ML20082G402
| ML20082G402 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 04/07/1995 |
| From: | Broughton T GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20082G405 | List: |
| References | |
| C311-95-2166, NUDOCS 9504130238 | |
| Download: ML20082G402 (1) | |
Text
gy.',u -
l 9 g:*?
&l 4
GPU Nuclear Corporation gf Route 441 South P.O. Box 480 Middletown, Pennsylvania 17057-0480 (717) 944-7621 Writer's Direct Dial Number:
(717) 948-8005 e
April 7.1995 C311-95-2166 U. S. Nuclear Regulatory Commission
'Att: Document Control Desk
' Washington, DC 20555
Dear Sir:
Subject:
Three Mile Island Nuclear Station, Unit 1 (TMI-1)
Operating License No. DPR 50 Docket No. 50-289 Twentieth Year Reactor Building Tendon Surveillance Test In accordance with TMI-1 Technical Specifications (TS) 4.4.2.1.6.a, enclosed is the-report, "Three Mile Island Unit 1 Reactor Building Twenty Year Tendon Surveillance'(Inspection Period 6)," Topical Report (TR) No. 093. The TR includes the two-volume contractor (Precision Surveillance Corp.) report entitled "20th Year Physical Surveillance of the Three Mile Island Unit 1 Containmtmt Building."
- Our evaluation of the.results from tests and inspections conducted 20 years after the initial Structural Integrity Test (SIT) demonstrate that the TMI-1 Reactor Buildhg post tensioning system is in good condition and capable of performing its, intended futiction during all ~ design basis events. The functionai capability of the system remains within design limits and no abnormal relaxation of prestressing forces in the tendons has occurred.
Sincerely,
.2d Llw T. G. B ughton 2CC0G2 Vice President and Director, TMI Enclosure MRK-
-cc:
Region I Administrator i
TMI-1 Senior Project Manager g0\\
TMI Senior Resident Inspector 9504130238 950407 PDR ADOCK 05000289 P.
PDR GPU Nuclear Corporation is a subsidiary of General Public Utilities Corporation a