_ _ - - _ _ _ _ -
[
s C:mm:nwealth Edis::n
/ 1400 Opys Place.
(
(
3 Downers Grove. niinois 60515 s
August 12,1991 Dr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn:
Document Control Desk
Subject:
Braldwood Station Unit 1 I
Inservice Inspection Report for Interval 1, Period 1, Refuel Outage 2 NRCLRodeLNosJ0A56
Reference:
(a)
December 15,1988, S.C. Hunsader to letter to T, E. Murley
Dear Dr. Murley:
Inservice inspection ((ISI) program for NRC review that is currently being imolemented Reference a) provided the complete Braidwood Station Units 1 and 2 at the station. In accordance with the requirements of this program and Art cle i
IWA-6000 of Section XI of the ASME Boiler and Pressure Vessel Code 1983 Edition through and including the Summer,1983 Addenda) Commonwealth Ed(ison is 4
submitti the report of the ISI performed at Unit 1 from December 16,1989 throu h L
May 18, 991. This report is recuired to be submitted within 90 days of the com tion of a refueling outage. The Unit 1 refueling outage was completed on May 18,1991.
Please address any questions regarding this submittal to this office.
Very truly yours,
/7
- 4"cL_
Allen R. Checca Nuclear Licensing Administrator cc: R.M. Pulsifer - NRR w/o attachment W. Shafer - Rlli w/o attachment Braidwood Resident inspector w/o attachment
,$k81$ca osooo m 138 910a12 o
ZNLD/968/8 O
in
__