Suppls 891207 Response to Generic Ltr 88-17 Re Loss of Dhr. All Hardware Changes Necessary for mid-loop Operation Completed During Unit 1 10th Refueling Outage & Unit 2 Seventh Refueling Outage
ML20082C057
Person / Time
Site: Farley  
Issue date: 07/08/1991
From: Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-88-17, NUDOCS 9107180004
Download: ML20082C057 (1)


Text

e 4,.m n, c.,

4J Pa t'

.. L' e i l' o sy, P., 1 i >

  • i li
  • 1 10

,n

.i..,,,.

o' A D. Wadard Alithillllit POWel

.e r o

e f f,, ie July 8, 1991 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Contr01 Desk Vashington, DC 20555 Joseph H. Parley Nuclear Plant Completion of Plant Hodifications foi Hid-Loop operation Gentlemen:

In response to Generic Letter (G.L.) 88-17, " Loss of Decay llent Removal,"

Alabama Power Company provided a description of the plant hardware modifications necessary for mid-loop operation in a letter dated December 7, 1989.

In this letter a commitment was made to complete the described hardware changes during the Unit I tenth and Unit 2 seventh refueling outages.

In a letter dated April 17, 1991 the NRC concurred with this schedule and requested notification upon completion of the hardware modifications.

Alabama Power Company has completed implementation of all other modifications described in the December 7, 1989 letter for both Units 1 and 2.

If there are any questions, please advise, l

Respectfully submitted, s

PW

-c Q.'.Voodard JDV/tcVimap 0354 cc:

Mr. S. D. Ebneter i

Hr. S. T. Iloffman l

Hr. G. F. Maxwell l

l l

l gjgj~/1(' hob 4 D1b70 l

Puh ADOCK 0500034L' l