Provides Interim Response to IE Bulletin 83-06 Re Investigation of Existence of Tube-Line Products at Site.No Evidence of Tube-Line Products Found Following Review of Site Contractor Records.Final Rept Expected by 840201
ML20082H459
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/22/1983
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-SSINS-6820 EF2-64-690, IEB-83-06, IEB-83-6, NUDOCS 8312010163
Download: ML20082H459 (2)


Text

.

h O

Donsid A. Wells jQdy3}Oj" Amaw 2000 Second Avenue 31 3-November 22, 1983 EF2-64,690 Mr. James G. Keppler Regional Administrator U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

Reference:

Enrico Fermi Power Plant, Unit 2 USNRC Licensing Docket:

50-341 USNRC IE Bulletin 83-06 (7-22-83) 4

Subject:

Detroit Edison Interim Report Response to NRC IE Bulletin 83-06

Dear Mr. Keppler:

In response to the subject bulletin request, we hereby submit the following interim report on Detroit Edison's investigation for the determination of the existence of Tubeline products at the Enrico Fermi II site.

To date Project Quality Assurance for the Enrico Fermi Power j

Plant, Unit 2, have reviewed more than ninety percent of the records of site contractors and have found no evidence of Tubeline products.

Review of the Edison purchase order files produced a list of ninety-two purchase orders to companies listed in IE Bulletin 83-06.

Of these, sixty-nine are to Westinghouse and are most probably for electrical, rather than mechanical, items. An in-depth review will be made,however,of the product descriptions and any documentation received. Also, we have received a letter from General Electric, San Jose, declaring no Tubeline products were supplied to Enrico Fermi 2 in General Electric supplied equipment or spares to date.

A final report will be submitted by February 1, 1984.

Should you require additional information from Detroit Edison in this matter, please advise us.

8312010163 831122 Very truly yours, PDR ADOCK 05000341 PDR

\\

w G

I DAW /JDR/Im Enclosure hj V llQ NOV g g y

~~

Mr. James G. Keppler November 22, 1983 Page 2 EF2-64690 cc: Director Division of Reactor Construction Inspection Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Mr. Paul Byron Senior Resident Inspector U. S. Nuclear Regulatory Commission Resident Inspector's Office 6450 North Dixie Highway i

Newport, Michigan 48166 Mr. M. D. Lynch Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C.

20555

[

[