ML20082B861

From kanterella
Jump to navigation Jump to search
Forwards Rev 2 to Pump & Valve Inservice Testing Plan for Unit 1 & Pump & Valve Inservice Testing Plan for Unit 2. Updated Title Page Separating Inservice Insp Piping Program from Inservice Insp Pump & Valve Program Also Encl
ML20082B861
Person / Time
Site: LaSalle  
Issue date: 11/12/1983
From: Schroeder C
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20082B864 List:
References
7606N, NUDOCS 8311210354
Download: ML20082B861 (2)


Text

.#

g

'N Commonwealth Edison

/

~ one First Natganal Piva. Chjcago. minois

)

\\

J, Addr:,ss R; ply 12: Post Offics Box 767 i

N Chicago, Illinois 60690 y

November 12, 1983 Mr. Harold R. Denton, Director Of fice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

LaSalle County Station Units 1 and 2 Pump and Valve Inservice Testing Plan NRC Docket Nos. 50-373 and 50-374 References (a):

C.

W.

Schroeder letter to A. Schwencer dated February 18, 1983.

(b):

C.

W.

Schroeder letter to H. R. Denton dated August 2, 1983.

Dear Mr. Denton:

Reference (a) provided the original issue of the LaSalle County Station Unit 1 Pump and Valve Inservice Test Plan and Reference (b) provided Revision 1 to that document.

Enclosed please find:

1.

LaSalle County Station Unit 1, Revision 2 Pump and Valve Inservice Testing Plan Pages in four tabs are provided to correct typos and update the data regarding test scheduling as explained in the writeups.

2.

LaSalle County Station Unit 2, Original Issue Pump and Valve Inservice Testing Plan Please note that these pages are specifically designated for Unit 2 by the verbage next to the Commonwealth Edison Company logo in the upper left hand corner of each page.

Also provided with this initial issue of Part B are new title pages and separators for insertion into the two volume ISI Program for Unit 2.

The tabs'are intended to separate the ISI piping program from the ISI pump and valve program.

Each sub-part is arranged alphabetically by system designator such as DG for Diesel Generator, NB for Nuclear Boiler, MS for Main Steam, etc.

Within each system, the pages are numbered numerically as needed to cover the entries which are also numerically arranged to assist in locating a particular item.

8311210354 831112 O

kJ gDRADOCK 05000373 ght PDR E

.. _...=

,o H. R. Denton 2-November 12, 1983

?

One signed original and ten (10) copies of this letter and addendum are provided for NRC use.

Instruction sheets are.provided to assist recipients in entering the addenda into the ISI Program Document.

i By copy of this letter, two (2) copies of.these addenda are being pro /ided directly to the.4RC's contractor, EG&G.

To the best of my knowledge and belief the statements l

contained herein and in the attachments are true and correct.

In some respects these statements are not based on my personal know-1 edge but upon information furnished by other Commonwealth-Edison and. contractor employees.

Such information has been reviewed in accordance with Company practice and I believe it to be reliable.

If there are any further questions in this matter, please contact this office.

Very truly yours, "A^ ~ II))1.l%3 C. W. Schroeder Nuclear Licensing Administrator

^

i Im cc:

NRC Resident Inspector - LSCS 1/0 Dr. A. Bournia - 1/1 (Hand Delivered)

Mr. Herb Rockhold, EG&G 2/2 i

Attachment 7606N i

L l

l Y

---._--_L__..-a x-_. _ _. -.- - - - -. _ _ - -

_.___-----~.L

._s.___

__._..-..--L___---

'