ML20082E678
| ML20082E678 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 11/22/1983 |
| From: | Levin H TERA CORP. |
| To: | Jackie Cook, Eisenhut D, James Keppler CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III), Office of Nuclear Reactor Regulation |
| References | |
| ISSUANCES-OL, ISSUANCES-OM, NUDOCS 8311280279 | |
| Download: ML20082E678 (5) | |
Text
P L J hI November 22,1983 Mr. James W. Cook Vice President Consumers Power Company 1945 West Pornoll Road Jackson, Michigan 49201 Mr. J. G. Keppler Administrator, Region lli Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 Mr. D. G. Eisenhut Director, Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Docket Nos. 50-329 OM, OL and 50-030 OM, OL Midland Nuclear Plant - Units I and 2 Independent Design and Construction Verification (IDCV) Program Meeting Notice - Fourth OCR Status Review Meeting Date:
November 30,1983 (Notice that this date is one day earlier than proposed in the sixth IDCVP Monthly Status Report, dated November 15, 1983)
Time:
9:00 a.m.
Location: Bechtel Offices Conference Room IBl/IB2 777 East Eisenhower Parkway Ann Arbor, Michigan
Subject:
Discussion and Status of Confirmed items, Findings, and Findings Resolution Agendo:
See ottochment.
>\\
8311280279 831122 PDR ADOCK 05000 g
A TERA CORPORATION 7101 WISCONSIN AVENUE BETHESDA. MAfMAND 20814 301 65&S960
O Mr. J. W. Cook 2
November 22,1983 s
Mr. J. G. Keppler Mr. D. G. Eisenhut
Participants:
H. Levin, et al., TERA L. Gibson, Consumers Power Company P. Keshishion/G. Gower, NRC, l&E HQ D. Hood, et al., NRC, NRR J. Clements, et al., Bechtel F. Levandoski, et al., Babcock & Wiscox Sincerely, t
twrar j,
v4~-
Howard A. Levin Project Monoger Midland IDCV Program cc: Porticipants R. Erhardt, CPC B. Budzik, CPC D. Quammy, CPC (site)
R. Whitaker, CPC (site)
J. Taylor, NRC, I&E HQ Midland IDCVP Service List HAL/djb l
l TE?A CORPO7ATION
O SERVICE LIST FOR MIDLAtO INDEPEf0ENT DESIGN s
APO CONSTRUCTION VERIFICATION PROGRAM cc:
Harold R. Denton, Director Ms. Barbara Stamiris Office of Nuclear Reactor Regulat. ion 5795 N. River U.S. Nuclear Regulatory Commission Freeland, Michigan 48623 Washington, D.C. 20555 Mr. Wendell Marshall James G. Keppler, Regional Administrator Route 10 U.S. Nuclear Regulatory Commission, Midland,04ichigan 48440 Region ill 799 Roosevelt Road Mr. Steve Godler Glen Ellyn, Ill,inois 60137 2120 Corter Avenue St. Paul, Minnesoto 55108 U.S. Nuclear Regulatory Commission Resident inspectors Office Ms. Billie Pirner Garde M$lond' Michi on 48640 ire t r, Citizens CHnic 9
for Accountable Government Government Accountability Project Mr. J. W. Cook Institute for Policy Studies Vice President 1901 Que Street, N.W.
Consumers Power Company Washington, D.C. 20009 1945 West Parnall Road Jackson, Michigan 49201 Charles Bechhoefer, Esq.
Atomic Safety & Licensing Board eh Esq.
U.S. Nuclear Regulatory Commission gm of
'B, Washington, D.C. 20555 Three First National Plazo, Chic o,Ill is 60602 S
6125 N. Verde Trail James E. Brunner, Esq.
Boca Roton, Florido 33433 Consumers Power Company 212 West Michigan Avenue Jerry Harbour, Esq.
Jackson, Mich,gan 49201 Atomic Safety and Licensing Board i
U.S. Nuclear Regulatory Commission f7il Su Washington, D.C. 20555 e set Drive Midland, Michigan 48640 Mr. Ron Collen Michigan Public Service Commission Cherry & Flynn 6545 Mercantile Way Suite 3700 P.O. Box 30221 Three First Notional Plaza Lansing, Michigan 48909 Chicago, Ill,no,is 60602 i
Mr. Poul Rau Ms. Lynne Bernobe.
Midland Dolly News i
Government Accountobility Proj.ect 124 Mcdonald Street 1901 O Street, NW Midland, Michigan 48640 Washington, D.C. 20009
4 AGENDA FOR NOVEMBER 30,1983 IDCVP MEETING 4
BECHTEL OFFICES Ated ARBOR, MICHIGAN I.
Estimated Time 9:00 a.m. - Start 12:00 p.m. - 12:45 p.m. - Lunch 3:00 p.m. - Adjournment II.
Discussion of Confirmed items Findings, Observations, and Resolved items item TERA Lead A.
Construction F-049*, F-050*
Tulodieski e
C-091 *, C-092*
Tulodieski e
Z-045*, Z-046*, F-047 Tulodieski e
C-055*
Tulodieski e
C-056*
Tulodieski e
C-052, C-053, C-054 Tulodieski e
e F-036 Tulodieski e F-031 Tulodieski B.
Mechanical / Systems C-026*
Dougherty e
e C-081*
Dougherty F-018*, Z-018*
Dougherty e
R-020*, R-027*, C-005 Dougherty e
C-087*, C-088*, C-089*
Dougherty e
e C-038 Dougherty e C-025 Dougherty e C-043 Dougherty e C-048 Dougherty B-080*, B-086*, B-090* (only if the project Dougherty e
has questions)
R-073*
Witt e
C-066, C-074, C-075, C-076 Witt e
C.
Electrical Bates e C-039 e C-040 Bates Bates e C-022 I
s item TERA Lead D.
Structural e C-015 Mortgat e C-068 Mortgot e C-077 Mortgot Ill.
Discussion of programmatic issues (if necessary)
IV.
Discussion of Action items and Logistics for Information Exchange V.
Adjournment Notes:
1.
Items are grouped to the degree practical to facilitate discus-sion and minimize manpower requirements during the entire meeting.
2.
Items that changed status during the October reporting period are denoted with an asterisk.
U i
L 2
..-.