6 Hl4 Tennessee Va%y Authonty Post Othce Box 2000, Soddy-Daisy. Tennessee 37379 Aprii 6,1995 TVA-SON-TS-95-06 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SON) - TECHNICAL SPECIFICATION (TS)
CHANGE 95-06, " DELETION OF TS 3/4.9.7, CRANE TRAVEL - SPENT FUEL PIT AREA" In accordance with 10 CFR 50.90, we are enclosing an amendment to Licenses DPR-77 and DPR-79 to change the TSs of SON Units 1 and 2. The proposed change deletes TS 3.9.7, " Crane Travel-Spent Fuel Pit Area," and its associated surveillances.
The proposed TS change is identified in Enclosure 1. The justification for the proposed TS change is provided in Enclosure 2. A proposed determination of no significant safety hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3.
As a result of NRC's final policy statement on TS improvements (58 FR 39132, July 22,1993), four criteria were established to screen TSs. TSs that satisfy one or more of these criteria must be retained. Successful application of these l
criteria is the basis for TVA's request that the subject TS be relocated to administratively controlled procedures.
Fuelinspections planned for the upcoming Unit 1 Cycle 7 require the use of the auxiliary building crane. Based on this requirement, TVA is requesting approval by mid-August 1995. This will allow a 30-day implementation period to support I
110030 9504110188 950406 7
gDR ADOCK 05000327
.PDR s
rt
-'j :
.- (.
.A b i
i i
i U.S. Nuclear Regulatory Commission j
Page 2
-l
- April 6,.1995 the start of the Unit 1 Cycle 7 refueling outage. The outage is currently scheduled to begin on September 9,1995.
Please direct questions concerning this issue to W. C. Ludwig at (615) 843-7460.
Sincerely,
(
R. H. Shell Manager SON Site Licensing
-)
Sworn to and subs,qribe,d efore me is /a_+*_ day of (1 1995
//~Ah Y d(D iy om sion Expires
<2/ffh i
Enclosures cc: See page 3 p
w
. '4
'l i :
U.S. Nuclear Regulatory Commission l
Page 3 April 6,1995 (Enclosures):
Mr. D. E. LaBarge, Project Manager Nuclear Regulatory Commission One White Flint, North 1.1555 Rockville Pike 1.
Rockville, Maryland 20852-2739 Mr. Michael H. Mobley, Director (w/o Enclosures)
Division of Radiological Health 3rd Floor L'& C Annex 401 Chuich Street Nashville, Tennessee 37243-1532 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711
-