ML20082H695

From kanterella
Jump to navigation Jump to search
Forwards LERs 83-076/03L-0,83-050/03L-0 & 83-051/03L-0
ML20082H695
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/21/1983
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20082H701 List:
References
NUDOCS 8312010252
Download: ML20082H695 (1)


Text

-

e Milling Addr2ts Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L. Clayton, Jr.

Senior Vice President Flintridge Building AlabamaPower tnesoutwo etarc s>sem November 21, 1983 Docket No. 348 Docket No. 364 U. S. Nuclear Regulatory Comiss' ion Office of Inspection and Enforcement Region II 101 Marietta Street, N.W.

Suite 3100 Atlanta, Georgia 30303

Dear Sir:

Joseph M. Farley Nuclear Plant, Unit 1, Licensee Event Report No. LER 83-076/03L-0 and Unit 2 Licensee Event Reports Nos. LER 83-050/03L-0 and LER 83-051/03L-0 are forwarded with three (3) copies of each in accordance with FNP Technical Specification 6.9.1.13 to provide thirty (30) days written notification of the occurrences.

If you have any questions, please advise.

Yours very truly, hn F. L. Claytonh Jr.

FLCJ r/KWM:nac/F-6 Enclosures xc: Director, IE (30 copies)

Director, MIPC (3 copies)

$$k2kbo!

0$000$4B TEF-7Jfl e.

PDR S

/g 2

2. --

j