Comments on ASLB 831115 Memorandum & Order Granting Applicant Motion for Summary Disposition of Contention I-62 Re Reactor Pressure Vessel Vendor Facility.Related Correspondence
ML20082D720
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 11/18/1983
From: Wetterhahn M
CONNER & WETTERHAHN, PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Atomic Safety and Licensing Board Panel
Shared Package
ML20082D723 List:
References
NUDOCS 8311220525
Download: ML20082D720 (2)


Text

,

RELATD COEFr?O'!DZ'!CE l

-40CKETED USNRC UNITED STATES OF AMERICA 13 V 21 M0:25 NUCLEAR REGULATORY COMMISSION 0FFICE OF SECBETW 00CKETmG & SERV!U.

Before the Atomic Safety and Licensing Boar $ANCH In the Matter of

)

)

Philadelphia Electric Company

-)

Docket Nos. 50-352

)

50-353 (Limerick Generating Station,

)

Units 1 and 2)

)

NOTIFICATION TO LICENSING BOARD REGARDING ITS MEMORANDUM AND ORDER GRANTING APPLICANT'S s

MOTION FOR

SUMMARY

DISPOSITION OF CONTENTION I-62 On November 15, 1983, the Atomic Safety and Licensing Board -issued its Memorandum and Order Granting Applicant's Motion for Summary Disposition of Contention I-62.

.On page 7 of that document, the Board stated:

The Board finds that no bacis has been presented, nor is one apparent to consider potential relationships between welding of the reactor pressure vessel during fabrication in a vendor's facili-ty and overall structural

welding, particularly that at the plant site (the apparent basis of contention VI-1).

One possible interpretation of this sentence is that the reactor pressure vessel vendor's facility was at a location other than the plant site.

While Apolicant believes that this sentence was peripheral to the Board's reasoning in granting the motion and provided only in response to a generalized assertion by the intervencr, Applicant wishes to bring to the Board's attention the fact that the Limerick Generating -Station reactor pressura vessels were only 8311220525 831118 0h PDR ADOCK 05000352 9

o eor

- partially fabricated of fsite at a vendor's facility.1_/

The reactor pressure vessel rings and top and bottom heads were fabricated at Chicago Bridge and Iron's

("CB&I")

Memphis manufacturing facility.

These pieces were shipped to the Limerick site where CB&I completed the circumferential welding of the rings and headr and welding of safe ends in a specially constructed onsite' facility which was completely under the administrative and quality control of CB&I.

The CB&I facility was comparable, for the function $s performed, to an offsite fabrication facility.

The resulting welds w

were at least comparable to those which could be produced at an offsite facility.

The fact that certain welding by CB&I was accomplished onsite does not call into question the quality _of such welding.

Applicant submits that there is no reason to modify in any way the Board's grant of aummary disposition with regard to Contention I-62.

l_

Respectfully submitted, CONNER & WETTERHAHN,

.C.

[

i Mark J. Wetterhahn l

l Counsel for Philadelphia Electric Company t

November 18, 1983 1_/

See Vermont Yankee Nuclear Power Corporation (Vermont Yankee Nuclear Pcwer Station), ALAB-138, 6 AEC 520, 533 (1973).

(

l

---