i f
'. Commonwsalth Edison ey j
/ One First National PL;c, Chicago, Ilhnois T
.\\
} Address Reply to: Post Offics Box 767 e Chicago, Illinois 60690 j
October 28, 1983 Mr. James G. Keppler, Regional Administrator U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137
Subject:
Byron Generating Station Units 1 and 2 Inspector Qualification and Certification Inspection Report Nos. 50-454/82-05 and 50-455/82-04 References (a): June 24,1982, letter from C. E. Norelius to Cordell Reed.
(b): February 23, 1983 letter.from W. L. Stiede to J. G. Keppler.
Dear Mr. Keppler:
This letter provides a preliminary report on actions taken to verify the adequacy.of QC inspections during construction of Byron Generating Station. This reinspection was~ undertaken as described in reference (b) in response to a Violation identified in reference (a).
The enclosed report describes the Byron reinspection program and summarizes the results. -A number of minor discrepancies were identified during the reinspections, but when taken as a whole the results do not indicate generic defects in past practices for the training and certification of QC inspectors. For this reason, no further inspection is judged necessary at this time.
Final analysis of the results is not yet complete. The final report uill be provided within four weeks and will document our complete analysis of the inspection results.
In the interim, we are available at your convenience to discuss the enclosed report. We are aware that regional inspection personnel have been involved in reviewing the reinspection program during its conduct. To the extent that we are aware of concerns identified during those reviews, those concerns will be addressed in the final report.
8311220497 831118 00N1 m PDR ADOCK 05000454 G
s_ -
b J. G. Keppler October 28, 1983 To the best of my knowledge and belief, the statements contained herein and in the attachment are true and correct.
In some respects these statemen_ts are not based on my personal knowledge but upon information furnished by other Commonwealth Edison employees and contractor employees.
.Such information has been reviewed in accordance with Company practice and I believe it to be reliable.
Please direct any questions that you or your staff may have concerning this matter to this office.
Very truly yours, m40. f (L Louis 0. DelGeorge Staff Assistant Office of Vice President, Nuclear Operations 1m 7511N