Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 1004.6 Re Addl Assistance & Notification & 1004.10 Re Onsite/Offsite Radiological Monitoring
ML20082B177
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 11/01/1983
From: Stange S
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20082B175 List:
References
PROC-831101-02, NUDOCS 8311210031
Download: ML20082B177 (46)


Text

{{#Wiki_filter:-- O I SU 1004.6 Revision 8 IMPORTANT TO SAFETY

     .       NON-ENVIROM4 ENTAL IMPACT RELATED THREE MILE ISLAND NUCLEAR STATION UNIT NO.1 EhERGENCY PLAN IMPLENENTING PROCEDURE 1004.6 ADDITIONAL ASSISTANCE AND NOTIFICATION Table of Effective Pages                               { '

! Page Revision Page Revision Page Revision Pa ision . 1.0 6 2.0 6 3.0 4 4.0 6 5.0 8 6.0 4 7.0 8 8.0 6 9.0 1 D 10.0 6 11.0 6 12.0 6 13.0 6 14.0 3 15.0 3 O 16.0 3 20.0 5 Y  %~ / eda 4 3 Syature & Date

                                                 '          ~

Signature Date l Document ID: 0021W lS$*E588R2!!ssig, 0 O %ooS PDR.,

O i 1004.6

  ,                                                                                                                                            Revision 6 r~

THREE MILE ISLAND NUCLEAR STATION I ~ UNIT NO.1 EMERGENCY PLAN IMPLEMENTING PROCEDURE 1004.6 ADDITIONAL ASSISTANCE AND NOTIFICATION 1.0 PURPOSE To provide the Emergency Dimctor with a directory of additional emergency response personnel, organizations and agencies b organizational duties, responsibilities and discipli The Emergency Director is responsible for implement s procedure. 2.0 ATTACmENTS 2.1 Attachment I 1 Onsite Emerge onse Directory. 2.2 Attachment - it 2 Onsite Eme 1p esponse Directory. l 2.3 Attac e Offsite Emerge e onse Directory. 2.4 Att IV - Emergency Assistance Checklist.

      ._,            2.5   Attachme t V      - Emerg                             hone nunbers f                                   NRC notification.

( s' 3.0 EMERGENCY ACTION LEVELS 3.1 This procedurt mplemented wi t aration of arty class of eme when additional response personnel, organiza gencies other se listed on the relevant Emerge P Implementing Proc are needed to assist TMI, or, 3.2 As request d by the Emergency Director.  ! 4.0 EMERGENCY ACTIONS 4.1 In the event of a declared emergency at TMI that requires additional emergency response personnel, organizations or agencies, the following steps should be taken: 4.1.1 Detemine the discipline of personnel or necessary equipment that will be needed for the class of emergency declared. ( 1.0

o 3

                  .                                                                           1004.6
    -                                                                                         Revision 6

( 4.1.2 Refer to Attachment I, II, or III to find the appropriate discipline, choose the personnel, organization or agency wanted and telephone number of that organization. 4.1.3 Emergency telephone ntabers for the NRC are listed in 4 Attachment V. 4.2 When called party answers, provide the followi  : THIS IS AT THE THREE MILE ISLAN STATION UNIT 1 (name/ title) CALLING. WE HA CLARED A AT HOURS. (Type of emer9eAcy) (time) TMI REQUE SISTANCE AS FOLL . (State a:V assistance requir ttachment IV if icable). 4.2. Identify existin p and give brief description of l

         .                            problem.

b 4.2.2 Identify a personnel /eq ent eded and request assis . 4.2.3 8 to identify telepho r that can be used by a isting organiz call back. 4.2.4 r to Attachment IV assistance to be provided. l 4.3 If further assistance is required, apeat 4.1 and 4.2 as needed. 4.4 Additional sources of assistance may be requested as described in the INPO Emergency Resoun:es Manual and INPO Voluntary Assistance handbook. 5.0 FINAL CONDITIONS N/A ( 2.0

t 1004.6 Revision 4 ATTACHENT I

               \

UNIT 1 ONSITE EMERGENCY RESPONSE DIRECTORY

NOTE: Numbers prefixed with 948 am site extensions.  :

OPERATIONS WORK Rfl86E NO. Pan Toole 8-8005 948-8 506 M. Ross 948-8015 948-8202 EMERGENCY CONTROL CENTER ROOM) v D Shif t Fori! man's 948-8069 948-8070 948-8071 Contml Room - Comunica nsole 9-944-0839 l Control Room - Sh o an 948-8069 948-8070 V 948-8071 Contml Room - Dose Assessnent (RAC) 948-8069 948-8070 948-8071 9-944-0839 l Contml Room Computer Ama 948-6525 z 3.0  ;

1004.6 Revision 6 ( OPERATIONS SUPPORT CENTER OSC Coordinator 948-8083 Radiological Controls Technicians 948-8082 UNIT 1 TECHNICAL SUPPORT CENTER TSC Coonfinator 948-8742 l Engineers 940-8742 l UNIT 1 INSTRUMENT SHOP i Shop Area 948-8214 Offices 948-8072 948-8073 948-8074 948-8213 _ PROCESSING CENTER Security - Duty Sergean v 948-8038 NRC V TMI Site Office 948-1120 ( 4.0

  • O 1004.6
            -                                                                                   Revision 8
  )                                                  ATTACHl(NT II UNIT 2 ONSITE EMERGENCY RESPONSE DIRECTORY
NOTE: Numbers prefixed with 948 are site extensions.  :

OPERATIONS WORK RIIMIE NthBER John Barton 948-8401 948-8327 Unit 2 Site Operations 948-8326 Manager, P1 ant Operati 948-4068 9 EMERGENCY CCNTROL CEN TROL ROOM) Shif t Foreman's 948-8068 Control Room-Comunhsdtions Console 948-8066 948-8067 Control Room-Shif t Foreman 948 8066 948-6067 Control Room-Dose Ass 948-8066 948-8067 Control Room-Computer Wea 948-8067 OPERATIONS SUPPORT CENTER OSC Coordinator 948-8092 Radiological Control Technicians 948-8092 l 1 5.0

l o 1004.6 Revi,sion 4 UNIT 2 TECHNICAL StPPORT CENTER TSC Coordinator 948-8352 Engineers 948-8352 UNIT 2 INSTRINENT LABORATORY

Lab Area 48-8 274 Offices 48-8156 948-8272 948-8273 948-8155 TRAILER 214 Q Unit 2 Security Se e V 948-8594 NRC TMI Site Offic 948-1120 l
     /
                               %                 0
   \

6.0

  • 1004.6 Revision 8 ATTACHMENT III 0FFSITE EMERGENCY RESPONSE DIRECTORY EMERGENCY OPERATICNS FACILITY COMMERCE PARK, HARRISBURG General Numbers - 9-657-0471, 9-657-0564, 8966 Admin. Support - 9-657-2368, 9-657-243 , 9-657-2739 Chemistry - 9-657-0 9 57-0564 Tech. Functions Area - 9-657-0471 ANNEX TO THE EMERGENCY OPERATIONS FACILITY (CRAWFORD ST k Second Floor F/RhFloor 9-944-2614 M and C 858 Security 9

9-944-3668 M an -286 Securi 9-944-2922 9-944-2972 Ra ENVIRONMENTAL ASSESSMENT COMMAND C_EN OMMERCE PARK, H RG V V Gene ~al No. 9-657-3934 Gary Baker 9-657-3666 William Ressler h 9-657-8805 TECHNICAL FUNCTIONSA Y v Group Leader Te cal Support 74-1-201-299-2111 74-1-201-299-2113 74-1-201-299-2249 74-1-201-299-2246 Commercial Number 74-1-201-263-6500 l 7.0

1004.6 Revision 6

,(.       POLICE Pennsylvania State Police (24 Hours)                          9-234-4051 Pennsylvania State Police Helicopters (0815-1615) (M-F)       9-783-5511, 944-7149, 783-1691   4 Police Fon:es in York County (24 Hours)                     - -843-5111 FIRE Londonderry Township Fire Department                       r 9-236-7976 Middletown Fire Department - including:               911 or 9-944-6344 Union Hose Co Rescue              . No. 3           D Libert           pany Bainbridg        Department (L    as    o.)     9-911 or 73-1-653-2046 urs)

( York County Fire Depar 9-91 73-1-843-5111 AMBULANCE Londonderry Town h 1. Ambulance 9-911 or 9-236-7976 Middletown Am u e ervice 9-911 or 9-944-6344 Bainbridge a e Service (Lancast .) 73-1-653-2001 (24 Hours) STATION MEDICAL CONSULTANT Dr. William Albright III General 9-939-7831 l ! ( l 8.0

1004,.6 Revision 1 ( HOSPITALS j Hershey Medical Center (Emergency Room) 9-534-8333 Harrisburg General Hospital General 9-782-3131 Emergency R n 9-782-3297 *: METROPOLITAN EDISON COMPANY AND GENERAL PUBLIC UTILITIES MANA Met-Ed-SystemSafetyDirector(0800-1700)(M-F) 15-921-6227 Met-Ed - Div. Safety Director (0800-1700) (M-F) 1-215-921-6024 H 73-1-215-373-0307 Met-Ed - Dispatcher, (24 Hours) 73-1-272-1281 Met-Ed - Di 0t Manager, Midd

                                                                               *73-1-272-5623 ty Hours, Ask for Dispatch 9-944-5111
 ,, p,           General Public Utilities 830 - 1700             201-263-6500 after 1700         V 74-1-201-263-6111 GOVERNMENTAL AGENCIES Dept. of Energ           rs)                              74-1-516-282-2200 NRC - Office        a d E, Region 1 (24 Hou s)            73-1-215-337-5000 NRC - Middletown Office                                         717-948-1150 PADept.ofEnv.Res.(BRP)                                             9-787-2480 EPA - Region III Office (24 Hours) Emergency No.          73-1-215-597-9898 i

( ( i 9.0 l

1004.6 Revision 6 Civil Defense Organization (24 Hours) { Pennsylvania Emergency Management Agency 9-783-8150 Bureau of Radiation Protection (Nights, Weekends) 9-763-9041 9-232-4028 9-652-6304 Dauphin Co. _ r 9-236-7976 Lancaster Co. (24 Hours) 73-1-299-8373 York Co. 73-1-843-5111 Cumberland Co. 9-238-9676 Lebanon Co (0800-1 73-1-272-7621, 272-2296 73- - - 25 (After hours and weekends) l U.S. Coas rd (Harrisburg, PA) (General) 9-782-3737 (Nights, Week nds) (24 Hour 74-1-212-668-7055 ( Meteorological Informati National Weather U(NWS) 9-782-3927 Cliff Goodall,. Chief Meteorologi ( s.) 9-782-3936 Pa. Bure ality Contro 9-787-4324 (Susqu a tver Forecast Cent 9-782-3488 PARSIPPANY TECHNICAL r NCTIONS GROUP Group Leader Technical Support 74-1-201-299-2111 74-1-201-299-2113 74-1-201-299-2249 GPU NUCLEAR CORP. CONSULTANTS l Babcock and Wilcox, Lynchburg, VA (24 hours) 74-1-804-384-3413 l Radiation Management Corp. Emergencies -(0800-1700) 73-1-215-243-2990 i (1700-0800) 73-1-215-841-5141 l Office (0800-1700) 73-1-215-243-2950 l 10.0 l l

1004.6 Revision 6 ( Pickard, Lowe and Garrick Assoc. Washington, D.C. 74-1-202-296-8633 Gilbert Associates Inc., Reading PA 73-1-215-775-2600 Teledyne Isotopes. Westwood, NJ 74-1-201-664-7070 Burns and Roe, Paramus, NJ 74-1-201-265-2000 4 MPR Associates Inc., Washington, D.C. -- 2-659-2320 Institute of Nuclear Power Operations (24 hours-Eme 4-953-0904 Emergency Telecopier (0800 to 7 1-404-953-7526 CHEM-NUCLEAR SYSTEM, INC. Barnwell After Hour 803-259-1782/1783 Corporate After D 206-827-0456 Marketing Re e ve, Larry Witt 203-677-0457 Special Needs: m Nature of Business ergency Contac

1. Transportation Sch , . Mattingly 803-259-1781
2. Billing Probl ers 803-259-1781
3. Solidificatk ineralization, an 803-256-0450 DecontaminaK , Motl
4. Engine in art-up and Traini , offman 803-256-0450
5. New Busi Famington, CT Office, P. Sigler 203-677-0457
6. Shipment Questions or Discrepencies, J. Zawacki 803-259-1781
7. Undefined Famington, CT Office, P Sigler 203-677-0457 DOWNSTREAM RIVER WATER USERS ,

Brunner Island (PP and L) (24 Hours) 73-1-266-3691 Wrightsville Water Supply Company 73-1-252-3711 or ( . Mr. Miller, V.P. of Water Co. (Unlisted) 9-564-8220 11.0

             .                                                                     1004.6 Re91sion 6

'( Columbia Water Company Plant (24 Hours) 73-1-684-2712 Lancaster Water Company (24 Hours) 73-1-684-5056 Safe Harhor Water and Power, Inc. 73-1-872-5441 73-1-872-4697 4 872-5442 3-1-872-4698 Holtwood Generating St tion 073-1-872-5443 73-1-284-4101 Chester Water Aut ec. Manager) 3-1-215-876-8181, 8182 urs Ans. Sve.) D l Baltimore W y Auth. Mr. Hud us. Hrs.) 74-1-301-396-1277 (Weekends, (24 Hours) 74-1-301-396-5352 Emergency . Jones) 74-1-301-396-5352. I (24 hours) or Water Facilities i on (Pumping and Pur . on) 74-1-301-396-0287

                                ~ Wa er Koterwas OTHER v

Harrisburg International Ainort Control Tower 9-944-4502 Middletown Line Department 8535 or 9-944-4621 York Company Office 73-1-846-7800 Lebanon Company Office (Business Hours) 73-1-272-5661 (Weekends, Holidays) 73-1-272-1281 Keystone Helicopter Corporation 73-1-215-644-4430 Capital Trailways Bus Company 9-233-7673 ( 12.0

              .                                                                     1004.6 Revision 6
  ~

(. Conrail Railroad Train Movement Coordinator (24 hr ,1 9-652-3772 9-657-3552 9-657-5414 Insurance - American Nuclear Insurers 74-1-203-677-7305 4 or 9 -3172/3173 UTILITIES Pennsylvania Power and Light, Allentown, PA 215-770-5151 Philadelphia Electric - Peach Bottom (Gen.) 73-1-456-7014 (Operati ns De ) Ext 223 or 423 Body Counting De @ Ext 490 or 497 or 49e> Baltimore G tric 74-1-301-234-5000 Dusquesne t/ Beaver Valley 1 Rm.) 73-1-412-643-8002 Dusquesne Light 33Prporate) 73-1-412-456-6000 I Nine Mile Point Unit 1 Business Hour ) 4-1-315-343-2110 (Control R 74-1-315-342-J046 Power Authority a f NY (James A. Fitz Plant) (Ge al 74-1-315-342-3840 Cont oom Ext. 311 Oyster Creek (Control Room) 74-1-609-693-6066 (Main Gate Desk at Guard House) 74-1-609-693-6950 Salem Nuclear Station 74-1-609-365-7000 13.0 1 1

         .      -                                                              1004.6 Revision 3 EMERGENCY RESPONSE ASSISTANCE CHECKLIST f

ATTACHMENT IV OYS. PCH BER- CALV. CRK SALEM BTH WICK CLIFFS ~~ A. Personnel

1. H.P. Supervisors 2 2 3
2. H.P. Techs 5 5 5 10
3. Radio Chem Superv s 0 v2 0 2
4. Radiochem Tech 3 2V 2 1 2
5. Engr-Effl. 0 0 1 1 1
6. TLD Rea r 1 1 1 1
7. EE-RM c. 1 0 1 0 1
8. Security Sgt. 1 2
9. Sec. Officers 8 0 1 B. Radiaton Detection E
1. Survey Heter- 1 2 12 5 8
2. Survey Me r Hi-Teles 9 5 0 4 1 e

{. !k 14.0 l

             '                                                         1004.6 Revision 3 OYS.         PCH  BER-      CALV.

{ CRK SALE!1 BTil WICK CLIFFS

3. Survey f4eter-Lo 5 5 4 10 8
4. SAM II O 1 0 2 1 4
5. Portable Geli 1 1 1 1 0
6. Shield for Geli 1 1 0
7. Computer and Output g for Geli 1 0 0
8. uR/hr ratemeter y and recorder V 0 D 0 1 0
9. RM-14 Fr k 10 15 5 3
10. Ai r Sa . -lo vol . 3 6 2 2
11. Air Sampler-hi vol. 10 5 2 2

( 12. Gas Sampler (for v later Geli Analys v 0 2 0

13. Pocket Dosime e 200 @ 100 20 200 bN b W

(

15.0

1004,.6 Revision 3 ,[ OYS. PCH BER- CALV. CRX SALEM BTH WICK CLIFFS

14. Proportional Count 0 0 1 0 1
15. Liq. Scint. 1 0 0 0 0 *:
16. Scaler-Timer and Detector 1 1 1
17. Shields for above 1 1 1 0
18. Rad tads 0 /u4 0 0
19. Ion Telemetry 0 0 1 0 0 C. Vehicles
1. Station Truck an for Survey Team 1 1 1 1 l 2. 110 generator 1 0 1 0
3. Inverter for v vehicle batt 0 0 1 1 T

16.0 -~

1004 6

    -                                                                       Revision 3 OYS.            PCH  BER-    CALV.

CRK SA'_EM BTM WICK CLIFFS

4. Geli Counting Lab Van 0 0 0 1 1 ,
5. Beta Count Lab 0 0 0 0 1 *:
6. Wind Speed and Direction Indic. 0 0 0
0. Supplies
1. Coverall and Acc v Set 2 1M 500 500 0
2. Disposable 10 000 0 200 200
3. Rainsui 50 200 250 10
4. Respir s 100 150 100 100 100
5. Respirator Cartridges 1000 500 200 100

( 6. Iodine Sarapler Cartridges 500 200 250 100 l 17.0 ig i i f

                    *
  • 1004.6
       ,                                                                                            Revfsion 3 r                                                                                                                        lI j..    ,

0YS. PCH BER- CALV. CRK SALEM BTM WICK CLIFFS

7. Silver Zeolite Cartridges 0 200 0 0 0 {
8. 50 gal. plastic bags 5000 500 50 1000
9. Decon Kit (skin) 1 0 0
10. Abeslute Filter yacuum Cleaner 2 1 0
11. Filters for abo 2 IV 0 2 0
12. Resp. Test V 0 D 0 0 0
13. SCBA (4 20 6 5 10
14. SCBA 0 20 6 10 30
           ._.            15. Port. Air Comp.                                 0         1        0         0
16. Glove Box for Sample Prep. V 2 0 0
17. Lead Bricks 0 0 100 500 i

l 6

                                                                                                                               \
      /

( ' ( \ 18.0 i

         -     -                                                    1004.6 Revfsfon 3
       !                                      OYS.        PCH BER-       CALY.

CRX SALEM BTM WICK CLIFFS

18. 1/4" Lead Sheet 4x4x1/4 50 10 10 20 100 <
19. Lead Blankets 0 2 1 100
20. Air Staple Papers 1000 200 0 10000
21. Radiacwash/ gal 0 0 55 5
22. Rad. Cal. Source 0 2 0
23. Misc. Std. for Lab Equip. 1 0 1 0

( t v A O s O i T 19.0

1004.o kvision 5

        'D                                         ATTACHIENT V EIERGENCY TELEPl{}NE NUMBERS FOR NRC NOTIFICATION
                 ,TELEPHGNE SYSTEM                                 TELEPHONE NLHBER j              1. Emergency Notification System                   (Lift Receiwr f rum Cradle) to NRC Operations Center                                                            *:

1

2. Goumertial Teleptune Systeu to 202/961-0550 NRC Operations Center
, (via Bethesda Central Office)
3. Comercial Telephone System ta 301/4 NRC Operatioits Center (via Silw r Spring Centr Office)
4. Health Physics Netwo *22 ( oc h-To rw)

NRC Operations Cen Rota ry Dial)

5. Couraercial Telep tem to NRC Opera (via Bethes tra Office) 301/492-7000

(. o y $ I i

    \

i 20.0 . k e e g

                                                                                    " TEMPORARY CHAN2E"
                                 ~
                                    .               Three Mile Island Nuclear Station Temporary Change Notice (TCN) l          e                      NOTE: Instructions and guidelinesin AP1001 A                                  12.TCN No. @- % - MBE (From TCN Log indeal must be fosowed when completing this form.

i lb sd -

13. implementation Date #hb -
                                                                                                                                                                /

l i\ ( SS/SF Signature l ! 2. ,,ooedu,e loo 4,3 9 SA Ede,oenev I No Present Rev. No Thie V # I i - [ 2. Change (include page numbers. paragraph numbers. and exact wording of change ttach addstoonal sheets i l if necessary and provide the <)enenc nature of the change on this sheet.) I e 2.Tr.0, MththtC t Sethn E.- To bE 3

                                                                                                                                                              #      Ed                 d-
3. Reason for Change: gg g 4.

b Duration of TCN - No longer than ninety days from implemen n dQf TCN or as in (a) or (b) below whichever occurs first. k)TCN will be ca procedure rev' ' issued result of a Procedure Change Request to be by X ~ " " (Submit PCR as soon as l possible) cN inemoues Sg (b)TCN is not - \< O N in c 1f _ wVch we result an TCN twing conceNed)

5. Is procedure " nt ESafety"? ('F yesEVno O
           ..                    8.

If "Yes" a safety atson is required (sid Is procedure "Environmentallmpact Re h b yes O no F if "Yes" an environmentalimpact evalue uired (side 2). I ' ~ 7. Does the change effect the intent 'nal procedure? ^ yes G no Y NOTE:if answers to #5. 6 a the change may be the Shift Supervisor. NOTE: If answer to #7 i t nge must be rev' ved in accordance with Table 2

- pnor to implemen NOTE:If answer to # answers to #5 "y change may be either (a) two member reviewed _

and approved in ac an ith table 2. Review Signat#ts:

8. Change Recomrne y: Date la/ Ale /f3
9. '
  • Procedure Owner C urrence - 8A -
  • 2 - ' -

Daw M N r Odce Deportrnent Head.or fue Doesgnee mey concur of Procedure Owrer is unewedseie

                                         * * *May Asoponedite in ey feesconTechnsel      Aewswer."- .[                                                                                                   -
10. Tech. Functions Rep. Notified (if read.) Date
11. Approval (s):

l (b) Nc mal Route (Per AP1001 A): (a) Two Members of the GPUN Mng. [ Staff Route l {tsg W ). h k AQ@.7/f_9. s.edture f ' oote 1 5"" 9 D*'* y MC, f./,p7//3 l s.ensrur oeie 2 s neiure oeie l D3 _

                                                                                                                                     /
                                                                                                                                                                                  //// I---

I Within fourteen (14) days: (Approval (c) SS proval Only: (This approval only per AP 1001 A must occur)  ! used if anwers to questions #5. 8 and l 7 are aN "No".) l I 5.eneture Date v SS Segnature l Date Signature Date l

14. TCN ia Cancelled _

Sutt 54ervisor & SNet Foremen Deie

                                                                                                                                     .       e   .
                                                                     " EVALUATION"                                                        Side 2 Three Mile Island Nuclear Station                                 7en u, y-g-ml7 l Safety / Environmental Impact Evaluation
1. Procedure /OOM 3 Tf4_ brq<>,v;c c, No. 44 /
2. Safety Evaluation Does the attached procedure change: .
                         *(a) increase the probability of occurrence or the consequences of an acc                           or yes O no [               '

malfunction of equipment important to saf ety? . -

                         *(b) create the possibility for an accident or malfunction of a different                     h      y yesO noV evaluated previously in the safety analysis report?                      a
                         *(c) reduce the margin of safety as defined in the basis                                        hnical yesO nof specification?

Details of Evaluation (Expla answers to above ques N"no". Attach additional pages if e Drri G A ( C. b Q V@ S 0?>1 W b CM dO & D O W Yb50 1%Iec s.utJ3 o n ikd oc>r reduce

                                                        $       Q.          d$                         l                 W                   4 Evaluation                                              ate     /b b-
                ,*lf any of these questions are answered"                   e                             dk ge must be reviewed .nu gved by the NRC prior to

( implementation.

3. EnvironmentalImpact Evalu n

,= Does the attached proced nge: (a) possibly involve i if environmentalim yes O no O (if 3(a) is "y ". Questions (b) and ( df " Details of Evaluation" below. If n tat by fihng in the " Details " below.)

                          * (b) have a signific t dverseeffeet on the environm nt?                           e                  yes O no O
                         ~*(c) involve a significant en ronmental matter or uestion                 , previously r viewed       yes O no O and evaluated by the N.                                        I Details of Evaluation (Attach a d ionalpagesif reo red) l l

l Evaluation By Da't=

                                                                                                                          )

J

                 *1f any of these questions are answered"YES" the change must be reviewed and approved by the NRC pnor to implementation.
4. (1) Normal Approval (s) 4. (2) If "Two (2) members of the Within fourteen (14) Days

[- (Per qP 1001 A) GPUN management staff route: Approval per AP 1001 A (saw-aa. 5.gnature

                             /d<Ae io/27hs       Date'         Segnature t
                                                                                          - Date              Signature                   Oste
            $                                scl37lcQ Signature     [/ '           /       Date          Sicc a*ure                     ') ate          Segnature                   cate 8-82 Ao0011325

/ *

                                                                                                                           ,        /
                                                                                                         ## 3           /

Rfyf,'% 9 ,

    ~
          .                                          ATTACHMENT I SECTION IV                                   j PROTECTIVE ACTION RECOMMENDATION GUIDELINES
                                                                                                         /
                                                                                                        /
  • THES ECOMMENDATIONS MAY BE DELIVERED ONLY BY THE EMERGENCY ECTOR
1. Considerat{on shall be given to sheltering if: -
a. Releash time is expected to be short (Puff rel urs). ,

l N, (AND)

b. Evacuation could e well underway p ted plume arrival due ing time, hi eeds, and/or foul weather.  ;.
2. Consideratio iven to',gva  :
a. A rele expected to rojected do s approaching or exceeding:

4 C) s 1 Rem Whole Bod i

                                                                               'k  -
- 5 Rem Chil D) ,
b. Release 'ected to be lo , hours)h
                                                   ,        (AND)
c. Evacuation can be well underway prior to plume arrivhl , or above
                                              <                                                    s release, based uoon wind speed and travel conditions. \

4 v 6

                                   /

I l 'ux.  ;

      \-
                        /                                                                                                           I l

J l

                                                                                                                           \x       .

2B D

                                                                                                                       'fj dC *.1a* a* .

[ l =

                                    *                                             *E E (4 G N. e -                   1.     :VT   1** D :T ***GCl~IM f ai" '                                                                       ,

SITE Ot GEN AL EME4f NM

 #.                                           CONS] Oft SMELTERING                                                              DECLARII Fo* A SIGNIFICAt!T EX;;U5!0* AREA PRO *
                            ;""-**l l               JECTED FR0= A PU88              00SEREL!AstRESULTINGl                                                                         -Es i                                      EPA - PAC's (us*Es LINIT) 1                                                                  NO                EP A - PAG'S (Low!F LIM.!T)                                                                           Ex:EE       E Os   seCJE 1                                                                                       Ex:EEDE OR PRCJE ED                                                                                      70 at     Ex:rEDE:jTEL      .

I TO at Ex:tEDED I "O 5 YES uN:ERTAIN g IMILI W .'N LARGE F!S$10N PRODUCT UNCERTAINTY AS TO LE RA3145 = 4 INVENTORY IN CCHTAINMENT7 *gye Tgg REL[A3);[Ty or D0wRWINO , PLANT FUN TIONS TO \ / (SUF81CIENT PAG's LowtRTO Ex:EED)EP A

  • LIMIT PROTECT TME Py3LIC \

(SEE NOTE 2)  %/

                                            "                                                                                                                                                                                                 \      ,

0 YES/\ !$ R'ELEASE l I o [' , DyRAtloN 11PECTE:

                                                                                                                                                                                                    \                                    yo M LDNG g

SUBST ANTI AL CORE DAMAGE PROJECTE

                                                                                                                                                                                                   }                                         '
                                                                                                                                                                                                                                                             \

(> 20. Fu!L DA sGt "C l No Q , \

  • I l

2 [ ' dATION\ C'Ag Evac SE ACOSM*LISHED

                                                                                                                                                                                                                                \

RE tPt=END SHELTERING OF ALL

                                                                                                                                                                                                                                                                     \
                                                                                                                                                                                                                                                                     /   i l

I ^ PR10a'TgPLUME/ *0TENTIALV , l

                                       '                                    #                                                                                                                                        (LEE 3        CONTINut                               CONT AINMENT INTEGRITY                                                         '

ARR!v&L.2)/ NOTE AFFECTjD

  • AREAt1 (

AS SE S $ME NT , FAILEO OR PRepCTE* - TO FAIL. YES \ '

    '(                                                                                               o   n                '
                                                                                                                                                          \

N

                                                                                                                                                                                             '                                     RECOMMEND CAN Ev&C                                                                                                                                   EVACUATION YES        ACCOMPLISM                   1      0                       \'                        N                                                  /     OF AF5*CTE:

4 N AREA (5)

                                                                                     ,-              p0                         '           \\                                                          %

v s

 ;-                                                                            _s                      fn N

RE:0MMEx: . i i

                                                                                                                                     ^
                                                                                                                                                             ' /                                                                                             -

EVACUAT!aN < ERIN OR AR!A(5) CF AFFECTEC RECOMMEND SM THAT CANNOT V TE!! PRIOR AREA (5) 8 3 y TO P,LuME ARs! ILICOMM

                                         ,.~,'y s,
                                               *                                                 '                                                      R 1REA(END 5)

EVAt %T10h (EE{ NOT! 0F f..M*b .

                                  .-                                            xs                       <x x
e. N s. , /

N *E },. 00N51DERATION SMOULt BE GIVEN TO TME) PROJECTED EXPOSURE TO BE RECElVE0 TO A PERSON IF NE S*ELTERS' vlCE EVACuATIs. IN'3C DolNG, YOU MUST F ACTOR R[ LEASE DURATION, RELEA5! MAGNITU t

                                         \              AN: A5$UM & PROTECTION FACTOR.08 /. FOR UP TC TME FIRST Z MOURS OF RELEASE OURATION AN i
                                            '            #F OF 1 FonL                > 2 MOUR5 RELEASE                        DURATION. TME PATawAY OF LEAsi EXPOSURE SMOULO BE CMOstk.

N \ i g / N  ! v "1T ry:CUAT10K T1** EST W TTS c t. \ }  ! uP'EF. (MOURS) N s s ,/ i Lows: (a0u45) N '. / IEST,EST1 MATE (NIGHT)

                                                                                         /

5 25 5n

                                           \                                                                                                                                                                              .

TYPICAL wtEKDAV(NORMA:.) g.. . ADVERSEwtATy Ear

  • GOOD STATE rF EME* GEN:Y READIN!!5 (Slow 5:!NAR10)

UP * ~ LACK OF At!OUATE PREP AR ATION TIME (F AST SCENARIO) 40*! 3 ' lh EXEn:151NG THE JUDGMENT As TO THE N!!O 808 D*O*!:TIVE ACTION DE 0M=.!NDATIONS, ANY UN:EPTAjNTY CON:!DNING Tu! STATUS OF PLANT FUN *l0NS NEEDE7 FOR PROT!:TIOh 0F THE PUBLI , TME LINGTm 0F Tim 8 TM.8 UM:!RTAINTY Ex1575, T*E *R:SPECTS 708 EARLv RE50L" TION OF &=.31 GUI TI E S, AND THE PCT (NTI AL DEGR A0ATIOh Of TwE PLAN

  • FUNCTION! NEEDED 808
                                                                                                                                            !.E., slGNIFICANT UN:Z8?AIN*Y A5 *O **!

{ PR:TECTION OF PUBLIC SMOULO RE CON 51DFREOJ DELIA51L!?Y OF PLANT FUNCTIONS Tf) 990TSCT TME PgELit EXTENOlNG jf,YONO A R[A50hA5LE TIMF PE810: 11 & SUFFICIENT RA515 708 MaclNG A PeCTE;T!vE ACTION *E:0=MINAT107: 7: 5-E.TE8

    '.                                                                                                                                     MILES SfWw=ilH;. CONTINUE PLANT A15155 MINT, wlTMIh & 2 MILE F ACIUS OF TME PLANT AN:

I

     ..           .                                                                                                                                                                                 i
                                                                               " TEMPORARY CHANGE" Three Mile Island Nuclear Station Temporary Change Notice (TCN)

E

             'N              NOTE. instructions and guidelinesin AP1001 A                               12.TCN No. @- M -M (From TCN Log indent must be followed wnen completing ths form.
13. implementation Date / tp2 SS/SF Signature M
1. Procedure h0V.f 0 No Presem ge, mg a

0.slh0Ad / 1 , ,* ,. ej Mha,, Tsue E

2. Change Gnclude page numbers, paragcaph numbers. and exact wordang of change. I ch additional sheets if necessary and provide the genen nature of the change on this sheet.)

he. e'bb d '*5'N **b 8 *'J I J1 ) *""'I I l () se,. - k gvocadoes , 4 Duration of TCN - No longer than risnety days from irnplementa A t whichever occurs first. dateVON or as in (a) or (D) beiow (a!TCN win be cane cedure retision ' e as it of a Procedure Change Request to be . . -y w- W (Submit PCR as soon as $ l possibiel la#'v #ue' - (b)TCN is not C 1 i Fe in encuens wn.cV a resusiin TcN being concemeal l

5. Is procedure ~1 t Mafety"? NN yes%no O if "Yes" a safe ation is requwed (side 2
6. is procedurs "Ensto entalimpact Relat A yesO no S(

if "Yes" an environmentalimpact evolustio ured (side 2).

7. Does the change effect the intent a ocedure? - yes C nod NOTE:If answers to # 5. 6 and 7 e change may be a v Shif t Supervoor.
 ~                                      NOTE: if answer to #7 is -              th           e must be revie                        ved in accordance with Table 2 pnor to implement NOTE: if answer to *7 s o reviewed or answers to #5 or                *e          nge may be either (al two member d approved in acco           c       h table 2.

S. Cha Rc me b b Date 'P[2'?

                          'g. ~
  • Procedure Owner C nce V # 2/M- Date
                                        . neeponeme T enn css neviewer. ne consee offee DeserMent weea.or efs Dee. ease eney concur er Procoowe owner e unevemenee a Mey ne av Tesocon                                                                                                                         --
10. Tech. Functions Rep. Notified Of read )
                                                                                                                 %"~ MA [t'a 'ar                               Date /d/MM
11. Approval (s): '

(a) Two Members of the GPUN Mng. nn ute 1001Ah  ; Staff Route g (fSe /0/fdp[g5 l s.egwe r '

o. I I

s.eneiw. oeie l

                                                                                                                  .I       ,

k -- - f

                                                                                                                                                                  / * /;.eP/' A.f '

2 ,, _. - _Q4 _ _ _. _ _ _ _./_?b_'l _3' ___ Within fourteen (14) days: Epproval (c) Approval Only. (This approval only per AP 1001 A must occur)  ! used if anwers to questions *5,4.ents

                                                                                                  ]               7 are su "No*.)        e.

s netwo oeie l u i l 5s s.enetwo oei.  ; 5.gnature oete l l 14 TCN ie Cancelled Shett Supeevisor & Sniti Forernen oeie 3-82 Aocol132 A .I

                                                                                                                      .         __           _ - ~ , -              .. . , _            - - . _ , -     ,
                                   .                                                                                   1004.10
         .                                                                                                             Revisi'on 6 s

C THREE MILE ISLAND NUCLEAR STATION UNIT NO. 1 EMERGENCY PLAN IMPLEMENTING PROCEDURE 1004.10 ONSITE/0FFSITE RADIOLOGICAL MOWITORING

1. 0 PURPOSE. l The purpose of this procedure is to provide guidance to radiation 4 monitoring teams for adequate monitoring of radiation levels 1 ing the accidental release of radioactive materials to the e t. The i procedure establishes monitoring team actions to be supplement nomal Radiological Controls procedure ation .

Monitoring Team is resp @r implementin ure.

                                                  ~~~

2.0 ATTACWENTS 2.1 Attachment n Survey /Smea i 2.2 'Attachne T Exposure l 7

                         . 3. 0 EMERGENCY A               LEVELS                .

3.1. This pro ure is to b upon the di c%on .the Radiological Asses , ator. 4.0 EMERGENCY ACTIONS INITIALS 4.1 Proc s Processing Cent C nd obtain an emergency ( (if vehicle is not equipped kit nt kit, air sampD( , ortable radio, magnetic I2h an Env. and Rad. frequen dio) antenn pager, and emergency respirators.

NOTE: If EACC personnel intend to take air samples in areas : .
inaccessible to vehicles (eg. Shelley Island), a  :

gasoline powred generator should be obtained for

this pumose. The generator should have adequate  :
fuel supply and should be started to ensure  :
operability prior to departing.  :

4.2 Verify seals on the emergency kit and then operationally check - i

        ,C-         -

radiation meters and portable air sampler. (Battery Check, ' ^ Air Flow Check, Visual Inspection, check calibration sticker, check source check tag, as applicable). 1.0

1004.10 .

    .                                                                                                                                Revis' ion 6 4.3       If emergency kit seals were broken, conduct a brief inventory                                                       l
          ~

of equipment. 4.4 Prior to leaving the Processing Lenter/EACC conduct a radio check with the Radiological Assessment Coordinator { (RAL)/ Environmental Assessment Coonlinator (EAL freq. I and with the "CG" switch on. Infom the RAC our

                 .~-

telephons pager number. , . _ ~ - . .:. ~~ .. 4.5 Obtain'an' ame. vehicle ~al the P ss .e'r/EACC.

                           . .            . This vehici                  ve a cigarv                                 tet or installed 110V pc-                   f the TCS air             ystobeused.

4.6 Ens rate meter i n from the time you

 ~-                                           le                 cessing Ce      r          ,    ,
      ' -                                                                                                or ther location
                              ' 4.7                    d to the desig                       ring locati                   s dirwcted by the         /EAC. (                di         ions in
                                                                                                                                                ~
                                   -. -                                                                                            kit for specifically         s onitoring p                                   ns.)

4.8 Perfom r a urveys (as i the RAC/EAC). 4.8.1 T radiation su s an open wind n at waist level, then a closed window re at waist level. Enter these the-re dings on the Attachnt I. Report closed window reading to the RAC/EAC. 4.8.2 Perform contamination surveys if dimeten by the RAC/EAC as follows: Obtain smears and coin envelopes from emergency kit, label envelope with date, time and location. Wipe the

        ,                                            smear over a 100 cm2 (4 in. x 4 in.) area. Count the t

2.0

l 1004.20

      -                                                                                                                                                     Revision 6 q
         #{ , '                                                    smear with E140N (or equiv.) if background is less than 300 CPM. If background is too high, move to an area of
                                                      ~

acceptable background in order to count smears. Enter gross CPM and BKG CPM on Attachment I. Subtr t 4 background from gross CPM to obtain net C . p net CPM for each smear to the RAC/EAC. Saw in coin envelopes for later analysis as di RAC/EAC.

                                                                                                      .          - .                                            1-
     - , . . q . _ ..-               . . .- 4.8.3 __ , Perform a                         amples .in .accordanc                                          rne.               .;             ~
                                                              - Radios                              pling and                       s,            cedure 1004.31 7
_ .. .: := -
                                                          ..4                           . . .        .--                                                          -.        . . . -
    . --                                          4.9,  Calljin                            ta to the                   C                       wait further l

ins - -- ha --

                                                                                                              ~~
         ..a                     .                4.10 If                       nications                                a d the pager is activated.

1- .' --

                                                                                                                            'nicatio                th thel-t to re-establi
                                                                                                         .W
                           )                                                  .-

m RAC/EAC.-. 'If rad tions canno e tablished. - .

     .,_                                                attempt to c                _

r monitori lay informati .act cannot d, drive to the - neares ne and call th -8069, 948-8070, i ring team control 948- e EACC (if tra s been made) at 944 '.737, c

  • occurred S4 r 944-6709.

657-4.11 Minimize personnel exposures by moving out of areas of high

                  .                                     radiation when recording data or awaiting further instructions.                                                                     ,   l 4.12 Ensure all team members keep track of their exposure on Attachment II.

4.13 Maintain all completed Attachment I's for permanent records. Request direction from the RAC/EAC as to the disposition of l

           .:                                           these completed forms.

h t 3.0 , i

IO"R l iS P IN UNIT l ONLY 1*4.10 Revision 6 ' 7, THREE MILE ISLAND NUCLEAR STATION

  -              -               UNIT NO.1 EMERGENCY PLAN IMPLEMENTING PROCEDURE 1004.10 i                                             ONSITE/0FFSITE RADIOLOGICAL MONITORING
1. 0 PU RPOSE.

The purpose of this procedure is to provide guidance to radiation , monitoring teams for adequate monitoring of radiation levels, lowing the accidental release of radioactive materials to *he en . The procedure establishes monitoring team actions to be pe me to supplement nomal Radiological Controls procedures adiation Monitoring Team is respo 1 for implementing cedure. 2.0 ATTAC*ENTS 9 , 2.1 Attachment I di ion Survey /Sme g 2.2 Attac , Team Exposure Lo l ,. _3 3.0 EMERGENCY ACTION ELS [ I dI r--- 3.1 This procedure is to be t d upon the dire the \ inator. Radiological Assessme o ~ 7 4.0 EMERGENCY ACTIONS g INITIALS I 4.1 Proc t e Processing Cent and obtainN an nl.h emergednpd@ Le kit, inst ument kit, air sampler, portable radi 2;--" "

                                         .ea.....%pager, and emergency respirators.
                                             ^
NOTE: If EACC personnel intend to take air samples in areas :
inaccessible to vehicles (eg. Shelley Island), a  :
gasoline powered generator shoulc be obtained for  :
this purpose. The generator should have adequate  :
fuel supply and should be started to ensure  :
operability prior to departing.  :

4.2 Verify seals on the emergency kit and then operationally check radiation meters and portable air sampler. (Battery Check, t-- -

     -                                    Air Flow Check, Visual Inspection, check calibration sticker cheb t-      ri   U Of4erk source          : t jt$' V   as f71 :

Licab,le

Oh.7,_Y d
                                                                                                                                 \[

1.0 l

Vl,Y O,

            -n
            .~ V, M .VO"I.W,,U!N.il
                                                        !                                                                           1004.10 kevision 6 4.3      If emergen:y kit seals were broken, conduct a brief inventory                                                                            l

,i ' of equipment. , 4.4 Prior to leavins the Processing Center /EACC concuet a racio check with the Radiological Assessment Coordinator (RAC)/ Environmental Assessment Coordinator (EAL) u - freq. I anc with tne "CG" switch on. Infom the RAC/EAC telephone pager number. 4.5 Obtain ari emergency vehicle at the Proc s ter/EACC. This vehicle iave a cigarette li- socket or insta11ec 110V power p if tne TCS air s is to be used. , 4.6 Ensure or e rate meter is o rneVon from th.e time you le e rocessing Cente .. y, 4.7 Procee o tiie desigria g ni ring location s directed by g the RAC/EAC. (See irections in em . kit for l specifically oes at monitorins poi t ons.) 4.8 Perfom radi ca surveys (as di d y the RAC/EAL). 4.8.1 To .Vadiation sury s ke an open window g at waist level, then tak a closed window reading at waist level. Enter these readings on the Attachment 1. Report esessuhWWsow readings to the RAC/EAC. 4.8.2 Perfom contamination surveys if directeo by the RAC/EAC as follows: ODtain smears and coin envelopes from emergency kit, label envelope with date, tim and location. Wipe the smear over a 100 cm2 (4 in. x 4 in.) area. Count the FOR USE lit UNIT I ONLY l[0

 !=

Y '

                      .   :OR USE IN UNIT I ONLY 1004.10         .

E Revision 6 5- _ smear with E140N (or equiv.) if background is less than F F

           --                                   300 CPM.       If background is too high, move to an area of k
  • acceptable background in order to count smears. Enter gross CPM and BKG CPM on Attachment I. Subtract ar-background from gross CPM to obtain net CPM. rt net F CPM for each smear to the RAC/EAC. Save n coin envelopes for later analysis as dire e RAC/EAC.

F 4.8.3 Perfom air samples in accordance t borne Radioac ' pling and Analy is, cedure 1004.31. { 4.9 Call in s ata to the RAC/E await further . l b -

 = -

inst c 7 4.10 If communications are nd the pager is activated.

  • attempt to re-establi communications th the E

E _. N ___ RAC/EAC. If rad u ations cannot be re- ablished, l attempt to con 1er monitoring a

  • lay g infomation. contact cannot be t hed, drive to the nearest p e and call tha 948-8069. R48-8070, 948-8 he EACC ans t u . .. w - .

4.11 Minimize personnel exposures by moving out of areas of high radiation when recording data or awaiting further instructions. l 4.12 Ensure all team members keep track of their exposure on Attachment II. 4.13 Maintair all completed Attachment I's for pemanent records. Reques'. direction from the RAC/EAC as to the disposition of l these completed foms. a uss wum oav pf

                                                              " TEMPORARY CHANGE **
               .               Three Mile Island Nuclear Station Temporary Change Notice (TCN)                                               ,
       .. S   NOTE Instructions and guidehnes in AP1001 A                                12.TCN No. bb@ /82'd (From TCN Log indexl-must be fouowed when completing thrs f orm                                                              /    .

13.imolementation Date #T d - SS'SF Signature 'u b

1. Procedure Mh bvmb
  • D.S. C .

No Pfetent Rev No Title

2. Change (include page numbers, paragraon numoers, and exact wording of change tach additional sneets 5 the g f '

i* necesLaLand u, ,.. proJvid Lnonc ,sa natureJ the - change L, #on this a sheet.) 4&..

3. Reason for Change:

N fLC W- k s s.- p . ' k. .*a. +e

4. Duration of TCN . No longer than ninety days from implementati da a

TCN or as in (a) or (bl below whicnever occurs first. (alTCN wd: be cancel revision isqu esult of a Procedure Change R Recuest to be yrocedur{ L Lt *h-(Submit PCR as soon as possible) Inosv4ual CN (b)TCN is not - D O Fdi en c.c T wn resuit en TCN neing cance#edl

5. is procedure - nthHfa'fety"? MM yes n no O If "Yes" a safe ation is required ! side L
6. Is procedure "Env entalimpact Relat A yes O noK If "Yes" an environmentalimpact evalus d (side 2).
7. Does the change effect the intent of e i ocedure? yes C no E NOTE:lf a ns,wers to #5. 6 and 7 "no e change may be appro Shift Supervisor.

NOTE: If answer to #7 is " ge must be reviewed ed in accordance with Table 2 poorto implement NOTE: If answer to # answers to #5 or 6 "y hange may be either (a) two member reviewed or (b) d approved in acco ith ble 2. Review Signatures: _ // M)

8. Change Recomm -

Y Date

9.
  • Procedure Owner tre Ikee Y E " Date '*N4J
                         . neoconsei. Teennesa nev   or. Rueon           fcYDer . ft Head, or he Cusgnee may conew if Procedwe Owner e unewedecae
                         = uay be ey Tescon l                                                                                        --
10. Tech. Functions Rep. Notified Of read 1
                                                                                                               - J'                         Date /Ob          d
11. Approvalls): "

l (a) Two Members of the GPUN Mng. Staff Route l *' D.' # # l [()2 /C)SZ7 h3 S.,nede e om I Signatwe Date i S gndwe ' FC,

                                                                                                                               ^d
                                                                                                                                          /hk3 l                                                            Date 2.

S two oeie I

                                                                                    ,            ('O                       M Within fourteen (14) days: (Approval                                          (c) SS A'pproval Only: (This approval only per AP 1001 A must occur)                                          !

used if anwers to Questions #5. 6 and l 7 are su "No".) Signatwe Date l SS Signetwo Date Segnatwo oste l 14 TCN is Cancelled Snitt Supervsor 6 Sn.ft Foreman Om e-ci Accot tal A

                                                .                                                                                                                                                                                                        100a.29                                  -
                       ,                                                                                                                                                                                                                                 Revision 3 3                                                                                                                                                                                                                              11/13/61 IMDORTAC TO SAFETY
     '~                    #.

NON-ENVIRONENTAL IMDA0T ELATED , THEE MILE ISLAND NU; LEAR STATION UNIT NO.1 EERGEN0Y IWLEMENTINT, PROCEDUE 1004.29 ACTIVATION OF THE OPERATIONS SUPPORT CENTER Table of Effective Pages 5

      .                       Page                       Revi sion                                                                        Page     Revision       Page            Revision                                                        Page                is n 4.0                                                            3                                                                                                                             6                  -.

5.0 3 c o ~ s dNs.D - I l

                                                                                                                                                                            ' .m                                                                                                                      l n                          .
                                                                                                                                                                                .<                                                                                                                    1 s                                                                                                                                              .

e . Unit 1 Staff Rec royal _v. f .' Approval CP.Ei Ut15t. He ac ,Q Unit 1 'PORC Re:omends Approval

                                                                                                                                   ^. NN                              '

s .- ' n G & lb Cnairman of POR; Date // 2 / Mana er TMI I Approval Wf ' Date // J / f/ V QA Modifications / Operations Mgr

                                                                                                                                               // d                               Date
               --                                                                                                                                                                                                                                   Document ID: 0033W

l 1004.2S I Revision 3 l _ N

~Z-THREE MILE ISLAND NUOLEAR STATION UNIT NO.1 EERGEN*,Y PLAN IP9LEMENTING PRDOEDURE 1004.29 ACTIVATION OF THE OPERATIONS SUDPORT CENTER 1.0 PURPOSE The purpose of this procedure is to provide guidelines for the Operations                                  e, Support Center Coordinator *.o activate the Operations Suppo                                n   r.

The Operations Support Center Coordinator is responsible' ementing tnis procedure. .

                                                                                                       ^

2.0 ATTACHENTS . 2.1 Attachment I, Ope pport Cent, n. 3.0 EERGENCY ACTION

  • Q 3.1 This proce u is be initiated d aration of any of the followt p '

3 1 rt as deters .- Alert Prcicedu 1004.2. h.

  =

3.

                                               ~

Site Eme

                                                                             ^

ruined by the Si ency e . procedureh '~~'

  ~

3.1.3 Gene gency as deterair6 ,y ,th General Emergency

                                                                                            ~.
                                                        +                                            .,

4, i 3.1.4 ^\ ted by the Emerge

                                                                                         \   '})h etor.

f \._ 4.0 EERGENCY ACTIONS- [ M vl Initials M V( ' activate the OSC by 4.1 The Operations Support Center Coordinator will ensure ! ensuring completion of the following: Announce to the personnel in the OSC area that 4.1.1 Activate the Maintenance and Instrument Phone you are the Operations Support Center Coordinator Line (M and I) and obtain information and fill in your name on the OSC Manning Status pertaining to the emergency from the Board. Have other coordinators (Rad Con Coordinator, phonetalker in the Emergency Control Center. Chemistry Coordinator, and Emergency Maint. Coordinator) enter their names on the Status Board and announce

   =-                                                                   themselves as they arrive.

1.0 l

1004.29 a . %inMnh!i"2

                                                                                                                                                  . l E                                                           Assign a phonetalker to                 n tN M and INnE"
               \

__4.1.2 ' 4

                             ?m
                             .c o
                                                                   !'ne and to Log all appropriate messages sent
  • yU a c.m and received, on the Telephone Comunications p Logsheet (Attachment III of the Connu ications 4 g j;;$ and Recordkeeping procedure, 10n4 .

8J the OSC rj, 4.1.3 Initiate and maintain log in a~ with F_ " N mp Communications and Recordk scedure o e

                          'e5                                           .5.
                         .3 E m                                         blish access co                         OSC so that all personnel
s. c { Io i . e99ko*kttach-peration n
                         $.o j                                       nt         or sugg                     ng    a M l6r/

5EEI fa'diollfi$al $rM E * "" jyj Coordinapr ons Coordinator imph .t

                 .m*       .

the foi edures:

        =

and Offsite ical

        =
                                                         .                           ite Monitoria                                 '

1004.10

                                                                                                        'r
        ~

l , b. Offsite N6 , 2004. S

                                                           \             b c   '. Search           escue b        18 d'.          lant Radiological Controls during Emergencies 1004.g Controls D'uring Emergencies
d. Emergency Repair / Operations 1004.21
e. Any other procedure as directed by the Radiological Assesraent l

Coordi nator/Operati ons Coordi nator. - 2.0 .

           \
               \                                                                                                                                       l u

I

1

    ----,e

^ l l I l 1004.29' Revision 3 7 j--, ., 4.1.6 . If directed to dispatch monitoring teams, ) [ ensure vehicles are available at the processing l center. Assign a driver, as needed, to accompany [- the Rad Con Technician.

Obtain vehicle keys from: {
a. Rad Con for the Rad Con Van j j H. P. van for the I and

! b. Maintenance h I and C vehicle t ther vehicle a . ! 4 accountabili conducted, collect

all security turn them over to the Site Sec er who will be dispatched to

! pick - i jE '

                             .-... y -            . -                             ..     ..-

l*  : NOTE: All per t retain theirJg - ! 4.1.9 Duty Roster rrive, turr over duties l -- 4 .1. fom the Emerge , via the i hem as time sure that their name is filled } unicator the OSC Man,n rations Suneert l Board and th&t an announcement l Center is 0 1 is made in . when they assume your duties. } 5.0 TINAL CONDITM y .1.10 When all e tor positions are filled with Onsite l Initials Duty Roster sonnel establish operations of the OSC P per the floor plan in, Attachment I and direct excess b 5.1 The 0 rationl'5d pok dendr

  • Ei 3bags,hYraNo*nal p "w1th*u m *tN
  • 1.11 Periodically brief personnel in the OSC regarding current i

areas established for duty section personnel and *

plant status and projected course of events.

connunications established on the 0'erational Line. 5.2 Duty section personnel are available for assignment as j necessary. i 3.0 w e - --- - , , , . . - , . - - , e ,-- - e e,,,-,-

1004.2c Revision 3 _ i

  • A~TA;HENT I
  • ODERATIONS SUPPORT CENTER OFFICE LAYOUT-HP i
7. Turbine S'=g.

t

                                                                                       . _ . . . . . . _ __,         ,4
                                                    - - g- -

13 8 \ i i ~ I 2

            !                                                              HesLth Phys' I
            !~h    ,
                           ~
                                                         ~          .O officcs                  o e

I j g '  : s r l Fuel Handling and g (p,9 g

                                                                         )             '

Auxiliary Build' , i

                                                                         <A 3Q                                             :

l Ac:ess c.nte . I N ~~~ P.i f- e- Rlg g 19_

  .=

t> a g 1

                                                                          \w
  • N 11 ,

s s Aaxk.__l7 F ng

                                   - ,I nkt(..c..im, ....                                             .

cy<,J, l - -

                                                     ;                                                                 l i

I [  ! 8 , e b* 4.0

        ?fIi
                                                                                                                                                    ~
                                                              ,: h y,x" "
                                                               ,l
     ~

_ l e y A . p - r t m t sr s - S a ie I n mt a p co

                 .m               ese h ur                                               t o                                                                      e
                                                                   $l(

eo CMA oh k SR { l f S . s _ .n A so v rc ee PD N n g a I or L Ce t a r dse aur g e a n i c e w o h S W *RMA , e r A

                                                                                                                       &l i
                                                                                                                         .dn .

xas g f l f l a A d O e r 3/ j ll oeB

                              .                                       A                                                Tu e                                                                                 F t
                    .r                                                 u
               &t e                                                   O nt a si s e                                                 s g

r paur OMHA Asr t i s a m

                                                         .                                 eb v                                 ha t                                       a                                   cL o

I nm uo oo L MG i d a CR R

                                                      /

I g nd~ )

                                                          . .                    ir TD                        k a y                                   NR IO AO t s l g in co aB r

R o e n HC ui Ts u Bw i e C e R r a g A sr a mt aa et l p m L s n e g c ( g ) T. D ( JS a e t o a 1 S n eei nHt r

                                                                                     /

i

                    .                                        0 o            g                                                                    r                      L          i         a g                   a                                  Lsc t

S i f n M@(0 I 5 0 . i n l e I ti n ci nsum mem aio 3 6 ( MR k sa c u eyn e N M mh nte ero TBR C E0 C H0 R CC irre/ FA / e eP os g ah Cy S neent a

                                                .                                                                           onnal rm d

g AI . . h ii H a t o PLL rs .l leIrnc l B tQ 8 er e . .r e mk gsl e Ci Ct apamiRu t 9

                                                .                                                 EL P U - R- E N Nl b

r u v

                                                                .                              s*

r _ @0G@GG a-T o l E e i= t a _. Y s ~ E T = K

                                                                                                              ~

Q ., E " T b

  • 1004.29 Revision 3 1 Ei ATTACHENT I  ;

ODERATIONS SLFPORT CENTER DeFICE LAYOUT-HP l Key to OSC Equipment ' '

                                                                                            +~

l

1. RW14 with HP-210 Probe
2. Table
3. Desk
4. File Cabinets #
5. Storage Cabinet f . entation
6. Status Board '

[

7. REW Ma p
8. Cabin Y
9. P one
 '$               10. Fi     id Cabinet            i r              i
11. Emergency Locker (F1 -

ms, prints,

12. High Rad area Ke'y r (
13. Xerox Copie

( \ - Ecuipment in 'th no Rcom: Ludium-2000  %

3. Counter-Scal n&-d Wide-Beta 4

i Orte: beta-gama Counter-Scaler i Tri-Carb Liquid Scintillation Nuclear Measurements Corp. beta-gama, alpha Counter-Scalers  ; Stabilized Assay Meters  ! l s 5.0 l

FOR USE IN UNIT ! ONLY l 1004.29 ' Revision 3 THREE MILE ISLAND NUOLEAR STATICN UNIT NO.1 EERGENCY PLAN IWLEMENTING PROCEDURE 1004.29 ACTIVATION OF THE OPERATIONS SUDPORT CENTER l 1.0 PURPOSE The purpose of this procedure is to provide guidelines for the Q rations - { l Support Center Coordinator to activate the Operations Support'C,e

  • The Operations Succort Center Coordinator is responsible hN lamenting this procedure. Os 2.0 ATTACHENTS /> k 2.1 Attachment I, Operdh. pport Center 77 Pl a . '

3.0 EERGENCY ACTION LEVEs M \v 3.1 This proceocre be initiated ug <teparation of any of the following. 3.1.1 Alert as detersin Alert Procedu 004.2. 3.1.2 Site Emergencv determined by the Site Emergency procedure 3.1.3 General :.cgency as detar=ined a ::m--3eneral E:nergency proc 0 4.a. ^ 3.1.4 A v~ n reded by the Emergency'ti]i$u ctor. 4.0 EE RGENCY ACTIONS Initial s y;[ g Osc 1, 4.1 end The Operations Support Center Coordinator will muusse esswlay completion of the following: 4.1.1 4wweu m h N pes *--- $' K c 5 c A M p .c M Oge Ns hteE b e J M ,~ y n t~ .- - % ose m . ,,

                                           %L6.-J.L.=A                            J.A-3%+# N
                                           %. -               e     s+ L, s.      Lyu % i.

J -~ ~ L-.s.,J~ 1.0 ' '? s FO R U S E IN U NIT I ON LY ,"c  %, MW-Lin l l

FQR USE IN UNIT i ONLY

     ,                                                                                                                        1004.29' Revision 3 uh,r.dr.      M.twa j.,,,,,,,d,e      _

[ 4.1.2 Assign a phonetalker to Apr the 3/and lj!Ihone Line and to Log all appropriate messages sent and receivedj on the Telephone Comunications Logsheet (Attachment III of the Comu ations *- and Recordkeeping procedure, 1004. .

                                                                                                            >L. cs c-4.1.3            Initiate and maintainflog in a                                                   e with
                 ~5j 7                           Communications and Recordk NU tc %. procedure sa
             ~                      tj, ; ,<.o
  • L o.u s s u.h I
                                                             ,                                                           osC   sk N' 5
  • U 4d mt 5 4 f v.- ad * *be 'v 6 0 -

Nh - _ c lei x%q1(. WI . c_p% w asm robs m 57**

         %* ,9 . .e                               . w.
                                =                 sy, ash 14Ask:ftew '

1 As directed bytne _1H)iological Assessments

          ;g j                                 (Coordinato             ;ierna ens Coordinator > implement J  4 m ~ hu
          %.                                     the foi               Q *ocedures:
               #Y                                                            d OO'Jb.                                             .1 l 4

5 I 0 itq Monitorin _

  • d -{A '

1004.10 0i* , A br1 of sd.eJH6

                                                                                                              ^    ^

4j( < v'[,i// // ' / / " b YrM(> 3 t .

s. Search scue
          ]                                                         1004.18 j                                               k.    "J:MWR. Radiological Codnfs (bEv E"
  • cy--e == s
          <              /

l / 1004.9 l l WMW

e. Any other procedure as directed by the Radiological Assessment Coordinator / Operations Coordinator. -
                                                                     - 3), &wm                                              Le-lCys~h.'.sS;-Nts y

2.0 FOR USE IN UNIT I ONLY fO

FO.R USE IN UNIT 1 ONLY 1004.29 ' Revision 3 4.1.f 7 If directed to dispatch monitoring teams, ensure vehicles are available at the processing center. k sss e' ~ ^ $< Ar o'~sm"I'I) $ *&~'? L.1c r%L 6 .l--. . . Obtain vehicle keys from: -

a. Rad Con , M k L I b hSw T v4',.[
b. Maintenance fe- b~

L._... ^. ,wu n.ru her vehicles edec. D 4.1. f accountabili s b i g conducted, collect all security b as turn them over to the Site Securd O. er who will be dispatched to

         ~

pick t .

NOTE: All per retain their k  :
                ~ 4.1. s                 e.~si+ day 4 L V-                J ~ -.*m M
                                 ,     .t.,4.c , 6                                +
                                    + y,,n               ,-Q CJ: .-.           [.-:z.s.u..

osc. m

                                                                          ~~~*J a d<

4

                                  .;.6,e.        J     -J        ? ~
a. L ese . ~ A- % u- w Litz .

yI.1 % ll .Jah,.p,;L RQJu# l' O 11. OJ, 6..L r.n (, ,4.1 M e A.,

-J 4. A -

pe L ff ,1l_,.,g+r =# t-> A ~ 1est 6 y~. @ .LJIf , , Lt .. ~ ,_. u r.

                         'f. t.E Lt. L. (I, l,,:.4 rac .                       \ a. 4L o c c v'p~l% ~n                  4 eL 4 sLLs               J y uU
c. . . 3 .4 .~6 ,

I

f/

4.1.1 l'- Inform the Emergency Director, via the consnunicator, that the Operations Support Center is Operational. 5.0 FINAL CONDITIONS Initials 5.1 The Operations Support Center will be operational-wr+houstar hgV areas established for cuty section personnel anQ/ ebs consnunications established on the Operati ay'ge. 5.2 Duty section el are available fov N gnment as necessary. 9 3.0 FOR USE IN 1 ONL(

                                     ,C                         eS L s                        @7 I
                                                                                       /

O

                                                                         /
                                                                       /

FOR USE IN UNIT I ONLY 1004.29 4 evision 3

                                                                                    .            . . . _                                                                                          j
                                                                             ~~~^"^"'*"                                                                                             '             -
             \t,                                        , .

i .

                                ,-               MERATIONS SUPPOP.T CENTER OFFICE LAYOUT-HP                                                                                       -
                                                                                                                                                                          ~

rbine B i.=_s_._ _ . ._._ .- l m W.

                              ;s              __
                                                                                                                                               , * ~
                                                                                                                                                                 ,' A                               q 4
                                      '10 ,
                                                                                              -                                                                   7-                                '

l 13 g I \, n s'

                                                                                                                                                               -"h 5                                    N.                                                2                                                                             k,,
  • H e a l t h .PAv s i j a :==. 3 ,/
       ;                              l              'N' i-      ~~~~~ 0ffice g                                     ,,
                                                                                                                            '-~~~

f N, I

                                                            . \   ..        - Q .,_..                  (,9 )

( Fuel Handline-and Murtt34fy $ui L'cIn' - s '-Y s

                                                                                                     ' 'p * - - -         .

D , j - .. ' i A

                       /- c c e s s Cont ro                       (M,          ,

i - N D rs 4 sm ? - . r

                                                                                                                                                                               's 4                    7                                            4 14 5   .
                                                                                                \                    f" N

3e s b.- .-..I.... l. M k. , j .\ \. 7 11\,

                                                 .,ToFuhn ing ,.                                             -
                                                                                                                               '          ~ ~ ~ - -

J '

                                        /, f anc AuxMiat y;l
                                                      -                                                      Ra d i o-C ou nti ng Room
                                  - ,-                Buitding

{ \, . 8

             /                                     i
                                                                                                                                              ,_        \
             '            '                                                                              ~ N --                                            \ .,

s s s, e l .

                                                                                                  .-              u~--            --

p -

                                                                                                                                                                                            - 1
                          /

Y.

                 /                                                                                                                                                 ,

l t

               /                                                                                                                                                     .'
                                                                                                                                                                                    /                \

4.0 FOR USE IN UNIT l ONLY y (N

    'FOR USE IN UNIT 1 ONLY                                                                                                                                .

1004.29f Revisi 3 f TTACH TI OPERATIORSVSUPPORT NTER OFFICf LMOUT-HP  ;

                                                    ,/

l l

          \

Key to

  • Equipment l ' '

l 4 N * ..

                                           <                            .                  j                              ,r                                         ,
                     .          RM-14 with HP-215 Probe                               -/                                                                            >
                       \          ,                      /
2. . ' Table
                           .'                       ,i                                                                          ,

l i 34 ' Desk [ '

4. File Cabinets /
5. Storage Cabinet unientation l W~  ;
6. Status Boards  !
                                 #                                             f
                                                                             /

l

               ,7.           c'REMP Map                                   -                                                                                           '

8,. ' Cabinets /  !

5. Plant Page Phone
                                                                                                                                             ,/-
            ,/      10.-        First Aid Cabinet                                        -
                                                                                                                                                      ,f              I Emergency Locker h                                                                                                  #

j . 11. as,' prints, e v

     /
                                                                                                                                                 /

j 12. High Rad area Ke 7

      ,/            13.         Xerox Copier                            ,'                                                              /                              l Eouipment in Radio                     n ng Room:        s
                                                                                                                                 /

V , i Lu'dlum-2000 beta-gama Counter-Scaler i ,-',  ! Wide-Beta -

                                                                                                                                             ./

Ortec beta-gama Counter-scaler ,.- . Tri-CIb Liquid Scintillation - .

                                                                                                                           ~
                           /                                                                                                                         /                   .

l l Nucitar Measurements Corp. beta-gama, alpha Countet-Scalers / l  !

                . Stabilized Assay Meters
                                                                                                                       'N x                                                /

l / -

                                                                                                                                                     ,/
                                                                                                       ,                       \
      '%ut j                                                                                                                                    j'
         /                                                                                                                     Ih j

y' 0

                                                                                                                                                               /

5.0 FOR USE IN UNIT I ONLY

                                                                                                                                                     }}}