Application for Amends to Licenses DPR-77 & DPR-78,deleting TS 3.9.7, Crane Travel-Spent Fuel Pit Area, & Associated Surveillances
ML20082E305
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/06/1995
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20082E311 List:
References
NUDOCS 9504110188
Download: ML20082E305 (3)


Text

'

4;. .

F:

~

r 6

  • Hl4 Tennessee Va%y Authonty Post Othce Box 2000, Soddy-Daisy. Tennessee 37379 Aprii 6,1995 TVA-SON-TS-95-06 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SON) - TECHNICAL SPECIFICATION (TS)

CHANGE 95-06, " DELETION OF TS 3/4.9.7, CRANE TRAVEL - SPENT FUEL PIT AREA" In accordance with 10 CFR 50.90, we are enclosing an amendment to Licenses DPR-77 and DPR-79 to change the TSs of SON Units 1 and 2. The proposed change deletes TS 3.9.7, " Crane Travel- Spent Fuel Pit Area," and its associated surveillances.

The proposed TS change is identified in Enclosure 1. The justification for the proposed TS change is provided in Enclosure 2. A proposed determination of no significant safety hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3.

As a result of NRC's final policy statement on TS improvements (58 FR 39132, July 22,1993), four criteria were established to screen TSs. TSs that satisfy .

one or more of these criteria must be retained. Successful application of these l criteria is the basis for TVA's request that the subject TS be relocated to administratively controlled procedures.

Fuelinspections planned for the upcoming Unit 1 Cycle 7 require the use of the auxiliary building crane. Based on this requirement, TVA is requesting approval by mid-August 1995. This will allow a 30-day implementation period to support I

110030 9504110188 950406 7 '

gDR ADOCK 05000327

.PDR s

rt ..

-'j : .- ( . .

.A b i

i i

i U.S. Nuclear Regulatory Commission j Page 2 -l

- April 6, .1995 l the start of the Unit 1 Cycle 7 refueling outage. The outage is currently scheduled to begin on September 9,1995.

Please direct questions concerning this issue to W. C. Ludwig at (615) 843-7460. l Sincerely, l

( $

R. H. Shell Manager >

SON Site Licensing -)

Sworn to and subs,qribe,d efore me l is /a_+*_ day of (1 1995

//~Ah Y d(D iy om sion Expires <2/ffh  ;

i Enclosures cc: See page 3 p

w

. '4

'l i :

U.S. Nuclear Regulatory Commission l

Page 3 April 6,1995 (Enclosures):

Mr. D. E. LaBarge, Project Manager ,

Nuclear Regulatory Commission One White Flint, North 1.1555 Rockville Pike 1.

Rockville, Maryland 20852-2739 Mr. Michael H. Mobley, Director (w/o Enclosures)

Division of Radiological Health 3rd Floor L'& C Annex 401 Chuich Street Nashville, Tennessee 37243-1532 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 l

-