ML20082C692

From kanterella
Jump to navigation Jump to search
Forwards Rev 17 to IST Program Plan. Rev Changes Disassembly Frequency of Service Water Sys Check Valves V10-43A & V-43B
ML20082C692
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 03/31/1995
From: Pelletier J
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20082C696 List:
References
BVY-95-40, NUDOCS 9504070119
Download: ML20082C692 (5)


Text

_ . _ - - - - - _ , - _ - - - - _ _ _ - - -

4 VERMONT YANKEE' TNUCLEAR POWER CORPORATION y Ferry Road, Brattleboro, VT 05301-7002.

j f ENGINEERING OFFICE -

580 MAIN STREET '

BOLTON, MA 01740 (500)779-6711 BVY 95-40 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk.

Washington, D.C. 20555 References See Attachment A

Subject:

Vermont Yankee Inservice Test Program Plan ~ Revision 17 With this letter, Vermont Yankee submits Revision 17 of the Vermont Yankee Inservice Test Program Plan (Attachment C) for your information. This IST Program Plan revision ~ changes the disassembly frequency of Service Water System check valves V10-43A and V-43B. The justification for changing.the frequency of these valves is identified in a new relief request (RR-V12).

These IST Program Plan changes and relief request RR-V12 do not require NRC approval prior to their implementation since they are in accordance with the requirements of Attachment 1, Staff Position 2 of USNRC Generic Letter 89-04, " Guidance on Developing Acceptable Inservice Testing Programs."

We trust that the enclosed information is satisfactory; however, should you so desire, we would be happy to meet with you. Should you have further questions regarding this - information, please contact Mr. L.A. Tremblay at (508) 779-6711 ext 2383.

Very truly yours, VERMONT YANKEE NUCLEAR POWER CORP.

ames P. Pelletier Vice President - Engineering Attachments cc: (with attachments)

USNRC Regional Administrator, Region I USNRC Resident Inspector, VYNPS /

USNRC Project Manager, VYNPS 9504070119 950331 ADOCK 05000271 h(

PDR p PDR

\

L ..

T 't 9

un VERMONT YA'NKEE NUCLEAR POWER CORPORATION -  !

L i, Attachment A l

.-References  :

a) License No. DPR-28 (Docket No. 50-271)-

b) Code of ' Federal Regulations, Title 10 Chapter1,'Part 50,

{

Section 50.55a, 56 Fed. Reg. 4666,-dated 08/06/92 i ASME Boiler and Pressure Vessel Code, _ Section XI, 1980  ;

c) ' Edition, " Rules for Inservice Inspection of Nuclear Power  :

Plant Components" d) ASME Boiler and Pressure vessel Code, Section XI, 1989 ,

Edition, " Rules for Inservice Inspection ~ of Nuclear. Power Plant Components" j e) ASME/ ANSI Standard OMa-1988 Addenda to ASME/ ANSI OM-1987, i

" Operation and Maintenance of Nuclear Power Plants"  ;

f) Letter, Mr. P.M. Sears, USNRC, to Mr. L.A. Tremblay, VYNPC, .!

" Vermont Yankee Nuclear Power Station, Approval of the Use of l ASME/ ANSI Standard OMa-1988 With Clarification," NVY 92-161, ,

dated 09/02/92 ,

l g) Letter, Mr. J.P. Pelletier, VYNPC, to Document Control Desk, l USNRC, " Vermont Yankee Nuclear Power Corporation Inservice  ;

Testing Program Update," BVY 92-98, dated 08/13/92 _j i

h) Letter, Mr. V. Nerses, USNRC, to Mr. L.A. Tremblay, VYNPC,

" Safety Evaluation - Inservice Testing-(IST) Program Relief Requests - Vermont Yankee Nuclear Power Corporation, Vermont Yankee Nuclear Power Station ( TAC No. M82229 ) , " NVY 92-79,  ;

dated 05/13/92 l 1

i) Letter, Mr. W.P. Murphy, VYNPC, to Document Control Desk, (

USNRC, " Response to USNRC Generic Letter 89-04: Guidance on i Developing Acceptable Inservice Testing Programs", BVY 89-90, j dated 10/03/89  ;

j) Letter, Mr. S.A. Varga, USNRC, to All-Holders of Light Water Reactor Operating Licenses and Construction Permits, j

" Guidance on Developing Acceptable Inservice Testing Programs {

(Generic Letter 89-04)", NVY 89-75, dated 04/03/89 j l

k) Letter, Mr. D.H. Dorman, USNRC to Mr. D.A. Reid, Safety  :

Evaluation of the Inservice Test Program Relief Requests for  !

Pumps and Valves, Vermont Yankee Nuclear Power Station (TAC i No. M85067) dated September 3, 1993. l

)

l A- 1 l

. VERMONT YANKEE NUCLEAR POWER CORPORATION .- ,

G i Attachment B f Vermont Yankee Third-Interval' Inservice Testing Program Plan  !

Revision'17 3 Relief Request Status Summary:  ;

Pump IST Program Plant Felief Reauest No. Status l L LRR-P01, Rev. 1 Interim Relief Approved (TER Section 2.1.1.1) Awaiting Approval of Revised Relief Request (Rev.16)

RR-P02, Rev. O Relief Request Approved (TER Section 2.2.1.1)

RR-P03, Rev. O Relief Request Approved (TER Section 2.2.2.1)

RR-PO4, Rev. O Relief Request Approved (TER Section 2.2.3.1)

RR-POS, Rev. O Relief Request Approved (TER Section 2.3.1.1)

RR-P06, Rev. O Relief Request Approved (TER Section 2.4.1.1)

RR-P07, Rev. O Relief Request Withdrawn (Rev.16)

RR-P08, Rev. O Relief Request Approved (TER Section 2.5.2.1)

RR-P09, Rev. O Relief Request Approved (TER Section 2.6.1.1)

RR-P10, Rev. O Awaiting USNRC Approval (Rev. 16)

RR-V01, Rev. 1 Relief Request Withdrawn (Rev.16)

RR-V02, Rev. 1 Relief Request Withdrawn (Rev. 16)

RR-V03, Rev. 1 Relief Request Approved (TER Section 3.8.1.1)

Page B - 1

3 VERMONT YANKEE NUCLEAR POWER CORPORATION -j

! Valve IST Program Plan:

I Relief Reauest'No. Status RR-V04, Rev. 1 -Relief Request Withdrawn-(Rev. 16) -!

1

- RR-VOS,-Rev. ~ 1 Relief. Request Withdrawn (Rev. l')- 6 ) !

RR-V06, Rev. 0- Relief. Request Approved (TER' l Section 3.3.1.1) I RR-V07, Rev. 2 Relief Request Withdrawn-(Rev.115).  ;

Refer to ROJ-V12.

RR-V08, Rev. O Relief. Request Approved (TER i Section 3.5.1.1)

RR-V09,-Rev. 1 ' Relief Request Withdrawn (Rev.16): j RR-V10, Rev. O Relief Request Withdrawn (Rev.16) -l RR-V11, Rev. O Relief Request Approved (TER ,

.Section 3.7.1.1) l RR-V12, Rev. O Relief Request Approved (Generic Letter 89-04, Attachment l', Staff  :

Position 2) '

r i

j t

i t

~

[

f t

Page B - 2 f

'W---v-h- v- -

w v 7 --- e s . ,wm .e

- - - ~nm

FJ pc s

r

't

! VERMONT YANKEE NUCLEAR POWER CORPORATION' -

t

._ s r

I g..

.I i

t i

't t

}

i 7

f

-t i

~

Attachment C Inservice Testing Program' Plan {

t Revisio'n 17 I f

t 6

E 1

n p

4 4

1 1

1 Page C - 1 l 1

-1

. - . - _ . ,