Text
[ _ PRINCIPAL STAFF V3 YMaOPRP
'/RA JE CODSum8fS h/R4 i, m
4 pC VAd,,m A Deen L ouemme ggy 7,, -t 9"'
M'"'*t"
?AO V~
SCS /
Company yA w-uma we
J F
, File W /< f Mdand Protect: PO som 1963. Mdand. MI 4864o. (517) 631865o
.SD 'Sb dB43D November 4, 1983 Mr J J Harrison Midland Project Section U S Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND ENERGY CENTER CWO 7020 SERVICE WATER PUMP STRUCTURE LOAD TRANSFER File: 0485.16.2 UFI:
42*05*22*04 Serial: CSC-6978 The following item is not addressed in the Midland Safety Evaluation Report (including Supplements 1 and 2) concerning the service water pump structure load transfer (Section 3.8.3.2).
Before excavating pier pits 7 and 7A, piers 1 through 6 and 1A through 6A will be loaded to 125 percent of the Stage I loads (unless otherwise directed by the resident structural engineer). This will be done to maintain structure elevation during the excavation of pier pits 7 and 7A.
These loads will be decreased as the jacking of piers 7 and 7A progresses so that when piers 7 and 7A are jacked above the Stage I loads, the temporary increase will be eliminated and piers 1 through 6 and 1A through 6A will again be at 1007. of the Stage I loads. This will not adversely affect the structure because it simply redistributes the loads in the vicinity of the excavation to the other piers until piers 7 and 7A can be jacked. Other conditions more critical than this have already been analyzed.
If you have any concerns or comments regarding this subject, pleasa contact this office.
b
/
,a DLQ/ DES /klm l
i i
l 8311210300 831104 l
PDR ADOCK 05000329
[
l E