m 2NRC-3-093 (412) 787 - 5141 Telecopy 4 8
6 November 23, 1983 Nuclear Construction Division Robinson Plaza, Building 2. Suite 210 Pittsburgh, PA 15205 United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Mr. Darrel G. Eisenhut, Director Division of Licensing Of fice of Nuclear Reactor Regulation
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Final Safety Analysis Repo rt - NRC " Req ue s t s fo r Ad di t io nal Information Gentlemen:
This le t t er is confirming a conve rs a t io n between L.
Lazo (NRC, P roj ect Manager) and E. F. Kurtz (DLC) at the NRC Environment al Site Visit on September 28 and 29,1983, concerning the schedule for res ponding to NRC
" Req ue s t s for Additional Information" on the Final Safety Analysis Report (FSAR).
DLC has received several additional requests fo r information since the original single set of NRC que s t ions da t ed August 31, 1983.
The following reques ts have since been received and were discussed at the site visit:
Date of Date No.
Letter Received Subject Questions Due Date 9/16/83 9/23/83 Power Systems--Mechanical 94 11/18/83 9/19/83 9/26/83 Seismology / Geology 9
11/18/83 9/19/83 9/26/83 PSI /ISI 4
11/18/83 9/19/83 9/26/83 Instrumentation and Control (ICSB) 5 11/18/83 9/22/83 9/26/83 Equipment Qualification 11 11/18/83 9/22/83 9/26/83 Mechanical Equipment Quali fica t ion 2
11/23/83 9/28/83 10/5/83 Plant Personel Training 13 11/25/83 Due to the number of submi ttals, tot al numb e r of ques t ions ( 138 ),
t echnical content of the ques t ions, and the short period in which to answer 8311290223 831123 PDR ADOCK 05000412 A
PDR f
United States Nuclear Regulatory Commission V*Mr. Darrel G. Eisenhut, Director Page 2 s
some of these que s t io ns, DIE r eque s ted a single submittal on December 5, 1983.
This submittal' will contain res ponses to all of these req ues t s fo r informat ion.
Ms. Lazo agreed with this date, indicat ing that Decembe r 5, 1983, will not impact the overall NRR review schedule.
Should you have any questions, please cont act E. F. Kurtz, Jr., at (412) 787-5141.