Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change 95-10,revising Actions for TS 3.8.1.1 & Eliminating Unnecessary DG Starts,As Recommended in GL 84-15 & Consistent W/Std TS (NUREG-1431)
ML20082E598
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/06/1995
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20082E601 List:
References
RTR-NUREG-1431 GL-84-15, NUDOCS 9504110275
Download: ML20082E598 (3)


Text

7. - , - -

IC

k. '

l

~ VA Tenne.ssee Valley Authont/ Post Office Box 2000. Soddy-Daisy. Tenressee 37379 Apri! G,1995 TVA-SON-TS-94-19 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SON) - TECHNICAL SPECIFICATION (TS)

CHANGE 94-19, " ELIMINATION OF UNNECESSARY DIESEL GENERATOR (D/G) STARTS" in accordance with 10 CFR 50.90, we are enclosing an amendment to '

Licenses DPR-77 and DPR-79 to change the TSs of SON Units 1 and 2. The proposed change revises the requirements for verifying the operability of other D/Gs when one D/G is inoperable. This revision would substitute the verification that the inoperability of the affected D/G is not the result of a common cause failure in place of performing starts on each of the operable D/Gs. This revision provides additional reductions of D/G starts as recommended in Generic Letter 84-15 and is consistent with standard TSs (NUREG 1431).

The proposed TS change is identified in Enclosure 1. The justification for the proposed TS change is provided in Enclosure 2. A proposed determination of no significant safety hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3.

TVA requests a 45-day implementation period for this TS change following issuance.

f 110027

  • 9504110275 950406  !'

PDR ADOCK 05000327 i P PDR .

m  : l.11 =

y, - c . -..-

.t . .

LU.S. Nuclear Regulatory Commission Page 2 .

April 6,1995..

> Please direct questions concerning this issue to Keith Weller at (615) 843-'

7527.

Sincerely, h,h,'

R. H.- Shell Manager -t

.. .' SON Site Licensing Swornf[o and sub cribed fore me is /o E day of -

1995 )

Iff)A $ A'/b N'ofdry Public l' My Commission ExpiresM .2/ Nfh i

i Enclosures cc: See page 3 l I

').

i

--m+. y' W / M w:. m- ~ e swy'h- w $ {

y --. .;-

q 0, ,

by c p

.U.S. Nuclear Regulatory _ Commission

- Page 3' April 6,1995 -

(Enclosures):-

Mr. D. E. LaBarge, Project Manager Nuclear Regulatory Commission One White Flint,. North 11555 Rockville Pike Rockville, Maryland 20852-2739

' Mr. Michael H. Mobley, Director (w/o Enclosures)

Division of Radiological Health 3rd Floor L & C Annex 401 Church Street Nashville, Tennessee 37243-1532 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy,-Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission -