ML20082E562
| ML20082E562 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 04/06/1995 |
| From: | Shell R TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20082E565 | List: |
| References | |
| NUDOCS 9504110261 | |
| Download: ML20082E562 (3) | |
Text
- - - - _
jgK ffg;
?
"IVA Tennessee Valley Authorrty. Post Othce Box 2000, Soddy-Daisy. Tennessee 37379 g.
t i
F i
i April 6,1995 b
1
[
TVA-SON-TS-95-02 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk I
Washington, D.C. 20555 Gentlemen:
L in the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 l
l-SEQUOYAH NUCL EAR PLANT (SON) - TECHNICAL SPECIFICATION (TS)
CHANGE 95-02, " ADDITION OF PROVISIONS FOR OPERABILITY TESTING AND DEFINITION OF TIME INTERVAL TO BYPASS CONDITION"
-In accordance with 10 CFR 50.90, we are enclosing an amendment to Licenses DPR-77:and DPR-79 to change the TSs of SON Units 1 and 2. The proposed change adds a new limiting condition for operation to Section 3.0 that allows l
1 equipment to be returned to service under administrative control to perform operability testing. This revision also defines the time interval to place a channel
[
in bypass to be six hours in accordance with Action 18 of TS Table 3.3-3.
The proposed TS change is identified in Enclosure 1. The justification for the proposed TS change is provided in Enclosure 2. A proposed determination of no significant safety hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3.
TVA requests a 45-day implementation period for this TS change following l
issuance.
I-f L
110028 9504110261 950406 I
PDR ADOCK 05000327 P,
PDR.
pp
),;2.:pj It..
- ,,
- q7.e, [
,w>
c s.
g
'i U.S. Nuclear Regulatory Commission
,p
' Page 2 '
April 6,' 1995 i
r Please direct questions concerning this issue to Keith Weller at (615) 843-7527.
Sincerelyi-ko k f
R. H. Shell Manager SON Site Licensing i
Sworn o and subjs ribed fore me day of //
1995 llT11 $.
j Not'ary'Public My Commission Expires c2//ffh
[
Enclosures.
cc: See page 3 i
I
.j l
7, q
-p, o
I
.U.S. Nuclear Regulatory Commission Page 3 l
. April 6,1995l (Enclosures):
i Mr. D. E. LaBarge, Project Manager Nuclear Regulatory. Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. Michael H. Mobley, Director (w/o Enclosures)-
Division of Radiological Health 3rd Floor L & C Annex 401 Church Street Nashville, Tennessee 37243-1532 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711
.