Text
_
4 VERMONT YANKEE' TNUCLEAR POWER CORPORATION y
Ferry Road, Brattleboro, VT 05301-7002.
j f
ENGINEERING OFFICE -
580 MAIN STREET '
BOLTON, MA 01740 (500)779-6711 BVY 95-40 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk.
Washington, D.C.
20555 References See Attachment A
Subject:
Vermont Yankee Inservice Test Program Plan ~ Revision 17 With this letter, Vermont Yankee submits Revision 17 of the Vermont Yankee Inservice Test Program Plan (Attachment C) for your information.
This IST Program Plan revision ~ changes the disassembly frequency of Service Water System check valves V10-43A and V-43B.
The justification for changing.the frequency of these valves is identified in a new relief request (RR-V12).
These IST Program Plan changes and relief request RR-V12 do not require NRC approval prior to their implementation since they are in accordance with the requirements of Attachment 1, Staff Position 2 of USNRC Generic Letter 89-04, " Guidance on Developing Acceptable Inservice Testing Programs."
We trust that the enclosed information is satisfactory; however, should you so desire, we would be happy to meet with you.
Should you have further questions regarding this - information, please contact Mr. L.A. Tremblay at (508) 779-6711 ext 2383.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORP.
ames P. Pelletier Vice President - Engineering Attachments cc:
(with attachments)
USNRC Regional Administrator, Region I USNRC Resident Inspector, VYNPS
/
USNRC Project Manager, VYNPS 9504070119 950331 h(
PDR ADOCK 05000271
\\
p PDR L
T
't 9
VERMONT YA'NKEE NUCLEAR POWER CORPORATION -
un L
i Attachment A l
.-References a)
License No. DPR-28 (Docket No. 50-271)-
b)
Code of ' Federal Regulations, Title 10 Chapter1,'Part 50,
{
Section 50.55a, 56 Fed. Reg. 4666,-dated 08/06/92 i
ASME Boiler and Pressure Vessel Code, _ Section XI, 1980 c) ' Edition,
" Rules for Inservice Inspection of Nuclear Power Plant Components" d)
ASME Boiler and Pressure vessel Code,Section XI, 1989 Edition, " Rules for Inservice Inspection ~ of Nuclear. Power Plant Components" j
e)
ASME/ ANSI Standard OMa-1988 Addenda to ASME/ ANSI OM-1987, i
" Operation and Maintenance of Nuclear Power Plants" f)
Letter, Mr.
P.M.
Sears, USNRC, to Mr.
L.A. Tremblay, VYNPC,
" Vermont Yankee Nuclear Power Station, Approval of the Use of l
ASME/ ANSI Standard OMa-1988 With Clarification," NVY 92-161, dated 09/02/92 l
g)
Letter, Mr. J.P. Pelletier, VYNPC, to Document Control Desk, l
USNRC, " Vermont Yankee Nuclear Power Corporation Inservice Testing Program Update," BVY 92-98, dated 08/13/92
_j i
h)
Letter, Mr.
V.
Nerses, USNRC, to Mr.
L.A.
Tremblay, VYNPC,
" Safety Evaluation - Inservice Testing-(IST) Program Relief Requests - Vermont Yankee Nuclear Power Corporation, Vermont Yankee Nuclear Power Station ( TAC No. M82229 ), " NVY 92-79, dated 05/13/92 1
i)
Letter, Mr.
W.P.
Murphy, VYNPC, to Document Control Desk,
(
USNRC, " Response to USNRC Generic Letter 89-04: Guidance on i
Developing Acceptable Inservice Testing Programs", BVY 89-90, j
dated 10/03/89 j)
Letter, Mr. S.A. Varga, USNRC, to All-Holders of Light Water Reactor Operating Licenses and Construction
- Permits, j
" Guidance on Developing Acceptable Inservice Testing Programs
{
(Generic Letter 89-04)", NVY 89-75, dated 04/03/89 j
l k)
Letter, Mr.
D.H.
Dorman, USNRC to Mr.
D.A.
Reid, Safety Evaluation of the Inservice Test Program Relief Requests for Pumps and Valves, Vermont Yankee Nuclear Power Station (TAC i
No. M85067) dated September 3, 1993.
)
l A-1 l
. VERMONT YANKEE NUCLEAR POWER CORPORATION.-
G i
f Attachment B Vermont Yankee Third-Interval' Inservice Testing Program Plan Revision'17 3
Relief Request Status Summary:
Pump IST Program Plant Felief Reauest No.
Status l
L LRR-P01, Rev. 1 Interim Relief Approved (TER Section 2.1.1.1)
Awaiting Approval of Revised Relief Request (Rev.16)
RR-P02, Rev. O Relief Request Approved (TER Section 2.2.1.1)
RR-P03, Rev. O Relief Request Approved (TER Section 2.2.2.1)
RR-PO4, Rev. O Relief Request Approved (TER Section 2.2.3.1)
RR-POS, Rev. O Relief Request Approved (TER Section 2.3.1.1)
RR-P06, Rev. O Relief Request Approved (TER Section 2.4.1.1)
RR-P07, Rev. O Relief Request Withdrawn (Rev.16)
RR-P08, Rev. O Relief Request Approved (TER Section 2.5.2.1)
RR-P09, Rev. O Relief Request Approved (TER Section 2.6.1.1)
RR-P10, Rev. O Awaiting USNRC Approval (Rev. 16)
RR-V01, Rev. 1 Relief Request Withdrawn (Rev.16)
RR-V02, Rev. 1 Relief Request Withdrawn (Rev. 16)
RR-V03, Rev. 1 Relief Request Approved (TER Section 3.8.1.1)
Page B - 1
3 VERMONT YANKEE NUCLEAR POWER CORPORATION
- j
! Valve IST Program Plan:
I Relief Reauest'No.
Status RR-V04, Rev. 1
-Relief Request Withdrawn-(Rev. 16)
- RR-VOS,-Rev. ~ 1 Relief. Request Withdrawn (Rev.
l')-
)
6 RR-V06, Rev. 0-Relief. Request Approved (TER' l
Section 3.3.1.1)
I RR-V07, Rev. 2 Relief Request Withdrawn-(Rev.115).
Refer to ROJ-V12.
RR-V08, Rev. O Relief. Request Approved (TER i
Section 3.5.1.1)
RR-V09,-Rev. 1
' Relief Request Withdrawn (Rev.16):
j RR-V10, Rev. O Relief Request Withdrawn (Rev.16)
RR-V11, Rev. O Relief Request Approved (TER
.Section 3.7.1.1) l RR-V12, Rev. O Relief Request Approved (Generic Letter 89-04, Attachment l',
Staff Position 2) r i
j t
i t
~
[
f t
Page B - 2 f
'W---v-h-v-
w v 7 ---
e s
,wm
.e
~nm e
FJ s
pc r
't
! VERMONT YANKEE NUCLEAR POWER CORPORATION' t
._ s r
I g..
.I i
t i't t
}
i 7
f;
-t i
Attachment C
~
Inservice Testing Program' Plan
{
t I
Revisio'n 17 f
t 6
E 1
n p
4 4
1 1
Page C - 1 1
-1
... - - - -, -