ML20082E349

From kanterella
Jump to navigation Jump to search
Application for Amend to License DPR-77,revising Operating Condition 2.c to Add Extension on Ice Condenser Surveillance 4.6.5.1.d to 951001
ML20082E349
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 04/06/1995
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20082E353 List:
References
NUDOCS 9504110202
Download: ML20082E349 (3)


Text

y' e.. .

,e 4

, Tennessee Valley Authority. Post offce Box 2000. Goddy-Daisy. Tennessee 37379 April 6,1995 TVA-SQN-TS-95-09 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket No. 50-327 Tennessee Valley Authority )

SEQUOYAH NUCLEAR PLANT (SON) - TECHNICAL SPECIFICATION (TS)

CHANGE 95-09, " EXTENSION OF ICE CONDENSER SURVEILLANCE REQUIREMENTS FOR UNIT ONE CYCLE SEVEN"

Reference:

NRC letter to TVA dated January 3,1995, " Issuance of Amendment (TAC NO. M90781) (TS 94-17)"

In accordance with 10 CFR 50.90, we are enclosing an amendment to License DPR-77 to change the SON Unit 1 TSs. The proposed change will revise Operating Condition 2.C.(25) to add the extension of ice condenser Surveillance 4.6.5.1.d to October 1,1995. This is an addition to the extensions approved by NRC in the referenced letter and will support operation of Unit 1 to the scheduled refueling outage date.

The proposed operating license change is identified in Enclosure 1. The justification for the proposed change is provided in Enclosure 2. A proposed determination of no significant safety hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3.

~3urveillance 4.6.5.1.d will exceed the allowable extension of 25 percent provided by TS 4.0.2 on September 5,1995. TVA requests approval of the proposed revision before September 1995 to allow continued operation of Unit 1 until the Cycle 7 refueling outage scheduled for October 1,1995.

'9504110202 950406

PDR' ADOCK 05000327 i P PDR. g

c, . A E . .

o . .:

f L:-

'- ' U.S.- Nuclear Regulatory Commission Page 2 April 6,1995 1

TVA requests a 30-day implementation period'for this TS change following Issuance.

Please direct questions concerning this issue to Keith Weller at (615) 843-7527.

Sincerely, a$. .

R. H. Shell Manager

- SON. Site Licensing Sworp o and subs ibed b fore me

's' /n .5 day of 1995 LD7/ $.' t 'fh Not$ry' Public My Commission Expiresk //fff i Enclosures i cc: See page 3 i

I l

l 4

- N T

e,

. y u ,

.; -g,; c U.S. Nuclear Regulatory Commission

  • Page 31  ;

April 6,.1995

, .(Enclosures): .

Mr. D. E. LaBarge, Project Manager . ,

x Nuclear Regulatory Commission.

One White Flint, North  ;

11555 Rockville Pike

Mr. Michael H. Mobley, Director (w/o Enclosures) ,

~, Division of Radiological Health

3rd Floor  ;

L & C Annex "

401. Church Street Nashville, Tennessee 37243-1532 NRC Resident inspector

. Sequoyah Nuclear Plant -i 2600 Igou Ferry Road Soddy-Daisy,' Tennessee 37379-3624 i

Regional Administrator U.S. Nuclear Regulatory Commission -l Region ll  ;

101 Marietta Street, NW, Suite 2900

. Atlanta, Georgia 30323-2711 r

t I

a

  • r Y

4 m = - # , -.-, y , 4 y