Monthly Operating Rept for June 1991 for Jm Farley Nuclear Plant Unit 1
ML20082C464
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/30/1991
From: Dennis Morey, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9107190127
Download: ML20082C464 (5)


Text

F A'at,ama Powe' Commny 40 Inverneu, Ce,te' P<rka ti, Poc1 ONe Da= 1 "A Bmnyam A asena 35 01 Te:ephcme 7 3 N,!i Ma u

J. D. Woodard

/ Mill)i}[1][] f()W(T Vee Prewen-Na-; ear fa@-, Prcauct

'N r eo "r l

Docket No. 50-348 U.

S.

Nuclear Regulatory Commission ATTN Document Control Desk Washington, D. C.

20555 Gentlemen Joseph M.

Farley Nuclear Plant Unit 1 Monthly Operatina Data Peport Attached is the June 1991 Monthly Operating Report for Joseph M.

Farley Nuclear Plant Unit 1, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, k tu

~

. Woodard JAR:sc304-4351 Attachments cca Mr.

S.

D. Ebneter Mr.

S. T. Hoffman Mr.

G.

F. Maxwell 9107190127 910630 PDR ADOCr! 05000348 R

PDR

_fYAY

'I t

r JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS June 1991 There vas one unit shutdovn and one major power reduction during the month of June.

On June 2, power was reduced to approximately 20 percent to allow a containment entry to recalibrate three steam generator steam flow instruments. The instruments had been calibrated incorrectly during the recent refueling outage.

The unit returned to full power operation on June 4.

At 2045 on June 29, the reactor tripped due to a turbine / generator trip. The generator tripped due to lov side neutral overcurrent on unit auxiliary transformer IB.

The cause is still under investigation. The unit remained off-line through the end of the month.

The following major safety-related maintenance was performed during the month:

1.

The transformer was replaced on the 1A inverter.

2.

Annual maintenance was performed on the 1-2A diesel generator.

3.

Miscellaneous corrective and preventive maintenance vas perforr'd on the other diesel generators.

i 1

i e

l OPERATING IW'IA REPORT DOCKET No.__50-348 DA'IE July 5, 1991 COMPIJI"IED BY D. N. Morey I

'IELEPHONE (205)B99-5156 J

OPERATING S1A'IUS Notes

1. Unit Name:

Joseph M. Farley - Unit i

1) Cumulative data since
2. Reporting Period:

June 1991 12-1-77, date of

3. Licensed Thermsl Power (PMt):

2,652 comercial operation.

4. Nameplate Rating (Gross MNe):

860

5. Design Electrical Rating (Net MNe):_ 829
6. Maximum Dependable Capacity (Gross MWe):

856.4

7. Maximum Deperdable capacity (Net MWe):

814.0

8. If Changes Occur in Capacity Ratings (Items Number 3 'Ihrough 7) Since Last Report, Give Reasons: N/A i
9. Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A I

'Ihis Month Yr-to-Date Cumulative

11. Hours In Reporting Period 720 4343 119,039
12. Number Of Hours Reactor Was Critical 695.0 2608.8 91,563.1
13. Reactor Reserve Shutdown Hours 0.0 0.0 3 650.0
14. Hours Generator On-Line 692.8 2559.4 885f'.I-
15. Unit Reserve Shutdown Hours uT 0.0 0.0
16. Gross 'Ihermal Energy Generated (MWH) 1,777,930 6,484,551 230,118,532
17. Gross Electrical Energy Generated (MWH) 571,110 2,093,990 74,144,32 F l

l

18. Net Electrical Energy Generated (MNH) 539,874

~1,961,436 69,964,968

19. Unit Service Factor 96.2 58.9 75.6
30. Unit Availability Factor 96.2 58.9 75.6
21. Unit Capacity Factor (Using MDC Net) 92.1 55.5 72.7
22. Unit Capacity Factor (Using DER Net) 90.4 54.5 70.T
33. Unit Forced Outage Rate 3.8 2.1 7.3
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A l

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 08/06M7 08/09M7 INITIAL ELECTRICITY 08/20M7 08/18M7 COMMERCIAL OPERATION 12/01/77 12/01M7 Form 2/34 i

l

,~-

DOCKET No.

50-348 UNIT 1

MTE July 5, 1991 COMPLET1CD BY D.' N..Morey TELEPHONE (205)899-5156 M0tml June DAY AVERAGE MILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 4

(M4e-Net)

(N4e-Net) 1 764

-17 809 2

99 18 810 3

716 19 811 4

807 20 809 5

810 21 806

- 6 813 22 807 7

816 23 809 8

815 24 810

- 9 813 25 811 10 810 26 813 11 809 27 810 1

12 808 28 809 13-809 29 699 14 811 30 0

15 810 16 807 INSTRUCTICNS

.On this format,-list the average daily unit power level in MWe-Net for each day in the reporting month.. Compute to the nearest whole megawatt.

Form 13/21

_ _ _,. _. _..... _ _ _ _.. _ _. _. ~.. _. _ _ _ _ _ _.

, _ _ - _ ~-.

'tNEIr smWTDouBS AND POWER REDUCrIONS 90cxET 30.

50-348

'~

W mm.

J. M. FARf2Y - URIT 1" DarE July 5, 1991 COMP 12TED BY D. 5. NOREY

~

arroer nonrE Ja E nia o.E r2.sie,,-siss

- l.

I t

1

-1 l nEr== or -

I r.rcE S.E I

1.

I cast. - crrvE I

~ l 1-1 I== Arrow I I smarrrma l Ener i srsn n I coneo Enr I

acrzou w IL 4

2 lmo.

I oArE I rrrE l (mooms) l mEAso.2 l,,,,,,,c,,,3 l,,,,,,, l co,,4 lco,,5 l

,,,,,,,,,c,,,,,c, l

l884

'l 910601

.l F

l 6.0 l

8

'l 5/A

'l N/A l

SS l'

FI l Power was reduced to approximately 20 percent to, l

. l l.

'l l

l l

l l

.l l allow a containemet optry to reCalibrate three l '

l l

l l

l l

l l

l l steam generator steem flow instruments. 'These l

l l

l l

l l

l l

l l instruments were calibrated incorrectly during the l f

l l

l l

l l

l l

l lrecoat refueling outage. The procedures for l

. l l

~l l --

l.

l l

l l

l calibration of these instrumsets have been l

I i

1 I

I I

I I

I feeh==ced.

I i

i 1.

I i

1.

I-

.I I

I I

I I

I I

I I

I I

I I

I I

l005 l 910629 l

F l

27.3 l

A' l

3

.l 91-407-40 l EA l

IFMR.

lThe reactor tripped doe to a' turbine /gemerator trip l l

l l

l l

l l

l

-l l caused by low side neutral overcurrent om unit l

)

l l

l l

l l

l l

l l auxiliary transformer 18.

he la unit auxiliary l

l l

l l-l l

l l

l l

l transformer has been removed free service and the l l

l l

l l

l l

l l

. laffected loads are being supplied power from the l

l l

l l

l l

'l l

l l associated startup transformer.

l l

l l

1 I

I I

I I

I I

i i

i i

i l

i l

i I

i i

I I

I i

1 l

i I

I l-1 I

I l

l 1

1 I

I I

I i

l i

i l

I

~l l

I I

I I

+

1 1

I I

I I

I I

I I

I I

I I

I i

l l

1 1

I I

I I

I I

I I

I l

i I

I I

I l

l I

I I

I I

i i

i F: Forced Reason:

Method:

Exhibit G-Instructions

)

5: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Omta l

S-Maintenance or Test 2-Manual scram.

Entry Sheets for Licensee

(

c-Refueling 3-Antomatic Scram.

Event Report (IAR) File (NUBEG-D-Regulatory Restriction 4-other (Explain) 9161)

E-Operator Training & License Exaulnation F-Administrative Eakibit I -Same source G-Operational Error (Explain) s-other (Explain l t'

i l

r l

m Ptum V2

- -