i 00LKETED USHRc UNITED STATES OF AMERICA E 17 P3:00 NUCLEAR REGULATORY COMMISSION 1
CFFlcr.w -
Before the Atomic Safety and Licensin603cugfo.$,7jI 3
dRANCy In the Matter of
)
)
Philadelphia Electric Company
)
Docket Nos. 50-352
)
50-353 (Limerick Generating Station,
)
Units 1 and 2)
)
APPLICANT'S SUBMISSION OF DIRECT TESTIMONY RELATING TO CONTENTIONS I-62, V-3a AND V-3b, AND V-4 Pursuant to the Atomic Safety and Licensing Board's Memorandum and Order Confirming Prehearing Conference Rulings on Status of Certain Parties and Schedule Regarding Certain Contentions (slip op.
at 4)
(October 20, 1983),
Applicant is submitting the following direct testimony relating to Contentions I-62, V-3a and V-3b, and V-4:
I-62 1.
Statement of Sampath Ranganath, Lloyd S.
- Burns, Jr.,
Franklin E.
Cooke, and Stephen E.
Carter in Support of Motion for Summary Disposition of Contention I-62.
2.
Professional Qualifications of Sampath Ranganath,
- Manager, Mechanics
- Analysis, Nuclear Engineering Division, General Electric Company.
3.
Professional Qualifications of Lloyd S.
- Burns, Jr.,
Technical Leader, Containment and Radiological Engi-neering, Nuclear Engineering Division, General Electric Company.
K Oh&
PDR 3
_ -4 4.
Professional Qualifications of Franklin E.
- Cooke, Principal Design Engineer, Reactor Pressure Vessel &
Internals Design, Nuclear Engineering Division, General Electric Company.
5.
Professional Qualifications of Stephen E.
- Carter, Engineer, Plant Materials Application, Nuclear Engi-neering Division, General Electric Company.
6.
Professional Qualifications of Craig D.
Sawyer, Manag-er, Systems Integration, Nuclear Engineering Division, General Electric Company.W b
V-3a and V-3b 1.
Testimony of Jack G.
Brown, Columbia Gas Transmission Corporation, Director of Transmission Engineering, Related to Contention V-3b, together with Jack G.
Brown, Professional Qualifications.
2.
Testimony of Vincent S.
Boyer, Senior Vice President, Nuclear Power, Philadelphia Electric Company Regarding Contentions V-3a and V-3b.
l 1
l 1/
Mr.
Sawyer participated in the preparation of the l
Testimony of Sampath Ranganath, et al.,
and in l
particular in the responses to Questions 2, 3, 4, 5 and i
14.
2_/
The testimony of a representative of the ARCO Pipe Line
/
Company will be transmitted when a subpoena requested by the Applicant has been issued by the Licensing Board.
_3_
,w 3.
Testimony of Walter C. Payne With Regard to Contentions V-3a and V-3b, with attached Site Plan.3/
4.
Testimony of John D. Walsh Related to Contentions V-3a and V-3b with three attachments and Professional Qualifications, John D.
- Walsh, Science Specialist, Bechtel Group, Inc.
V-4 1.
Affidavit of Maynard E.
Smith and David Seymour in Support of a Motion for Summary Disposition Regarding Contention V-4 with attached Statements of Professional Qualifications of Maynard E.
Smith and David E.
Seymour.
2.
Testimony of Vincent S.
Boyer, Senior Vice President, Nuclear Power, Philadelphia Electric Company Regarding Contention V-4.
Respectfully submitted, CONNER & WETTERHAHN, P C.
f3
~~ -
Mark J. Wetterhahn, Esq.
Counsel for the Applicant November 14, 1983 3/
Full size copies of the Site Plan are being sent to the Board, the NRC Staff, and Mr. Anthony.
Reduced copies
~
of the Site Plan will be sent to the remainder of the Service List later this week.
>