ML20082E696

From kanterella
Jump to navigation Jump to search
Corrected Amends 63 & 62 to Licenses DPR-80 & DPR-82, Respectively Adding Amend Number to Tech Spec Page 3/4 2-20 Re Power Distribution Limits
ML20082E696
Person / Time
Site: Diablo Canyon  
Issue date: 07/26/1991
From:
NRC
To:
Shared Package
ML20082E699 List:
References
NUDOCS 9108010199
Download: ML20082E696 (1)


Text

..

POWER DISTRIBUTION LIMITS SURVEILLANCE REQUIREMENTS 4.2.4.1 The QUADRANT POWER TILT RATIO shall be determined to be within the limit above 50% of RATED THERMAL POWER by:

a.

Calculating the ratio at least once per 7 days when the alarm is OPERABLE, and b.

Calculating the ratio at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during steady-state operation when the alarm is inoperable.

4.2.4.2 The QUADRANT POWER TILT RATIO shall be determined to be within the limit when above 75% of RATED THERMAL POWER with one Power Range channel in-operable by using the movable incore detectors to confirm that the normalized symmetric power distribution, obtained frota the 4 pairs of symmetric thimble locations or from a full incore flux map per specification 3.3.3.2, is consistent with the indicated QUADRANT POWER TILT RATIO at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

6 DIABLO CANYON - UNITS 1 & 2 3/4 2-20 Amendment Nos. 63 & 62 l

ejios010199 910726 PDR ADUCK 05000275 p

PDR

_ _ - _ - _ - _ _ _ - - -