ML20082E598
| ML20082E598 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 04/06/1995 |
| From: | Shell R TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20082E601 | List: |
| References | |
| RTR-NUREG-1431 GL-84-15, NUDOCS 9504110275 | |
| Download: ML20082E598 (3) | |
Text
7. -,
- k.
l
~ VA Tenne.ssee Valley Authont/ Post Office Box 2000. Soddy-Daisy. Tenressee 37379 Apri! G,1995 TVA-SON-TS-94-19 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SON) - TECHNICAL SPECIFICATION (TS)
CHANGE 94-19, " ELIMINATION OF UNNECESSARY DIESEL GENERATOR (D/G) STARTS" in accordance with 10 CFR 50.90, we are enclosing an amendment to Licenses DPR-77 and DPR-79 to change the TSs of SON Units 1 and 2. The proposed change revises the requirements for verifying the operability of other D/Gs when one D/G is inoperable. This revision would substitute the verification that the inoperability of the affected D/G is not the result of a common cause failure in place of performing starts on each of the operable D/Gs. This revision provides additional reductions of D/G starts as recommended in Generic Letter 84-15 and is consistent with standard TSs (NUREG 1431).
The proposed TS change is identified in Enclosure 1. The justification for the proposed TS change is provided in Enclosure 2. A proposed determination of no significant safety hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3.
TVA requests a 45-day implementation period for this TS change following issuance.
f 110027 9504110275 950406 PDR ADOCK 05000327 i
P PDR
l.11 =
m y,
- c. -..
.t LU.S. Nuclear Regulatory Commission Page 2.
April 6,1995..
Please direct questions concerning this issue to Keith Weller at (615) 843-'
7527.
Sincerely, h,h,'
R. H.- Shell Manager
- t
...' SON Site Licensing Sworn [o and sub cribed fore me is /o E day of 1995
)
f Iff)A $
A'/b l'
N'ofdry Public My Commission ExpiresM.2/ Nfh i
i Enclosures cc: See page 3 I
' )
i W
/
M w:.
m-
~
e swy'h-w
--m+.
{
y'
y
- q 0, by c
p
.U.S. Nuclear Regulatory _ Commission
- Page 3' April 6,1995 -
(Enclosures):-
Mr. D. E. LaBarge, Project Manager Nuclear Regulatory Commission One White Flint,. North 11555 Rockville Pike Rockville, Maryland 20852-2739
' Mr. Michael H. Mobley, Director (w/o Enclosures)
Division of Radiological Health 3rd Floor L & C Annex 401 Church Street Nashville, Tennessee 37243-1532 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy,-Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission -
Region il 101 Marietta Street, NW,' Suite 2900 Atlanta, Georgia 30323-2711 m
e#
+
_