ML20082J155
| ML20082J155 | |
| Person / Time | |
|---|---|
| Site: | 05200004 |
| Issue date: | 04/13/1995 |
| From: | Quinn J GENERAL ELECTRIC CO. |
| To: | Borchardt R NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20082J160 | List: |
| References | |
| MFN-045-95, MFN-45-95, NUDOCS 9504180140 | |
| Download: ML20082J155 (2) | |
Text
.
i 9
GENuclearEnergy en e Y165 SanJose, CA 95125-1014 MR B
ra s 5 Cu r 408 925-1005 (phone) 408 9254991 (facsimile)
April 13,1995 MFN 045-95 Docket STN 52404 Docum.'ut Control Desk U. S. b aclear Regulatory Commission Washinfon DC 20555 Attention:
Richard W. Borchardt, Director Standardization Project Directorate
Subject:
SBWR Test and Analysis Program Description, NEDO-32391, Revision B s
Reference:
- 1) MFN 018-95, J. E. Quinn (GE) to R. W. Borchardt (NRC), Approach to Achieve Closure ofItems Related to the GE SBWR TAPD, dated Febmary 14, 1995.
- 2) Memorandum to John T. Larkins (ACRS from Dennis M. Crutchfield (NRC), " Draft Safety Evaluation Report (SER) on the Adequacy of the Technical Approach to the Testing and Analysis Program (TAP) for the SimpliF.;d Boiling Water Reactor (SBWR) Design", dated November 25,1994.
- 3) ACRS Thermal Hydraulic Phenomena Subcommittee Meetings December 15 and 16,1994, and January 10,1995.
- 4) NRC/GE TAPD DSER Meeting January 9,1995.
- 5) 417th ACRS Meeting January 12, 1995.
This letter transmits Revision B of the SBWR Test and Analysis Program Description (TAPD) report, NEDO-32391, for your review. This report provides a comprehensive, integrated plan that addresses the testing and analysis elements needed for analysis of the SBWR performance.
In particular, this revision of the document describes the resolution of testing related issues identified in Reference 1, which summarizes issues raised in the Draft Safety Evaluation Report (Reference 2) and the References 3,4 and 5 meetings between GE-NE, the NRC and the ACRS.
1S0004 9504190140 950413 Y
k PDR ADOCK 05200004 A
PDR yt i)
L
~
O i
e GENuclearEnergy P
MFN 045-95 Page 2 The changes from Revision A to Revision B are identified by sidebars in the left-hand margins of the affected pages.
Sincerely, (li k ulk % W - hv James E. Quinn, Projects Manager LMR and SBWR Programs
Enclosure:
SBWR Test and Analysis Program Description (TAPD),
NEDO-32391, Revision B cc:
(all with 1 electronic copy and 1 paper copy)
P. A. Boehnert (NRC/ACRS) [7 paper copies]
T. H. Boyce (NRC)
I. Catton (ACRS)
S. Q. Ninh (NRC)
[plus one unbound copy]
J. H. Wilson (NRC)
_ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _