Text

.

=-

u-as 150 North Wacker Drwe, Chicago, IL 60606 312236-5701 83021.045 November 14, 1983 Director of Nuclear Reactor Regulation Attention: Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. William F. Colbert, General Supervisor Ntclear Safety and Plant Engineering (342 NOC)

The Detroit Edison Company Enrico Fermi 2 Nuclear Operations Center 6400 North Dixie Highway Newport, Michigan 48166

Subject:

Supplement to Final Report Independent Design Verification Program Detroit Edison - Enrico Fermi Unit 2 Docket #50-341

Dear Sirs:

Enclosed is Volume 4 of the Final Report for the Independent Design Verifi-cation Program (IDVP) performed by Cygna Energy Services on Enrico Fermi -

Unit 2. This additional report presents supplemental information in support of the results and conclusions submitted in Volumes 1, 2, and 3 of the IDVP Final Report (dated April 29,1983). Specifically, it clarifies and expands on the bases for resolving a number of the reported observations and potential findings and outlines the extent Cygna's review was expanded beyond the origi-nally defined work scope. It also addresses comments and questions resulting from subsequent NRC Staff and Detroit Edison reviews of our original submittal.

A revised cover sheet and Table of Contents are provided inside the front cover of Volume 4 with an instruction sheet for. inserting this material into Volume 1 of the Final Report. Volume 4 of the Final Report, along with the requisite number of copies, is being transmitted to both the NRC and Detroit Edison con-currently.

8311280425 831114 PDR ADOCK 05000341 R PDR San Franosco Boston Los Angeles Ch.cago Kennewick SanJose SanDiego 49 \

l

= l

~< . . .

Dir:cter of Nuclear Reactor Regulation 4l 6 Attention: Mr. B. J. Youngblood, Chief U.S. Nuclear Regulatory Commission

",="","""

s ._

Mr. William F. Colbert The Detroit Edison Company November 14, 1983 Page 2 If you have any questions or comments, or require additional information to complete your review, please do not hesitate to contact me at (312) 225-5701.

Very truly yours, D. A. Fer Project Manager DAF/db Enclosure (40 copies for NRC)

(20 copies for DECO) cc: M. D. Lynch (NRC, NRR-DOL) with Enclosure (2 copies)

J. G. Keppler (NRC IE, Region III) with Enclosure (2 copies)

M. G. Sigetich (DECO) w/o Enclosure

0. K. Earle (DECol w/o Enclosure