 U. S. Nuclear Regulatory Commission 50-281 101 Marietta Street, Suite 2900 License Nos. DPR-32 Atlanta, Georgia 30303 DPR-37
Dear Mr. O'Reilly:
RESPONSE TO ITEM 4 of IEB 82-02 SURRY POWER STATION Enclosed is the Virginia Electric and Power Company response to Item 4 of-IE Bulletin No. 82-02 (Degradation of Threaded Fasteners in the Reactor Coolant Pressure Boundary of PWR Plants) for Surry Power Station Unit Nos. I and 2.
Pursuant to Section 182a, Atomic Energy Act of 1954 as amended, the information contained in the attached pages is true and accurate to the best of my knowledge and belief.
Very truly yours, W. L. Stewart Enclosure cc:
Mr. S. A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Mr. D. J. Burke NRC Resident Inspector Surry Power Station f
ohgo O
e1 e,
RESULTS OF THREADED FASTENER INSPECTION UNIT 1 EXAMINATION INSPECTION BOLTING MATERIAL METHOD RESULTS I
1.
Reactor Vessel Closure Head Studs (1-10)
Closure Head Nuts (1-10)
VT NRI (removed)
Closure Head Washers (1-10)
VT NRI (removed) 2.
Reactor Coolant Pump I VT, UT, MT NRI No. 1 Seal Housing Bolting (1-12)
(removed) 3.
Reactor Coolant Pump II VT, UT, MT NRI No. 1 Seal Housing Bolting (1-12)
(removed) 4.
Reactor Coolant Pump I and II T. UT, MT NRI on UT & MT 13 out of 48 had Main Flange Bolting (1-24) and visual indications.
(removed)
(1-24)
Three bolts were rejected from use due to structural damage by corrosion. Other bolts were evaluated accept-able for service.
5.
Reactor Coolant Pump III VT, UT, MT NRI No. 1 Seal Housing Bolting (1-12)
(removed) 6.
Tc MOV MOV-1591 (1-12)
EXAMINATION INSPECTION BOLTING MATERIAL METHOD RESULTS 7.
HCV-1557A (1-6)
S/G Manway Bolts S/G A, B C UT NRI (in place)
Bolts were damaged upon renoval.
26 new bolts were installed. All bolts were inspected.
VT - Visual Examination UT - Ultrasonic Examination MT - Magnetic Particle NRI - Non-reportable indication l
l l
RESULTS OF THREADED FASTENER INSPECTION UNIT 2 EXAMINATION INSPECTION BOLTING MATERIAL METHOD RESULTS 1.
Reactor Vessel MT Two with denting.
Evaluation required Closure Head Studs (16, 26, 22, the repair of only (removed) 24-27, 51) one stud.
(21-30, 16, UT NRI 51)
(1-50)
VT NRI Closure Head Washer (1-50)
VT NRI (removed)
One reportable indi-cation.
It was evaluated and returned to service.
Closure Head Nuts (1-50)
VT NRI (removed) 2.
Reactor Coolant Pump III Main Flange Bolting (1-24)
MT, UT, VT Visual marks on 16 (removed) bolts. Evaluated and replaced as required.
No. 1 Seal Housing Bolting (1-12)
MT, UT, VT Three bolts with (removed)
Corosion. Evaluat-ed and replaced as required.
3.
Reactor Coolant Pump I No. 1 Seal Housing Bolting (1-12)
MT, UT, VT Scratches one bolt (removed) evaluated and re-placed as required.
4.
Reactor Coolant Pump II Main Flange Bolting (1-24)
f 2
1 4
EXAMINATION INSPECTION BOLTING MATERIAL HETHOD RESULTS l
5.
Pressurizer Safety Relief Valve SV-2551A VT Valves removed for SV-2551B VT maintenance and SV-2551C VT installed with new (removed) studs. NRI No. 1 Seal Housing Bolting (1-12) i (removed)
VT - Visual Examination UT - Ultrasonic Examination MT - Magnetic Particle j
NRI - Non-reportable indication j
i 1
k s