MONTHYEARML20211K0641999-09-0101 September 1999 Proposed Tech Specs,Changing Definition of Azimuthal Power Tilt in TS 1.1,correcting Peak Linear Heat Rate Safety Limit in TS 2.1.1.2,correcting Dc Voltage & Degraded Voltage Settings in SR 3.3.6.2 & Correcting Typo in TS 5.6 ML20211G7681999-08-27027 August 1999 Proposed Tech Specs,Allowing Placement of One or More Fuel Assemblies on SFP Rack Spacers to Support Fuel Reconstruction Activities While Irradiated Fuel Assembly Movement Continues in SFP ML20207F0261999-06-0101 June 1999 Third Interval Inservice Insp Program Plan for Ccnpp,Units 1 & 2 ML20195B2751999-03-31031 March 1999 Rev 0 to Rept 98-FSW-021, Corrosion Test of SG Tubes with Alloy 800 Mechanical Sleeves ML20204H6011999-01-29029 January 1999 Age Related Degradation Insp (Ardi) Program Technical Requirements Document for Mechanical Systems ML20196E2191998-11-30030 November 1998 Proposed Tech Specs,Allowing Repair of Defective SG Tubes with leak-limiting Alloy 800 Repair Sleeves ML20195K3831998-11-20020 November 1998 Proposed Tech Specs Removing TS Originally Developed from Reg Guide 1.35 & Implementing Requirements of 1992 Edition Through 1992 Addenda of ASME B&PV Code Section XI, Subsections IWE & Iwl,Per 10CFR50.55a ML20195J7181998-11-19019 November 1998 Proposed Tech Specs 3.7.6, SWS, Adding One SWS Heat Exchanger Inoperable as New Condition for LCO 3.7.6 ML20155F7001998-10-30030 October 1998 Proposed Tech Specs Bases,Revs 1,2 & 3 Re List of Effective Pages for Plant ML20154N1961998-10-16016 October 1998 Proposed Tech Specs Pages,Revising TS 3.3.1 & 3.3.2 to Clarify Inconsistency Between TS Wording & Design Bases as Described in TS Bases & UFSAR ML20198A2981998-09-15015 September 1998 Technical Procedure CP-217,rev 7,PCR 98-034, Specifications & Surveillance,Secondary Chemistry ML20198A3131998-09-15015 September 1998 Technical Procedure CP-224,rev 4,PCR 97-049, Monitoring Radioactivity in Systems Normally Uncontaminated ML20236S5621998-07-20020 July 1998 Proposed Tech Specs Providing Alternate Cooling Water Supply to Maintain EDGs Operability During 1999 Refueling Outage ML20195B2861998-06-0505 June 1998 Rev 0 to Rept 98-TR-FSW-005, Test Rept on Alloy 800 Mechanical Sleeve-Addl Qualification Testing Using Low Yield Strength Tubing ML20217D2691998-04-21021 April 1998 Proposed Tech Specs Re Change to Reactor Coolant Sys Flow Requirements to Allow Increased SG Tube Plugging ML20216H0831998-03-16016 March 1998 Rev 13 to Proposed TS Re Conversion to Improved TSs ML20198A2911998-02-23023 February 1998 Technical Procedure CP-206,rev 4,PCR 98-034, Specifications & Surveillance Component Cooling/Service Waster System ML20199J5281998-01-28028 January 1998 Proposed Tech Specs,Converting to Improved TSs ML20198K9851998-01-12012 January 1998 Rev 11 to Proposed Tech Specs,Reflecting Conversion to Improved Sts,Per NUREG-1432 ML20198R7331997-11-0505 November 1997 Proposed Tech Specs Pages Re Rev 10 to Convert to Improved TS ML20217K6161997-10-23023 October 1997 Proposed Tech Specs Section 3.8 Re Change Request to Convert to Improved Std TSs ML20217K6671997-10-22022 October 1997 Proposed Tech Specs Incorporating Both Steady State & Transient Degraded Voltage Setpoints Into Tss,As Opposed to Current Single Degraded Voltage Setpoint ML20198K3321997-10-20020 October 1997 Proposed Tech Specs Section 3.3 Re Change Request to Convert to Improved Std TSs ML20217G3571997-10-0606 October 1997 Proposed Tech Specs Section 3.6 to Reflect Conversion to Improved STS ML20217G3781997-10-0606 October 1997 Proposed Tech Specs Section 3.7 Re Change Request to Convert to Improved STS ML20211J2751997-10-0202 October 1997 Proposed Tech Specs,Reflecting New Electrical Capacity for 1B Edg.Significant Hazards Considerations Associated W/Change Have Been Evaluated ML20217C7361997-09-29029 September 1997 Proposed Tech Specs Page Omitted from 970609 License Amend Request Re Conversion to Improved TSs ML20211J2981997-09-18018 September 1997 Pump & Valve IST Program Third Ten-Yr Interval for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20210T8701997-09-10010 September 1997 Proposed Tech Specs Rev 5 to Section 3.4 of Original License Amend Application & Other Changes Identified by Personnel ML20210K9711997-08-14014 August 1997 Proposed Tech Specs,Reflecting Removal of TSTF-115,as Well as Other Changes Identified by Plant Personnel ML20149H5821997-07-21021 July 1997 Rev 2 to TS Sections 4.0 & 5.0,converting to Improved Std Tss,Per NUREG-1432 ML20148P7171997-06-27027 June 1997 Proposed Tech Specs Revising Wording to Support Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes ML20141G4471997-06-16016 June 1997 Ccnpp Unit 2 Cycle 12 Startup Testing Rept ML20141D9341997-05-0909 May 1997 Radiation Safety Procedure 1-104, Area Posting & Barricading & High Radiation Area Pre-Entry Checklist ML20135F0441997-03-0606 March 1997 Proposed Tech Specs,Superceding Previously Submitted Marked Up Pp for ABB-CE Sleeves.New Info to Be Incorporated in Updated Licensing rept,CEN-630-P,Rev 01, Repair of 3/4 OD SG Tubes Using Leak Tight Sleeves ML20134E3221997-02-0303 February 1997 Proposed Tech Specs for Vol 16,Unit 1 Current Markup Improved Conversion License Amend Request ML20134E3361997-02-0303 February 1997 Proposed Tech Specs Vol 17,Unit 2 Current Markup Improved Conversion License Amend Request ML20134D3041997-01-31031 January 1997 Proposed Tech Specs Re Requirements to Allow Increased SG Tube Plugging ML20210P3971996-12-0404 December 1996 Rev 2 to RP-2-101, Administrative Procedure Radwaste Mgt ML20135A5231996-11-26026 November 1996 Proposed Tech Specs Adopting Option B of 10CFR50,App J to Require Types B & C Containment Leakage Rate Testing to Be Performed on performance-based Testing Schedule ML20134N1831996-11-20020 November 1996 Proposed Tech Specs 6.0 Re Administrative Controls ML20210P3871996-10-17017 October 1996 Rev 2,Change 0 to Offsite Dose Calculation Manual ML20128Q8041996-10-14014 October 1996 Cycle 13 Summary of Startup Testing ML20128H6031996-10-0303 October 1996 Proposed Tech Specs,Changing Provisions for Receiving, Possessing & Using Byproduct,Source & Special Nuclear Matl at Plant ML20117L7991996-09-10010 September 1996 Proposed Tech Specs 3/4.3 Re instrumentation,3/4.5 Re ECCS & 3/4.6 Re Containment Sys ML20117L3441996-09-0404 September 1996 Proposed Tech Specs Clarifying License Amend Request Re Implementation of Changes to Radiological Effluent TSs as Proposed by GL 89-01 ML20116F8281996-08-0101 August 1996 Proposed Tech Specs Re Use of Blind Flanges in Place of Containment Purge Valves During Operation ML20116E3771996-07-26026 July 1996 Proposed Tech Specs Allowing Repair of Defective SG Tubes by Electrosleeving ML20117F6431996-05-15015 May 1996 Proposed Tech Specs Section 6.0, Administrative Controls ML20101K6011996-03-28028 March 1996 Proposed TS Figure 3.1.1-1 Re Change to Moderator Temp Coefficient 1999-09-01
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20207F0261999-06-0101 June 1999 Third Interval Inservice Insp Program Plan for Ccnpp,Units 1 & 2 ML20204H6011999-01-29029 January 1999 Age Related Degradation Insp (Ardi) Program Technical Requirements Document for Mechanical Systems ML20198A2981998-09-15015 September 1998 Technical Procedure CP-217,rev 7,PCR 98-034, Specifications & Surveillance,Secondary Chemistry ML20198A3131998-09-15015 September 1998 Technical Procedure CP-224,rev 4,PCR 97-049, Monitoring Radioactivity in Systems Normally Uncontaminated ML20198A2911998-02-23023 February 1998 Technical Procedure CP-206,rev 4,PCR 98-034, Specifications & Surveillance Component Cooling/Service Waster System ML20211J2981997-09-18018 September 1997 Pump & Valve IST Program Third Ten-Yr Interval for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20141D9341997-05-0909 May 1997 Radiation Safety Procedure 1-104, Area Posting & Barricading & High Radiation Area Pre-Entry Checklist ML20210P3971996-12-0404 December 1996 Rev 2 to RP-2-101, Administrative Procedure Radwaste Mgt ML20210P3871996-10-17017 October 1996 Rev 2,Change 0 to Offsite Dose Calculation Manual ML20095G7841995-10-12012 October 1995 Change 95-086 to Rev 4 to Technical Procedure CP-217, Specs & Surveillance:Secondary Chemistry ML20095G7621995-09-27027 September 1995 Rev 2 to Administrative Procedure NO-1-106, Functional Evaluation/Operability Determination ML20095G7771995-05-23023 May 1995 Rev 0 to Administrative Procedure RM-1-103, Commitment Mgt ML20095G7661995-02-27027 February 1995 Rev 3 to Administrative Procedure QL-2-100, Issue Reporting & Assessment ML20078A3611995-01-18018 January 1995 Change 5 to Rev 0,to Program Plan for Second Insp Interval for Plant,Units 1 & 2 ML20072T4141994-08-29029 August 1994 Rev 0,Change 1 to Emergency Response Plan Implementation Procedure,Erpip 203.Change Replaces Entire Procedure ML20072T3741994-08-29029 August 1994 Rev 1,Change 3 to Emergency Response Plan Implementation Procedures,Erpip 201.Rev Replaces Pages 3 & 4 & Review/ Approval Page ML20095G7781994-08-19019 August 1994 Rev 0 to Administrative Procedure MN-3-111, Erosion/ Corrosion Monitoring of Secondary Piping ML20064F2221993-09-0101 September 1993 Rev B/Change 1 to Calvert Cliffs Instruction CCI-803, Radioactive Matls Mgt ML20064F2011993-08-26026 August 1993 Rev 1,Change 0 to Odcm ML20095G7551993-08-11011 August 1993 Rev 0 to Administrative Procedure NS-1-300, Industry Operating Experience Info Processing ML17179A8601993-03-12012 March 1993 Rev 1/Change 0 to LCM-11S, Component Level Itlr Screening Procedure for Structures. ML20044C5291993-03-0101 March 1993 Rev 4/Change 0 to LCM-11, Life Cycle Mgt Component Level Itlr Screening Procedure for Sys. ML20056F5701993-02-18018 February 1993 Rev 0 to Change 1 to Odcm ML20118A8241992-09-18018 September 1992 Technical Criteria & Procedures Used for Generation of In- Structure Response Spectra ML20091N3031992-01-0606 January 1992 Rev 10 to Support Procedures - Media Response Procedure ERPIP-B.2, Off-Site Survey Points. Rev Deletes Photographs of off-site Points ML20077R2701991-08-31031 August 1991 Rev 2 to Calvert Cliffs Nuclear Power Plant Fitness-for-Duty Manual ML20058E5571990-10-29029 October 1990 Rev 5 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program ML20059H2871990-09-0707 September 1990 Rev 4 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program ML20044B0421990-07-13013 July 1990 Rev 3 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program. ML20042E8291990-04-30030 April 1990 Rev 2 to Calvert Cliffs Performance Improvement Plan Implementation Program. ML20042G3771990-04-16016 April 1990 Changes 1-3 to Rev 0 to Program Plan for Second Insp Interval for Calvert Cliffs Nuclear Plant,Units 1 & 2. ML19332F3041989-12-0808 December 1989 Rev 3 to Surveillance Test Procedure STP-M-662-2, Integrated Leak Rate Test,Unit 2 Containment. ML20246L7641989-08-14014 August 1989 Corrected Pages for Substitution Into Performance Improvement Plan (PIP) Implementation Program & Table 1.4 Which Sorts PIP Action Plans by Root Cause & Updated Schedule & Resource Summaries ML20247M5741989-07-31031 July 1989 Performance Improvement Plan Implementation Program ML20248H8121989-04-30030 April 1989 Performance Improvement Plan ML20204G5821988-09-26026 September 1988 Rev 1 to ASME Section XI Pump & Valve Test Programs-Units 1 & 2 Second 10-Yr Interval ML20029A7671988-07-27027 July 1988 Rev 1 to Chemistry Procedure CP 607, Offsite Dose Calculation Manual. ML20154J0991988-02-10010 February 1988 Operating Manual;Emergency Operating Procedures ML20148L6431987-11-30030 November 1987 Program Plan for Second Insp Interval for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20239A0561987-02-28028 February 1987 Operating Procedure OP-17-60-016-0, Ultrasonic Thickness Measurement Piping Using Swri Thickness Data Acquisition Sys ML20205P4611986-12-31031 December 1986 Rev 0 to ASME Section XI Pump & Valve Test Programs - Units 1 & 2,Second 10-Yr Interval ML20198H4271986-03-26026 March 1986 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to Erpip 4.1.3, Technical Support Ctr Roster, Rev 9 to Erpip 4.1.4, OSC Roster & Rev 10 to Erpip 4.1.17, Security. W/860522 Release Memo ML20198C5061985-11-0101 November 1985 Supplemental Program Plan for Dcrdr ML20138A3931985-09-20020 September 1985 Rev 9 to Emergency Response Plan Implementation Procedure Erpip 5.0, Preparation & Control of Emergency Response Plan & Implementation Procedures ML20236U2791985-08-0505 August 1985 Rev 3 to Operating Procedure X-FE-101-3, Onsite NDE Records Control ML20090B5881984-05-0202 May 1984 Public Version of Revised Emergency Response Plan Implementation Procedures,Including Rev 10 to Erpip 4.1.17, Rev 9 to Erpip 5.4 & Rev 2 to Erpip A.2 ML20090B6891984-04-18018 April 1984 Public Version of Rev 15 to Emergency Response Plan Implementing Procedure Erpip A.1, Emergency Organization Telephone Numbers ML20087F2591984-03-14014 March 1984 Instruction CCI-310, Emergency Operating Procedure Writers Guide. Emergency Operating Plan Validation/Verification Plan & Training Plan Encl ML20155H2161984-02-20020 February 1984 Remote I/O Equipment Hardware Acceptance Test Procedure for NUS Corp/Bg&E Calvert Cliffs Data Acquisition Sys ML20106H1901984-02-0202 February 1984 Remote I/O Hardware Acceptance Test Procedure for NUS Corp/Bg&E Calvert Cliffs Data Acquisition Sys at Computer Products,Inc 1999-06-01
[Table view] |
Text
. .
ERPIP 4.1.16 Rev. 3, Ch.1 TITLE: EMERGENCY FIRE TEAM LEADER CHECKLIST 1.0 RESPONSIBLE INDIVIDUAL The Emergency Fire Team Leader is responsible to the Site Emergency Coordinator .
for the following:
i.1 Control, contain and extinguish the fire.
i.2 Coordinate the actions of any outside fire fighting organization called in to assist in fighting the fire.
- 1.3 Provide personnel to be members of the Emergency Reentry Team.
2.0 CONDITIONS AND PREREQUISITES 2.1 Discovery of an inplant fire.
2.2 As directed by the Site Emergency Coordinator.
3.0 ACTIONS AND LIMITATIONS (At or near the scene of the fire).
-NOTE-Checklists are to be used as determined by the EFTL. Spaces for initials and times are to be utilized, as necessary, to clarify the status.
3.1 Proceed to the scene to evaluate the fire and direct fire fighting efforts.
Arrived on the Scene: /
initials Time Ch.1 3.2 Ensure immediate actions implemented in accordance with ERPIP 3.1, as necessary.
/ Ch.1 ERPIP 3.1 Implemented:
Initials Time 3.3 De-energize electrical equipment in the immediate vicinity of the fire, if possible.
Equipment De-energized (check one): ( ) Yes
( )No 4 /
1 Initials Time
' -NOTE-t ..
! Any equipment de-energization decision should be based on an on the scene b
B311210509 831116 l PDR ADOCK 05000 4.1.16-1 F
i
ERP!P NO.: 4.1.16 / REV. 3 DATE: October 2,1981 evaluation of the components involved and plant conditions. Operations should be consulted to eliminate indecision.
3.4 Ensure ait personnel at the scene are wearing self-contained breathing ,
apparatus, as needed. ,.
Personnel Wearing A;paratus (circle one):
Yes No /
Initials Time 3.5 Nctify outside fire fighting agencies of fire,if warranted.
Cuuide Agencies Notified (circle one):
Yes No /
Initials Time 3.6 Notify Security of specific locations or area of fire and that outside assistance rst or has not been called.
Security Notified: /
Initials Time If outside assistance has been called, have team members meet responding 3.7
}
units at the gate for direction, or request security to escort. -
Responding Units Met at Gate and Provided with Equipment as N'ecessary:
/
Initials Time 3.3 Use all available extinguishers and fire hoses to combat the fire.
3.9 If a controlled area is involved, attempt to determine radiation c:ntaminatien, and airborne activity levels.
Detection of (circle as appropriate): .
j Radiation Yes No Level Contamination Yes No Level Airborne Activity Yes ' No Level l
l -NO TE-l
- The primary con:: erns are personnel safety. Consult Rad-chem l technicians, RPD or RAD prior to entering area of high radiation.
i' 3.10 Monitor all personnel and equipment leaving any potentially contaminated area.
1 1
4.1.16-2 l
,,,e-- ,- - - e.- ~ y, .e- , p,4 m w , , --w--+ y
- ERPIP 4.1.16 Rev. 3, Ch.1 3.11 Provide members for Reentry Team, if requested.
Personnel Provided:
/
Initials Time 3.12 Notify $EC of personnelinjuries as soon as possible.
SEC Notified: / .--
Initials Time 3.13 Record pertinent information on EMERGENCY ACTIONS FORM, App. B.3. Ch.1 e
9 h
4.1.16-3
\ -
, - - - - - - , , 3_ ,
ERP!P 4.1.16 REVIEW / APPROVAL k REVISION CHANGE REVIEWER SIG/ SUPERVISOR POSRC PLANT SUPERINTENDENT DATE EPU SIG/DATE MTG /DATE 0 } No&IO"*S95 $$h ro.,a 1083-12B 05und) Icktih,-
o h
9 m
9 e
O 9
b e
e e .. . .
e o
l 1
I ERFIP 4.1.16 Rev. 3, Ch. I LIST OF EFFECTIVE PAGES PAGE NUMBER REVISION .
4.1.16-1 3, Ch.1 -
4.1.16-2 3 4.1.16-3 3,Ch.1 e g
?
l l
l I
l l
l
! ERPIP 4.1.19 l Rev.3,Ch.1 i TITLE: EMERGENCY REPAIR AND DAMAGE CONTROL TEAM LEADER l CHECKLIST 1.0 RESPONSIBLE INDIVIDUAL (
The Emergency Repair and Damage Control Team Leader (ERDCTL)is responsible to provide for the assessment of equipment damage and to implement emergency repairs.
2.0 CONDITIONS AND PREREQUISITES 2.1 Declaration of an Alert, Site Emergency or General Emergency.
2.2 As directed by the Site Emergency Coordinator.
9 3.0 ACTIONS AND LIMITATIONS (In the Technica1 Support Center or the Control Room)
\
i NOTE-Cheddists are to be used as determined by the ERDCTL. Spaces for initials
,and times are to be utilized, as necessary, to clarify the status.
3.1 Assess and record (on existing plant documents) equipment damage.
Equipment Damage Assessed and Recorded: /
Initials Time 3.2 Assemble appropriately qualified personnel for the Emergency Repair and Damage Control Team and document on a Team List (See Appendix A.1).
Personnel Assembled and Team Documented: /
Initials Time
! 3.3 Assist Technical Support Center personnel in development of repair procedures and repair checklists.
3.4 Direct the repairs necessary to bring the plant and equipment to a safe l condition.
Ch.1 3.5 Record all pertinent data on EMERGENCY ACTIONS FORM, (APP. B.3) or on existing CCNPP documents.
~
l i
l 4.1.19-1 l
- . - - , , ,--,r- __ - ,.
9 , ,_ <w,. . , . - . , . , , , . , . , , - , ,, pg y
l l ERPIP 4.1.19 REVIEW / APPROVAL ,.
i ! REVISION CHANGE REVIEWER SIG/ SUPERVISOR POSRC PLANT SUPERINTENDENT DATE EPU SIG/DATE MTG /DATE 8 i M 4 L ,!0 4 85 WMr,o.as 83-It.s '1G V,,jj icluk , , .
l 1
l l
9
--- - ---...c.. , , , - , , , , , , , -
, , _ . . , , . , , . - , - - , , ,,,n. ,,_-,a-n. , .. . - ,, -..
1 l
l I
i 1
1 ERPIP 4.1.19 Rev. 3, Ch.1 UST OF EFFECTIVE PAGES PAGE NUMBER REVISION ,
4.1.19-1 3,Ch.1 e
e e
T i
ERPIP NO.: 4.1.20 / REV. 2 DATE: September 1,1981 TITLE: EMERGENCY RECOVERY AND RESTORATION TEAM LEADER CHECKLIST 1.0 R ESPONSIBLE INDIVIDUAL S
The Emergency Recovery and Restoration Team Leader (ERRTL)is responsible to the SEC for the following:
1.1 Ensuring that emergency conditions are not aggravated.
1.2 Restoring operating conditions to their original state or to an acceptable long-term condition.
3 1.3 Reviewing the safety instructions, plans and procedures of the work to be
! performed.
1 1.4 Building of temporary shielding walls or moving portable shielding walls into place.
1.5 Obtaining the necessary tools, materials and equipment required to make repairs.
1.6 Manipulating equipment or material as directed in the plans or procedures.
1.7 Assisting in evaluating conditions and criteria for the resumption of normal
( activities following termination of the emergency condition.
m 2.0 CONDITIONS AND PREREOUISITES As directed by the SEC.
3.0 ACTIONS AND LIMITATIONS (In Emergency Control Center or on the scene if major problems arise.)
-NOTE-Checklists are to be used as determined by the ERRTL. Spaces for initials l
and times are to be utilized, as necessary, to clarify the status.
l j 3.1 Initiate all actions required in ERPIP 4.9.
l ERPIP 4.9 Initiated /
! Initials Time l
l 3.2 Ensure the plant systems are in their safest alignment reasonably achievable before initiating recovery actions.
Plant Systems Aligned /
Initials Time
! 3.3 Ensure all safety instructions and procedures for recovery work and operations have been reviewed.
l 4.1.20-1 e
, _ - - -. - - m
ERPIP 4.1.20 Rev.3,Ch.I Safety Procedure Reviewed: /
In m ats Time 3.4 Ensure all necessary equicment and temporary shielding are availacle for use.
Equipment and Shielding Available: / *:
Initials Time 3.5 Ensure necessary tools and docwTientatien are available for ocerations and repan.
Tools Available: /
Init:als Time 3.6 Ensure personnel exoosures and limits are known and that stay times for werk areas are established. (Refer to ERPIP 4.6.1)
-NOTE-Exposure limits during recovery operations will be in accordance with 10CPR20 unless otherwise by ERPIP s.6.1, step 3.4 3.7 Continuously evaluate plant conditions including status of emergency and plant safety.
3.3 Review all actions required by ERPIP 4.9 to assure proper completion.
ERPIP 4.9 Appropriately Completed: / _
)
. Initials Time 3.9 Record all pertinent data on EMERGENCY ACTIONS FORM, (App B.3.) or Ch.1 existing CCNPP docanents.
1 l
l l
4.1.20-2
i i
ERP!P 4.1.20 REVIEN/ APPROVAL .-
REVISION CHANGE REVIEWER SIG/ SUPERVISOR POSRC PLANT SUPERINTENDENT ,
OATE EPU SIG/DATE MTG /DATE 0 b$bb 05
$N h m.n.Q 83128 ) Q Q,,,g ,jy/g
, g i
1 .
l 1
O j .
t I
W l'
- 1, 9
9
, , . - . - . - . _ . , , . -. ,._-,---,,...,_-.,_,...-,..,,,,.__.._.,_-.._,,_....,~,...-...w . -.
l
. ERPkP 4.1.20 l Rev. 3, Ch.1 J P-IlST OF EFFECUVE PEGES PAGE NUMBER REVISION 4.1.20-1 2 4.1.20-2 3,Ch.1
. I e
6 e
S I s ..
r l
i ,
ERPIP 4.1.21 Rev. 9, Ch.1 ATTACHMENT 2 PAGE l OF 2 C & D PERSONNEL ASSEMBLY / ACCOUNTABILITY TALLY C
ACCOUNTABILITY ASSEMBLY COMPLETE / INCOMPLETE Le PRODUCRON MAINTENANCE DEPARTMENT MODS - MECH l
MODS - ELLC/SUPP l
MAINTENANCE - UNIT 1 MAINTENANCE - UNIT 2 TRAINING & SUPPORT PE - N ME-N
~. NUCLEAR POWER DFPARTMENT PLANNING & SUPPORT Ch.1 o ADMIN SERVICES o PLANNING o PLANT DOCUMENTS o EMERG PLANNING CHEMISTRY o PLANT CHEMISTRY o PLANT LABOR
! o WATER TREATMENT RAD SAFETY l
o RAD CON o RAD SUPPORT o DOSIMETRY TRAINING & TECH SUPP o TRAINING l o OPER LIC & SAFETY o TECH SUPPORT o NFM OPERATIONS & ELEC/ CONTROLS l
- OVER -
l
1 i
I ERPIP 4.1.21 Rev. 9, Ch.1 ATTACHMENT 2 ',,
I PAGE 2 CF 2 C & D PERSONNEL ASSEMBLY / ACCOUNTABILITY TALLY i
ACCOUNTABILITY ASSEMBLY COMPLETE / INCOMPLETE l
QUALITY ASSURANCE DEPT PURCHASING & STORES DEPT REAL ESTATE & CFFICE SERVICES o BUILDING SERVICES o SECURITY SCREENLNG i o SECURITY TRAINLNG o SECURITY ADMIN / SUPPORT l
EMPLOYEE SERVICES DEPT
'. PROJECT MANAGEMENT DEPT -
ELECTRIC ENGINEERING DEPT r)
CONTRACTORS CATALYTIC I
AIRCO/INSULTEMP BECHTEL l .CE HEERY/ 5 & O 1
OTHER m
ERPIP 4.1.21 Rev. 9, Ch.1 ATTACHMENT 5 EMERGENCY TEAM ASSEMBLY / ACCOUNTABILITY TALLY ACCOUNTABILITY L EMERGENCY TEAM COMPLETE / INCOMPLETE TSC ENGINEERS DOSIMETRY TEAM GATE ACCESS MONITORING 4
FIRST AID TEAM ON-SITE MONITORING TEAM LIQUID MONITORING TEAM EMERGENCY CENTER MONITORING TEAM OFF-SITE MONITORLNG TEAM INSTRUMENT MAINTENANCE TEAM j ELECTRICAL MAINTENANCE TEAM MECHANICAL-MAINTENANCE TEAM The following persons have been reported missing:
NAME POSSIBLE LAST LOCATION l.
i 2.
3.
4.
5.
l l 6.
t, l
- 7. _
, 8.
i When completed, report accountability as soon as possible to Security (Ext. 4695 or 4696).
l'
- i. /
Assembly Leader Time Forward all records to Supervisor-Emergency Planning at emergency termination.
6
IRPU 4.2. 21 REVIEW / APPROVAL REVISION CHANGE REVIEWER SIG/ SUPERVISOR POSRC PLANT SUPERINTENDENT DATE EPU SIG/DATE MTG /DAT.
9 l $ .d.x.owersb}d v.nc INJ 9.i 7- l 7 2 W W n y k 'ce r b b 4 /n. U ;1 , WA/ VAL Aha !
0 -
(l[kl.IEM 'dks.hc.B $3 -f.2. .
()[b1,p f/act3 l 9 1 d/$L/"v8* fig.v L .,to
's3-/za 48[Lovfchih .
i l ~
- 1. , .
l l .
l l
l f
i I -
i
ERPIP 4.1.21 .
Rey. 9, Ch.1 11ST OF EFFECTIVE PAGES s PAGE NUMBER REVISION 1 9 2 9 3 9 4 9 ATTACHMENT REVISION l 1, Page 1 9 1, Page 2 9 2, Page 1 9,Ch.1 2, Page 2 9,Ch.1 3, Page 1 9 4, Page 1 9 3 5, Page 1 9,Ch.1 l
l L
\,
e n.- , - - -
ERPIP 4.1.22
' - Rev. 3, Ch. I m
TITLE: EMERGENCY COMMUNICATOR CHECKLIST 1.0 RESPONSIBLE INDIVIDUAL The Emergency Commmicator (ECOM) is responsible to assist the Site Emergency .
i Coordinator for communications and in the maintenance of Emergency Control Center records.
l I
2.0 CONDITIONS 2.1 Report of an emergency condition.
2.2 As directed by the Site Emergency Coordinator.
3.0 ACTIONS AND LIMITATIONS (In the Emergency Control Center)
-NOTE-Cheddists are to be used as determined by the ECOM. Spaces for initials and times are to be utilized, as necessary, to clarify the status.
3.1 Call Control Room to verify that an ECOM is stationed there.
i (Report to Control Room if appropriate as ECOM.) ,
3.2 Relay messages between the Site Emergency Coordinator and Control Room, the Operational Support Center, Technical Support Center, USNRC, County Emergency Operation Centers, and the Md. Division of Radiation Control, as required.
Ch.1 3.3 Provide reliable and accurate commmications.
3.4 Maintain records of outgoing and incoming communications to and from ECC including:
3.4.1 EMERGENCY MESSAGE FORM, Ch.1
. 3.4.2 Followup communication checklist (ERPIP 3.1) 3.4.3 Record all communications, (this includes telephone, radio, page and verbal activities directed by the SEC) Emergency Communication Ch.1 Form (App.B.3).
3.5 Provide SEC with periodic updates, as requested.
i I
.l 4.1.22-1 1
l .
l 1 .
t l ~
l
\
I .-
ERP!P 4.1.22 REVIEW / APPROVAL l
REVISION CHANGE REVIEWER SIG/ SUPERVISOR POSRC PLANT SUPERINTENDENT i DATE EPU SIG/DATE MTG /DATE
h $ m AQ 8 3 -12. S [R, i)s,_,,yj j,)g,{3 4
l i .
S 1
- 1 S
l
_ _ . , _ . _ . -_.._.__----_,__...__.1,...-___________._________________
1 ERPIP 4.1.22 Rev. 3,'Ch.1 -
LIST OF EFFECTIVE PAGES ,
1 l
PAGE NUMBER REVISION 4.1.22-1 3, Ch.1
'I i 1
)
l
.