ML20082J954

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Mar 1995 for Comanche Peak Ses
ML20082J954
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/31/1995
From: Sirois E, Terry C, Walker R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-95095, NUDOCS 9504190013
Download: ML20082J954 (9)


Text

-

e E= ~

Log # TXX 95095 L -

File # 10010.2 5 ---

Ref. # 10CFR50.36 1UELECTRIC

% y,,,, April 13,1995 Grosy Fra PresMrar.Nmeleer i

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) UNITS 1 AND 2 DOCKET NOS. 50 445 AND 50 446 MONTHLY OPERATING REPORT FOR MARCH 1995 Gentlemen:

Attached is the Monthly Operating Report for March 1995, prepared and submitted pursuant to Technical Specification 6.9.1.5 contained in Appendix A to the Comanche Peak Steam Electric Station Units 1 and 2.

Operating License Nos. NPF-87 and NPF 89, respectively.

Sincerely, b -

C. L. Terry By: @

Roger Ef. Walker Regulatory Affairs Manager JMK/jak Attachment c Mr. L. J. Callan, Region IV Mr. D. F. Kirsch, Region IV Resident Inspector, CPSES (1)

Mr. T. J. Polich, NRR 100029

,g4

^

9504190013 950331 [}

PDR ADOCK 05000445 R PDR Energy Plau 1601 Bryan seest Dallas. Texas 75201 3411 k

l  !

I Attachment to TXX-95095 l Page 1 of 8 +

COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT DOCKET NO.: 50-445 UNIT: CPSES 1 l DATE: 04/13/1995 r COMPLETED BY: Ed Sirois TELEPHONE: 817/897-5664 OPERATING STATUS

1. REPORTING PERIOD: MARCH 1995 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (MWe-Net): 1150
  • DESIGN ELECTRICAL RATING (MWe-Net): 1150
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): NONE
4. REASON FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 76 1,492 32,705
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 2,440 i
7. HOURS GENERATOR ON LINE 75 1,491 32,236
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 215,769 5,040,105 103,975,211
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 72,661 1,693,416 34,590,043
11. NET ELECTRICAL ENERGY GENERATED (MWH) 65,763 1,623,417 32,986,864
12. REACTOR SERVICE FACTOR 10.2 69.1 80.6 l
13. REACTOR AVAILABILITY FACTOR 10.2 69.1 86.6
14. UNIT SERVICE FACTOR 10.0 69.0 79.4
15. UNIT AVAILABILITY FACTOR 10.0 69.0 79.4
16. UNIT CAPACITY FACTOR (USING MDC) '7.7 65.4 70.6
17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 7.7 65.4 70.6
18. UNIT FORCED OUTAGE RATE 0.0 0.0 4.6
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :

Refueling outage began March 4; expected duration 49 days.

20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP: 04/17/1995
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERCIAL OPERATION 9J0813 ESTIMATED

. . _ _ _ . . ~ . . . . _ _ . . . . . _ -_-. ._ _ __ _ _ _ . - _

A'ttachment'to TXX 95095 Page 2 of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-445 UNIT: CPSES 1 DATE: 04/13/1995 COMPLETED BY: Ed Sirois TELEPHONE: 817/897-5664 l l

MONTH : MARCH 1995 l DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) i l

1 1058 17 0 l

2 1058 18 0 3 465 19 0 4 42 20 0 5 0 21 0 l l

6 0 22 0 7 0 23 0 8 0 24 0 i l 9 0 25 0 l 10 0 26 0 11 0 27 0 12 0 28 0 l 13 0 29 0 14 0 30 0 15 0 31 0 16 0

l l

Attachment to TXX-95095 Page 3 of 8 i

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.: 50-445 l

UNIT: CPSES 1 l l

04/13/1995 DATE:

l COMPLETED BY: Ed Sirois i TELEPHONE: 817/897-5664 MONTH : MARCH 1995 DAY TIME REMARK / MODE i

03/01 0000 Unit started month in MODE 1 at 98% power, with end of life power coastdown in progress.  ;

03/03 0800 Initiated power reduction for unit refueling outage (1RFO4).

03/04 0230 Tripped the turbine; Unit removed from the grid.

0340 Unit entered MODE 3.

03/05 0223 Unit entered MODE 4. ,

l 1705 Unit entered MODE 5.

03/09 1242 Unit entered MODE 6.

03/14 0310 Core offload complete l

03/26 1221 Unit re-enters MODE 6.

03/31 2400 Unit ended month in MODE 6.  ;

i

Attachment to TXX-95095 Page 6 of 8 UNIT SHUTDOWNS AND POWER REDUCTIONS -

DOCKET NO.: 50-445 l

UNIT: CPSES 1 l

DATE: 04/13/1995 .

COMPLETED BY: Ed Sirois TELEPHONE: 817/897-5664 4

REPORT MONTH . MARCH 1995 METHOD OF TYPE SHUTTING DOWN

F
FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS) REASON REDUCING POVKR CORRECTIVE ACTIONS / COMMENTS 1 950304 S 669.50 C 1 Refueling outage.

l

1) REASON 2) METHOD A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUEUNG G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN)

I 1

~

Att:chment to TXX-95095 Page 5 of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 e.

', NRC MONTHLY OPERATING REPORT DOCKET NO.: 50-446 UNIT: CPSES 2 DATE: 04/13/1995 COMPLETED BY: Ed Sirois TELEPHONE: 817/897-5664 OPERATING STATUS l

1 REPORTING PERIOD: MARCH 1995 GROSS HOURS IN REPORTING PERIOD: 744 ,

2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (MWe-Net): 1150
  • DESIGN ELECTRICAL RATING (MWe-Net): 1150
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): NONE
4. REASON FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 744 2,160 11,278
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 2,154
7. HOURS GENERATOR ON LINE 744 2,160 11,101
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2,496,290 7,304,421 34,604,347
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 850,218 2,493,912 11,649,967
11. NET ELECTRICAL ENERGY GENERATED (MWH) 815,623 2,398,512 11,093,468
12. REACTOR SERVICE FACTOR 100.0 100.0 77.6
13. REACTOR AVAILABILITY FACTOR 100.0 100.0 92.4
14. UNIT SERVICE FACTOR 100.0 100.0 76.4
15. UNIT AVAILABILITY FACTOR 100.0 100.0 76.4
16. UNIT CAPACITY FACTOR (USING MDC) 95.3 96.6 66.4
17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 95.3 96.6 66.4
18. UNIT FORCED OUTAGE RATE 0.0 0.0 10.0
9. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) .
20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERCIAL OPERATION 930803 ESTIMATED

i i

Attachment to TXX-95095 Page 6 of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-446 j UNIT: CPSES 2 DATE: 04/13/1995 COMPLETED BY: Ed Sirois j TELEPHONE: 817/897-5664 MONTH : MARCH 1995 l DAY AVEHAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1120 17 964 2 1114 18 1116'

\

l 3 1116 19 1116 4 1117 20 1116 5 1117 21 1116

, 6 1117 22 1116 7 1118 23 1115 8 1118 24 1117 9 1118 25 1114 10 1118 26 1116 l 11 1118 27 1116 12 1119 28 1116 13 1118 29 1117 14 1117 30 1117 15 396 31 1117 16 758 t

Att: chm:nt to TXX 95095 Page 7 of 8

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.: 50-446 UNIT: CPSES 2 DATE: 04/13/1995 COMPLETED BY: Ed Sirois TELEPHONE: 817/897-5664 MONTH : MARCH 1995 DAY TIME REMARK / MODE 03/01 0000 Unit started the month in MODE 1.

03/15 1515 Fault on switchyard breaker caused breaker to open creating electrica' .

transient to Condensate Polishing System resulting in condensate /feedwater transient. At this time Heater Drain Pump was intentionally shutdown to cause a generator runback in order to stabilize the transient. Power

educed to approximately 70% to repair minor damage. Repair included replacement of bearing on the hector drain pump.

03/17 1645 Unit restored to full power approximately this time.

03/31 2400 Unit ended the month in MODE 1

Attachment to THR-95095 Page 8 of 8

  • UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-446 9

UNIT: CPSES 2 DATE: 04/13/1995 ~ ,

COMPLETED BY: Ed Sirois TELEPHONE: 817/897-5664 REPORT MONTH : MARCH 1995 f METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO , DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS II 950315 F 48.50 A 4 Switchyerd breaker fault / heater drain pump failure.

See previous page.

1) REASON 2) METHOD A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN)

. _ _ - . _ _ - . _ _ _ _ . _ . _ . . . - _ _ . _ . . . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ - . . - _ _ _ . _ . _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _