ML20082C454
| ML20082C454 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/30/1991 |
| From: | Dennis Morey, Woodard J ALABAMA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9107190123 | |
| Download: ML20082C454 (5) | |
Text
.
Afcewa N #rcen
.o in...% n ce w rx, o, Pes.t ove su 1: m
.krmnpm, Ar r,i N1 l e ym.y... % hQ N rjt, n
J. o. woodard Alill);1r11;l Powei-vu rutar
..m July 15, 1991 Docket No. 50-364 U.
S.
Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.
C.
20555 Gentlemen:
Joseph M.
Farley Nuclear Plant Unit 2 Monthly pperatina Data Fecort Attached is the June 1991 Monthly Operating Report for Joseph M.
Farley Nuclear Plant Unit 2, as required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted, Woodard JAR:sej04-4351 Attachmento cca Mr.
S.
D.
Ebneter l
Mr.
S.
T. Hoffman Mr.
G.
F. Maxwell l'
l l
l l
?107190120 910/.10 PDR ADOC i : 05000764 R
PDR f"h h Ill
l JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS June 1991 On June 15, power was reduced to approximately 70 percent to perform governor valve testing and maintenance on condensate pump 2A.
There were no other unit shutdowns or major power reductions during the month.
The following major safety-related maintenance was performed during the month:
1.
Corrective and preventive maintenance was performed on the 20 charging pump.
2.
The oil cooler was replaced on the 2D scrvice water pump.
3.
Miscellaneous corrective and preventive maintenance was performed on the diesel generators.
i l
I I
l 1
~-
---~
OPERATING DMA REPORT DOCKET No. 50-364 DM1C July 5, 1991 COMPLET1lD BY D. N. Morey TELEPHWE (205)B99-5156 OrsRATIto 8117Us Notes
- 1. Unit Name Joseph M. Farley - Unit 2
- 1) Cumulative data since
- 2. Reporting Period:
June 1991 7-30-81, date of
- 3. Licensed Thermal Yower ( Et):
2,652 ccamercial operation.
- 4. Nameplate Rating (Gross MNe):
860
- 5. Des!gn Electrical Rating (Net W e): 829
- 6. Maxinom Dependable capacity (Gross Me):
864.2
- 7. Maximum Dependable Capacity (Net We):
824.0
- 8. If Changes Occur in Capacity Ratin',s (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A j
- 9. Power Level To which Restrit ted, If Any (Net MWe):
N/A 10 Reasons For Restric*ime, If Any N/A j
this Month Yr-to-Date Cumulative l
11.. Hours In Reporting Period 720 4,343 86,952
- 12. Number Of Hours Reactor Was Critical 720.0 4,082.9 74.467.1
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 UED
- 14. Hours Generator On-Line 720 0 3,988.0 73,539.2 15.. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,905,656 10,283,840 187,487,789
- 17. Gross Electrical Energy Generated (MWH) 618,580 3,349,270 61,555,226 18.' Net Electrical Energy Generated (WH) 589,580 3,178,256 58,372,378
-19. Unit Service Factor 100.0 91.8 84.6
- 20. Unit Availability Factor 100.0 91.8 84.6
- 21. Unit Capacity Factor (Using MDC Net) 99.4 88.8 81.9
- 22. Unit capacity Factor (Using DER Net) 98.8 88.3 81.0
- 23. Unit Forced Outage Rate 0.0 5.4
-4.4 2.*
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Come rcial Operation):
Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COPWEERCIAL OPERATIN 08/01/B1 07/30/81 rorm 2/30
-a DOCKET No.
50-364-UNIT 2
mTE July 5,-1991 COMPLETED BY D.,
N.- Morey TELEPHONE (2051890-5156-JOm!
June MY AVERAGE MILY POWER LEVEL DAY AVERAGE MILY POWER LEVEL
(!9fe-Net)
(We-Net) 1
-809 17 817 2
806-18 817 3
816 19 819 4
816 20 819 5
822 21 819 6
826 22' 817 7
828 23 818 8-829~
24 820 9
828 25 820 10 825 26 822
-11 82' 27 821 s
-12 823 28 819 13
=824 29 818 14' 822 30 816 15 812 16 776 INSTRUCTICNS on this format, list the average daily unit power level in me-Net for each day in the reporting month. Compute to the nearest whole megawatt.
rorm 13/21
e UNIT SNt M,S AND POWER EEDUCTIOfES DOCEET NO.
50-354 UNIT NAME J. M. 7ARLET - UNIT 2 DATE Jsly 5, 1991
~
COFTLETED BT D.
N.
FORET TE!EFNONE (2057899-51 %
REPORT MONTH JUNE l
l l
l l
l METBOD OF l LICENSEE l l
l CAUSE & CURRECTIVE l
l l
l l
l DURATION l l SHUTTING l EVENT l SYSTEM l COMPONENT l
ACTION TO e
lMO.
l DATE l TTFE l (NOURS) l REASON l DOWN REACTCR l REPORT 8 l CODE l CODE l
FREVENT RECURRENCE l
l Reduced power to appreaimately 70 percent to l
l006 l 910615 l
5 l
0.0 l
8 l
N/A l
E/A l
TA l
XCT l
l l
l l
l l
l l
l l perform governor valve testing and maintenance en 1
l 1
I i
i i
1 i
leondensate a==9 A.
I I
I I
I I
I i
1 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I i
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
l' I
I I
I i
I I
I I
I I
I I
i i
i I
I I
I I
I I
I I
I I
I i
i i
I l
l 1
I i
I i
i i
l I
i i
i i
I i
i i
i l
i I
I I
I I
I I
I i
l i
l i
i i
l l
I I
I l
i I
I I
I I
I I
I I
i l
i l
I i
i l
I i
i i
l i
i l
I i
i i
i i
l i
l i
l I
l 1
i l
i l
I i
i i
i l
I i
l i
i i
l i
l i
l i
I I
I I
I I
I I
i i
l I
l i
l i
l i
- Ezhibit G-Instructions Method:
F: Forced Reason:
3: Scheduled A-Equipment Failure (Explain) 1-Manus 1 for Properation of Data 2-1.anual Scram.
Entry Sheets for Liceuseo 8
B-Maintenance or Test 3-Automatic Scram.
Event Report (LER) File (NUREG-C-Befueling 4-other (Explaing 0161)
D-megulatory Restriction E-operator Training & License Examination Eshibit I -Saoe Source F-Administrative G-operational Error (Explaini N4ther (Emplain)
M Rx2a M